bathlife Dagg Tapp Ceiling Shower Set Instruction Manual

June 12, 2024
bathlife

bathlife Dagg Tapp Ceiling Shower Set

Important information

| Before installation, check the following component list carefully
---|---
| Before installation, flush pipes carefully
| For installation, hire a licensed and/or authorised professional.
| For installation, connect the hot and cold water supply properly
| After installation, turn on the water to check leakage in each joint.

Recommended operating temperature: 4 −90 °C
Recommended operating pressure: 1 − 6 bar

Tools

  • Spirit-level

  • Measure tape

  • Drill

  • Pen

  • Spanner

  • Allen key

  • Screw driver

  • Wall drill bit

Components

Tightening

  1. Drill
  2. Seal
  3. Plug
  4. Screw

Concrete or other massive material.

Wood beams, nogging pieces, or other base tested and approved for mounting, such as some boards.

Assembly

Drawing

DAGG TAPP

All dimension has error ± 5 mm, the actual installation size should be basic on the actual product.

Maintenance

| If you have questions, please contact us.
---|---
| If any part is broken, do not use the product before repairing it
| When cleaning , do not use bleaching or abrasive chemicals.
| When cleaning in general, use a soft cloth and gloves.

Turn off all valves to stop any water flow during any maintenance

Removing or inserting cartridge

Perform the steps in the reverse order after inserting a new cartridge.

Cleaning of cartridges

Once removed, soak the cartridge in detergent or white vinegar for 1 hour. After, rinse thoroughly with water. Reinsert according to the removal and reinsertion guide

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals