METROPOLITAN N7359-790 Prima Vista 8-Light Aged Antique Brass Island Chandelier with Clear Acrylic Accents Instruction Manual

June 12, 2024
Metropolitan

METROPOLITAN Logo N7359-790 Prima Vista 8-Light Aged Antique Brass Island Chandelier with Clear Acrylic Accents
Instruction Manual
Item# N7359-790 (New. 2022/5/20)

WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER.

METROPOLITAN N7359 790 Prima Vista 8 Light Aged Antique Brass Island
Chandelier with Clear Acrylic Accents - Mounting

ASSEMBLING THE FIXTURE (FIG. 1 & Fig. 4)

  1. Shut off power at the fuse box or circuit breaker box and remove the old fixture including the mounting hardware.
  2. Carefully unpack your new fixture and lay out all the parts in a clean area. Take care not to misplace any small parts necessary for installation.
  3. The arms have been placed to lay flat for shipping. Adjust arms to proper position. (See Fig. 4)
  4. Thread fixture loop (H) onto all thread (J) of upper assembly (K).
  5. Secure stems (M) to all thread (O) of socket assembly (S). Then thread upper assembly (K) to stem (M).
  6. Carefully place bolts (N) through holes on top of frame assembly (R). Then tighten with plastic washers and finials (Q).

ASSEMBLING THE FIXTURE (FIG. 2)

  1. Thread the all thread(C) into the center lock hole of the crossbar (A) with lock washer (Y1) and hex nut (Y2) until snug. Note: The length of all thread (C) into crossbar may be adjusted if necessary.
  2. Take crossbar (A) assembly and mount to ceiling junction box (Not included) using mounting screws (B) (Size: # 8-32N*L1”). The side of crossbar (A) marked “GND” must face out..
  3. Attach quick link (F) to fixture loop (H) and chain (G). Quick link must be completely closed when installed. By measuring, determine correct number of links needed for desired hanging height. Use a pair of chain pliers to open one end link of chain and discard excess chain. Attach quick link (F) to the loop on bottom of canopy(D), then close quick link (F). Carefully lace fixture wires through chain links and pull until tight. Feed wires through canopy and all thread, then pull until tight.
  4. The support cable is provided to support the weight of the fixture while wiring. Align the fixture to the crossbar(A) and attach hook(T) on the end of support cable(I) into a slot located on crossbar(A). Carefully allow the support cable(I) to support the weight of the fixture while wiring

CONNECTING THE WIRE (Fig. 3)

  1. Connect the electrical wires as shown in Fig. 3, making sure that all wire connectors are secured. If your junction box has a ground wire (green or bare copper), connect the fixture’s ground wire to it. Otherwise, connect the fixture’s ground wire directly to crossbar using the green screw provided.
  2. Tuck wire connections neatly into junction box.

COMPLETING THE INSTALLATION (Fig. 1)

  1. Attach the canopy(D) over the end of the all thread(C) and secure with the hex nut(Y2) until snug.
  2. Thread the finial(E) onto the end of the all thread(C) and hand tighten snug.
  3. Install (8) eight candelabra base bulbs (P) up to 60 watts each or CFL or LED equivalent (not included) in accordance with the fixture specification.
    DO NOT EXCEED THE MAXIMUM WATTAGE RATING!

Your installation is now complete. Return power to the junction box and test the fixture.
Note: Illustration (Fig. 1) on this manual is for installation purposes only. It may or may not be identical to the fixture purchased.

Notice: It is important to use proper chain pliers (not included) To OPEN and CLOSE the chain included with this fixture. Do not open them with other tools that may twist or stress the chain links. It is important to use proper chain pliers like the ones shown in the diagram.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Metropolitan User Manuals

Related Manuals