Energizer Force 3S Force-Series-SP Single Phase Inverter Installation Guide
- June 12, 2024
- Energizer
Table of Contents
Energizer Force 3S Force-Series-SP Single Phase Inverter
Product Information
The Energizer Force 3.0S-6.0S Single Phase Inverter is a high-quality inverter
designed for efficient power conversion. It comes with various components and
accessories to ensure proper
installation and usage.
Packing List
- 1 Inverter
- 1 Bracket
- 4 DC connectors (F/M)
- 1 AC connector
- 3 Expansion tubes
- 3 Expansion screws
- 4 DC pin contacts (2 positive, 2 negative)
- 1 Earth terminal
- 1 Communication connector
- 1 Quick installation guide
- 1 CT (Optional)
- 1 WiFi/LAN/GPRS (Optional)
- 1 Meter (Optional)
- 2 Unlock tools
Inverter Installation
Please follow the steps below for proper installation of the inverter:
Step 1: Fix the bracket on the wall
- Choose the place you want to install the inverter.
- Place the bracket on the wall and mark the position of the 3 holes from the bracket.
- Drill holes with an electric drill, making sure the holes are at least 50mm deep.
- Tighten the expansion tubes by inserting them into the holes and tightening them.
- Install the bracket with the expansion screws.
Step 2: Match the inverter with wall bracket
Hang the inverter over the bracket, slightly lower the inverter, and make sure the two mounting grooves on the back are properly fixed with the two bracket bars.
Wiring Steps
Follow the instructions below for proper wiring:
AC Wiring
– Cable dimensions:
Model | Force 3S | Force 3.6S | Force 4.6S | Force 5S | Force 6S |
---|---|---|---|---|---|
Cable | Micro-Breaker 25A | Micro-Breaker 25A | Micro-Breaker 40A | Micro-Breaker | |
40A | Micro-Breaker 40A | ||||
Plug | Pin contact cable nut | Pin contact cable nut | Pin contact cable nut | Pin | |
contact cable nut | Pin contact cable nut |
Grounding Wiring
Screw the ground screw with a screwdriver as shown in the documentation.
Startup Procedure
Follow the steps below to start up the inverter:
- Trim all the wires to 52.5mm and the PE wire to 55mm.
- Use the crimping pliers to trim 12mm of insulation from all wire ends as shown in the picture.
- L: Brown/Red Wire
- N: Blue/Black Wire
- PE: Yellow & Green Wire
- Loosen the cable nut and detach it from the female insert.
- Remove the cable nut (with rubber insert) from the back shell.
To view all relevant documentation such as Install Manuals and Remote Monitoring guides, scan the QR code provided in the user manual.
Contact Details
V2.0 10-203-000003-04
Packing List
Object| Quantity| Descripon| Object| Quantity|
Description
---|---|---|---|---|---
A| 1| Inverter| I| 1| Communication connector
B| 1| Bracket| J| 1| Quick installaon guide
C| 4| DC connector (F/M)| K| 1| CT (Optional)
D| 1| AC connector| L| 1| WiFi/LAN/GPRS(Optional)
E| 3| Expansion tube| M| 1| Meter (Optional)
F| 3| Expansion screw| N| 2| Unlock tool
G
|
4
| DC pin contact
(2positive, 2negative)
| | |
H| 1| Earth terminal| | |
Push the threaded sleeve to the connection terminal until both are locked tightly on the inverter.
Remove the AC connector, press the bayonet out of the slot with a small screwdriver or the unlock tool and pull it out, or unscrew the threaded sleeve, then alumni out
DC Wiring
-
Turn off the DC switch.
-
Choose 12 AwG wire to connect the PV module
-
Trim 6mm of insulation from the wire end.
-
Separate the DC connector as below.
Inverter Installation
Please make sure the inverter will be installed with a proper distance as shown below
Position | Min Size |
---|---|
Left | 30cm |
Right | 30cm |
Top | 30cm |
Bottom | 30cm |
Front | 30cm |
Step 1: Fix the bracket on the wall Choose the place you want to install the inverter. Place the bracket on the wall and mark the position of the 3 holes from bracket.
Drill holes with electric drill, make sure the holes are at least 50mm deep, and then tighten the expansion tubes.
Insert striped cable into pin contact and ensure all conductor strands are
captured in the pin contact.
Crimp pin contact by using a crimping plier. Put the pin contact with striped
cable into the corresponding crimping pliers and crimp the contact.
Insert pin contact through the cable nut to assemble into back of the male or female plug. When you feel or hear a “click” the pin contact assembly is seated correctly.
Unlock the DC connector
- Use the specified wrench tool.
- When separating the DC + connector, push the tool down from the top.
- When separating the DC – connector, push the tool down from the bottom.
- Separate the connectors by hand.
- Insert the expansion tubes into the holes and tighten them. Install the bracket
Step 2: Match the inverter with wall bracket
Hang the inverter over the bracket, slightly lower the inverter, and make sure
the two moun?ng grooves on the back are properly fixed with the two bracket
bars.
Wiring Steps
AC Wiring
Cable dimensions
Model| Force 3S| Force 3.6S| Force 4.6S| Force 5S|
Force 6S
---|---|---|---|---|---
Cable| 4mm²| 4mm²| 6mm²| 6mm²| 6mm²
Micro-Breaker| 25A| 25A| 40A| 40A| 40A
Grounding Wiring
Screw the ground screw with screwdriver as shown below.
Startup Procedure
- After checking all connections are correct, turn on the external DC /AC breakers.
- Turn the DC switch to“ON” position.
- Inverter will start automatically when PV panels generate enough energy, the LED will be green.
- Complete inverter Start-up guide
After the initial start-up the inverter, display will go to the language settings page, short press to switch language and long press to confirm selection. Once the language set, display will guide to set the safety
regulation. Short press to switch safety regulation, and long press to confirm selection.
Trim all the wires to 52.5mm and the PE wire to 55mm.
Use the crimping pliers to trim 12mm of insulation from all wire ends and
tighten them. Install the bracket as shown in the picture.
Note: Please refer to local cable type and color for actual installation.
Separate the AC plug into three parts as below.
-
Hold the middle part of the female insert, rotate the back shell to loosen it, and detach it from female inset.
-
Remove the cable nut (with rubber insert) from the back shell.
- Slide the cable nut, then the back shell onto the cable.
- Push the threaded sleeve into the socket, ghten up the cap on the terminal.
Note:
- When starting the inverter for the first time, the country code will be set by default to the local settings. Please check if the country code is correct.
- Set the time on the inverter using the button or by using the APP.
To view all relevent documentation such as Install Manuals and Remote Monitoring guides, scan the QR code below.
Contact Details
8 Star Energy Pty Ltd. | Level 35, 477 Collins Street, Melbourne, VIC 3000,
Australia 8 Star Energy ESS Ltd. | The Black Church, St Mary’s Place, Dublin,
DO7 P4AX, Ireland 8 Star Energy North America Inc. | 888 Prospect Street, La
Jolla, California, 92037, USA
© 2023 Energizer. Energizer and certain graphic designs are trademarks of
Energizer Brands, LLC and related subsidiaries and are used under license by 8
Star Energy Pty Ltd. All other brand names are trademarks of their respec?ve
owners. Neither 8 Star Energy Pty Ltd nor Energizer Brands, LLC is affiliated
with the respec?ve owners of their trademarks.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>