Tools Required

The following tools will be required to install PS-M and PS-S.Energizer-
Powerstack-Flexible-Storage-System-FIG-1

Packing List

Energizer-Powerstack-Flexible-Storage-System-
FIG-2

Terminals

Energizer-Powerstack-Flexible-Storage-System-
FIG-3

Installation Steps

Step 1
Install a PS-S with four foot stand (Item C) and place it on the ground and adjust it to the level. After installing the foot stand, use a track level bar to confirm the level. Insert the waterproof cover (Item J) into the bottom of the battery and lock it in place with the clip.

Step 2
Place the battery 20mm against the wall.
Note: Please make sure the Operating St- atus LED is on vour left handside when you facing the battery model.Energizer-Powerstack-Flexible-
Storage-System-FIG-4

Step 3
Stack the batteries one by one. Step 4
Place the two fixing brackets (Item B) close to the wall and install them on both sides of the battery.

Step 5
Mark the wall through the bracket hole.

Step 6
Punch after removing the PS-M. Drill holes with the electric drill, make sure the holes are at least 50mm deep, and then tighten the expansion tubes (Item I).

Step 7
After stacking PS-M again, fix the battery on the wall. Step 8
Fix the mounting screw packs on both sides of the battery, the installation is over.

Note: Please make sure each system includes 1 PS-M and 1 PS-S. PS-S less than 6 pieces:

Please refer to the video for the installation of the junction box and the cable gland.Energizer-Powerstack-Flexible-Storage-System-
FIG-11

Wiring Steps

A : Connect the inverter and make sure the wiring position is correct, as shown in the figure below.
Note: Inverter wiring refers to the inverter user manual.
For outdoor use, please use item K and proceed as follows
Connection steps:
Step 1 : Prepare a standard network cable and cable connector, then insert the network cable through the cable connector.

Step 2: Crimp the cable with a Rj45 plug which is inside of the cable connector.Energizer-Powerstack-Flexible-Storage-System-
FIG-13

If the usage is indoor, please use item D
Step 3: Insert the cable connector into BMS port at the bottom of inverter and screw it tightly.Energizer-Powerstack-Flexible-Storage-System-
FIG-14

B: C onnect the grounding cable. The figure is shown in below.

System Start-Up

PM operation:

  1. Normal mode: When there is PV and grid access, turn on the DC switch first, then press the “POWER” button.
  2. Black start: When there is no PV and grid access, turn on the DC switch first, then press the “POWER” button, then press and hold the “B-Start ” button and release it after 10s.

Startup steps:
Turn on the DC switch and press the POWER switch. The alarm display and Alarm LED on PS-S/PS-M will light up at the same time for 1s to prove that the system is powered on successfully. The control panel is shown in below.

To view all relevant documentation such as Install Manuals and Guides, scan the QR code below.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals