FS S3910 Series Managed L2+ Gigabit Switches User Guide

June 12, 2024
FS

FS Logo S3910 Series Managed L2+ Gigabit Switches
User GuideFS S3910 Series Managed L2 + Gigabit
Switches

Introduction

Thank you for choosing S3910 Series Stackable Managed Switches. This guide is designed to familiarize you with the layout of the switch and describes how to deploy the switch in your network.

FS S3910 Series Managed L2 + Gigabit Switches 1

Accessories

S3910-24TF

FS S3910 Series Managed L2 + Gigabit Switches -
Accessories

S3910-24TS/S3910-48TS

FS S3910 Series Managed L2 + Gigabit Switches - Accessories
1

NOTE: S3910 series switches have dust plugs delivered with them. Keep the dust plugs properly and use them to protect idle optical ports.

Hardware Overview

Front Panel Ports
S3910-24TF

FS S3910 Series Managed L2 + Gigabit Switches - Front Panel
Ports

Ports Description
RJ45 10/100/1000BASE-T ports for Ethernet connection
SFP SFP ports for 1G connection
CONSOLE An RJ45 console port for serial management

S3910-24TS

FS S3910 Series Managed L2 + Gigabit Switches - Front Panel Ports
1

S3910-48TS

FS S3910 Series Managed L2 + Gigabit Switches - Front Panel Ports
2

Ports Description
RJ45 10/100/1000BASE-T ports for Ethernet connection
SFP+ SFP+ ports for 1/10G connection
CONSOLE An RJ45 console port for serial management

Front Panel Button
S3910-24TF/S3910-24TS/S3910-48TS

FS S3910 Series Managed L2 + Gigabit Switches - Front Panel
Button

Button Description
RESET Restart: Press and hold the RESET button for more than five

seconds, and then wait for ten seconds.

Back Panels
FS S3910 Series Managed L2 + Gigabit Switches - Back
Panels Front Panel LEDs
S3910-24TF

FS S3910 Series Managed L2 + Gigabit Switches - Front Panel
LEDs

LEDs Status Description
STATUS Off Switch is not receiving power.
Blinking Green System is being initialized.
Solid Green Switch is operational.
Solid Red 1. Severe temperature warning:

The temperature severely exceeds the temperature limit, so the system is going to restart.
2. The switch is faulty.
LEDs| Status| Description
---|---|---
RJ45| Off| The port is not connected.
Solid Green| The port is connected at 1000 Mbps.
Solid Yellow| The port is connected at 10/100 Mbps.
Blinking Green| The port is receiving or transmitting traffic at 1000 Mbps.
Blinking Yellow| The port is receiving or transmitting traffic at 10/100 Mbps.
SFP| Off| The port is not connected.
Solid Green| The port is connected.
Blinking Green| The port is receiving or transmitting traffic.

FS S3910 Series Managed L2 + Gigabit Switches - Front Panel
LED

LEDs Status Description
STATUS Off Switch is not receiving power.
Blinking Green System is being initialized.
Solid Green Switch is operational.
Solid Yellow Moderate temperature warning:

Check the working environment of the switch immediately.
Solid Red| 1. Severe temperature warning: The temperature severely exceeds the temperature limit, so the system is going to restart.
2. The switch is faulty.
PWR1/PWR2| Off| No power supply module is connected.
Solid Green| A power supply is connected and able to work.
Solid Red| A redundant power supply fails or no AC cable is connected.
ID| Off| Locating is disabled.
Solid Blue| Locating is enabled. Operation and maintenance staff turn on and off the LED remotely.
RJ45| Off| The port is not connected.
Solid Green| The port is connected at 1000 Mbps.
Blinking Green| The port is receiving or transmitting traffic at 1000 Mbps.
Solid Yellow| The port is connected at 10/100 Mbps.
Blinking Yellow| The port is receiving or transmitting traffic at 10/100 Mbps.
SFP+| Off| The port is not connected.
Solid Green| The port is connected.
Blinking Green| The port is receiving or transmitting traffic.

