bathlife Dagg Tapp Ceiling Shower Set Instruction Manual
- June 12, 2024
- bathlife
Table of Contents
bathlife Dagg Tapp Ceiling Shower Set
Important information
| Before installation, check the following component list carefully
---|---
| Before installation, flush pipes carefully
| For installation, hire a licensed and/or authorised professional.
| For installation, connect the hot and cold water supply properly
| After installation, turn on the water to check leakage in each joint.
Recommended operating temperature: 4 −90 °C
Recommended operating pressure: 1 − 6 bar
Tools
-
Spirit-level
-
Measure tape
-
Drill
-
Pen
-
Spanner
-
Allen key
-
Screw driver
-
Wall drill bit
Components
Tightening
- Drill
- Seal
- Plug
- Screw
Concrete or other massive material.
Wood beams, nogging pieces, or other base tested and approved for mounting, such as some boards.
Assembly
Drawing
DAGG TAPP
All dimension has error ± 5 mm, the actual installation size should be basic on the actual product.
Maintenance
| If you have questions, please contact us.
---|---
| If any part is broken, do not use the product before repairing it
| When cleaning , do not use bleaching or abrasive chemicals.
| When cleaning in general, use a soft cloth and gloves.
Turn off all valves to stop any water flow during any maintenance
Removing or inserting cartridge
Perform the steps in the reverse order after inserting a new cartridge.
Cleaning of cartridges
Once removed, soak the cartridge in detergent or white vinegar for 1 hour. After, rinse thoroughly with water. Reinsert according to the removal and reinsertion guide
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>