Installation Requirements

Before you begin the installation, make sure that you have the followings:

  • Phillips screwdriver.
  • Standard-sized, 19″ wide rack with a minimum of 1U height available.
  • Category 5e or higher RJ-45 Ethernet cables, fiber optical cables and console cable for connecting network devices.

Site Environment:

  • Do not operate it in an area that exceeds an ambient temperature of 50°C.
  • The installation site must be well ventilated. Ensure that there is adequate airflow around the switch.
  • The switch should be installed at least 1U (44.45mm) away from devices to its sides.
  • Be sure that the switch is level and stable to avoid any hazardous conditions.
  • Do not install the equipment in a dusty environment.
  • The installation site must be free from leaking or dripping water, heavy dew, and humidity.
  • Ensure rack and working platforms are well earthed.

Mounting the Switch

Desk Mounting

FS S3910 Series Managed L2 + Gigabit Switches - Desk
Mounting

  1. Attach four rubber pads to the bottom.
  2. Place the chassis on a desk.

Rack Mounting

FS S3910 Series Managed L2 + Gigabit Switches - Rack
Mounting

  1. Secure the mounting brackets to the two sides of the switch with the supplied M4 screws.FS S3910 Series Managed L2 + Gigabit Switches - Rack Mounting 1
  2. Attach the switch to the rack using four M6 screws and cage nuts.

Wall Mounting

FS S3910 Series Managed L2 + Gigabit Switches - Wall
Mounting

  1. Attach the mounting brackets to the switch with the supplied M4 screws.FS S3910 Series Managed L2 + Gigabit Switches - Wall Mounting 1
  2. Use the expansion screws to securely attach the mounting brackets on the wall.

NOTE: Suitable for mounting on concrete or other non-combustible surface only.

Installing the Power Supply Module
S3910-48TS/S3910-24TS

FS S3910 Series Managed L2 + Gigabit Switches - Power Supply
Module

  1. Take a new power module out of the package.
  2. Take the plane printed with power information as the top panel of the power module. Hold the handle of the power module with one hand, and hold the end of the power module with the other hand. Insert it into the chassis along the guide rail steadily and slowly until a click is heard, and make sure that it is in good contact with the power slot.

NOTE:

  1. S3910-24TF switch has one built-in power supply.
  2. Insert the power module steadily. Please pay attention to the direction of the power panel to avoid wrong insertion. If the position is not proper, press the plug of the power module and hold on to the module handle with one hand to pull it out slowly, then re-insert it.

Grounding the Switch

FS S3910 Series Managed L2 + Gigabit Switches - Grounding the
Switch

  1. Connect one end of the grounding cable to a proper earth ground, such as the rack in which the switch is mounted.
  2. Secure the grounding lug to the grounding point on the switch back panel with the washers and screws.

Connecting the Power

FS S3910 Series Managed L2 + Gigabit Switches - Connecting the
Power

  1. Plug the AC power cord into the power port on the back of the switch.
  2. Connect the other end of the power cord to an AC power source.

WARNING: Do not install power cable while the power is on.
Connecting the RJ45 Ports

FS S3910 Series Managed L2 + Gigabit Switches - Connecting the RJ45
Ports

  1. Connect an Ethernet cable to the RJ45 port of a computer, printer, network storage, or other network devices.
  2. Connect the other end of the Ethernet cable to the RJ45 port of the switch.

Connecting the SFP/SFP+ Ports

FS S3910 Series Managed L2 + Gigabit Switches - Connecting the SFP SFP+
Ports

  1. Plug the compatible SFP/SFP+ transceiver into the SFP/SFP+ port.
  2. Connect a fiber optic cable to the fiber transceiver. Then connect the other end of the cable to another fiber device.

WARNING: Laser beams will cause eye damage. Do not look into bores of optical modules or optical fibers without eye protection.
Connecting the Console Port

FS S3910 Series Managed L2 + Gigabit Switches - Connecting the Console
Port

  1. Insert the RJ45 connector into the RJ45 console port on the front of the switch.
  2. Connect the DB9 female connector of the console cable to the serial port on the computer.

Stacking the Switches

The S3910 series switches support stacking up to 4 units. Switches in the series can be physically stacked using optical fiber cables connected to SFP/SFP+ transceivers or 1/10G Direct Attach Cables (DAC).

FS S3910 Series Managed L2 + Gigabit Switches - Stacking the
Switches

NOTE:

  1. S3910-24TF switch supports stacking with the same models together. S3910-24TS/S3910-48TS switches support stacking with each other.
  2. S3910-48TS switch only supports port 51 & 52 for physical stacking.

Configuring the Switch

Configuring the Switch Using the Web-based Interface
Step 1: Connect the computer to the business port of the switch using the network cable.
Step 2: Set the IP address of the computer to 192.168.1.x. (“x” is any number from 2 to 254.)

FS S3910 Series Managed L2 + Gigabit Switches - Configuring the
Switch

Step 3: Open a browser, type http://192.168.1.1, and enter the default username and password, admin/admin.

Step 4: Click Login to display the web-based configuration page.
Configuring the Switch Using the Console Port
Step 1: Connect a computer to the switch’s console port using the console cable.
Step 2: Start the terminal simulation software such as HyperTerminal on the computer.
Step 3: Set the parameters of the HyperTerminal: 9600 bits per second, 8 data bits, no parity, 1 stop bit and no flow control.

FS S3910 Series Managed L2 + Gigabit Switches -
Configuring

Step 4: After setting the parameters, click Connect to enter.

Troubleshooting

1/10G Port is not Working
In the case of compatible cables and transceivers, the port cannot be up, please try to modify the port mode to adapt or force the port speed to 1/10G.
Connecting the Switch Remotely Unsuccessfully

  1. Test network connectivity through ping.
  2. If the network is reachable, try restarting the switch.
  3. Check if the corresponding service is enabled.

The Port is not Working, the LED Indicator is Off

  1. Ensure the switch ports are in the no shutdown state.
  2. Check if the switch can read the DDM information.
  3. Check if the port speed setting is correct.
  4. Try looping the switch cable.

Support and Other Resources

Product Warranty

FS ensures our customers that any damage or faulty items due to our workmanship, we will offer a free return within 30 Days from the day you receive your goods. This excludes any custom made items or tailored solutions.
Warranty: S3910 Series Switches enjoy 5 years limited warranty against defect in materials or workmanship. For more details about warranty, please check at https://www.fs.com/policies/warranty.html
Return: If you want to return item(s), information on how to return can be found at https://www.fs.com/policies/day_return_policy.html

Compliance Information

FCC
Note: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.
This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions:

  1. This device may not cause harmful interference, and
  2. this device must accept any interference received, including interference that may cause undesired operation.

CAUTION:
Any changes or modifications not expressly approved by the grantee of this device could void the user’s authority to operate the equipment.
Responsible party (only for FCC matter)
FS.COM Inc.
380 Centerpoint Blvd, New Castle, DE 19720, United States
https://www.fs.com
CE
FS.COM GmbH hereby declares that this device is in compliance with the Directive 2014/30/EU and 2014/35/EU. A copy of the EU Declaration of Conformity is available at www.fs.com/company/quality_control.html
FS.COM LIMITED
24F, Infore Center, No.19, Haitian 2nd Rd,
Binhai Community, Yuehai Street,Nanshan
District, Shenzhen City
FS.COM GmbH
NOVA Gewerbepark Building 7, Am
Gfild 7, 85375 Neufahrn bei Munich, Germany

FS Logo

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

FS User Manuals

Related Manuals