metcalfe EP10, NA10, EP15 and NA15 Bench Mounted Peelers Instruction Manual
- June 12, 2024
- metcalfe
Table of Contents
- metcalfe EP10, NA10, EP15 and NA15 Bench Mounted Peelers
- Features
- Technical Specifications
- Dimensions | Shipping Information
- Optional Extras
- Installation
- Installation of Optional Extras
- Operation
- Cleaning Instructions
- Maintenance
- Metcalfe Warranty
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
metcalfe EP10, NA10, EP15 and NA15 Bench Mounted Peelers
Your Peeler
Metcalfe Bench Potato Peeling Machines
The Metcalfe 10lb (4.5Kg) and 15lb (6.8Kg) potato peeling machines are constructed from food grade, non-corrosive aluminum alloy castings, with the spindle housing and chute cast integrally, eliminating joints and possible leakage.
Features
- Available in natural aluminum or a grey hammer paint finish
- Sink-top / counter-top, pedestal or trolley mounted
- The optional pedestal is 90cm high, making the discharge chute 94cm (37”) high (sink height)
- Complies with all relevant safety standards and is designed for ease of maintenance and cleaning
- All bearings are grease packed and permanently sealed therefore no lubrication is required
- V-belt drove for noiseless transmission, with provision for belt tensioning if required
- The rotor plate coated on both sides, doubling its life. Fine-grained abrasive for new potatoes on one side and coarse-grained for regular potatoes on the other
- The inside wall of the peeling chamber has patented cast-in abrasive serrations which dispense with the need for abrasive coating. Consequently, there is less potato loss during both peeling and boiling and the efficiency of the serrations will last the life of the machine
- Lid is removable without tools so that the rotor plate can be lifted out for cleaning. To clean the chamber, turn on the water and the whole chamber is flushed clean. Cleaning should be carried out daily.
- Water inlet: hose union with nozzle and provision for fitting on either side
- Waste/water outlet: tapped 1½” BSP ready for waste pipe to be connected. Provision for fitting on either side
- CE Approved
Technical Specifications
Model
| Capacity (Kg)| Phase (Ø)| Motor (Volt)| Frequency (Hz)|
AMP (A)| Power (kW / hp)
---|---|---|---|---|---|---
EP10 & NA10| 4.5| 1| 220| 50| 2.8| 0.25 / 0.33
EP15 & NA15| 6.8| 1| 220| 50| 2.8| 0.25 / 0.33
Dimensions | Shipping Information
Model
| Overall Dimensions D x W x H (mm)| Net Weight (Kg)| Packed
Dimensions D x W x H (mm)| Packed Weight (Kg)| Volume (m3)
---|---|---|---|---|---
EP10 & NA10| 576 x 339 x 365| 27| 665 x 265 x 480| 30| 0.04
EP15 & NA15| 576 x 339 x 416| 30| 665 x 265 x 480| 34| 0.04
EP10 & NA10 Drawing
EP15 & NA15 Drawing
Optional Extras
If you wish to purchase any of the accessories detailed here please contact our sales department, see contact details on page 13.
Installation
Unpacking
Unpack the peeler immediately after receipt. Please inspect the peeler to
ensure there is no damage and that all parts are included i.e. water inlet,
rubber lid etc. If the machine is found to be damaged, keep all the packaging
and contact us, or your supplier of the equipment, immediately.
You should receive with your peeler:
- 1 x Box Spanner
- 1 x Water Inlet Nozzle
- 1 x Lifting Hook
- 1 x Instruction Manual
If any of the above items were not received with your peeler, please refer to
page 13 for contact details and inform us immediately for replacements.
The machine should be placed on a bench/worktop or draining board with the
discharge chute overlapping a sink.
If supplied with a pedestal or trolley, please follow these instructions to
install your peeler securely.
Trolley Installation
- Once the trolley is in place ensure that the castors are locked to prevent the trolley from moving during operation.
- Place the peeler onto the top of the trolley. (If required the peeler can be secured to the trolley by removing the rubber feet and drilling holes in the top of the trolley to secure the peeler into place).
Pedestal Installation
If the peeler is to be mounted onto a pedestal it must be secured to the floor as follows:
- Place the pedestal in the desired position. Put the peeler on the pedestal to check the position is correct.
- Once you are happy that the location is right, remove the peeler from the top of the pedestal and mark through the fixing holes at the base of the pedestal, onto the floor.
- Remove the pedestal and drill holes at these marks.
- Secure the pedestal to the floor using M12 rawl bolts (not supplied by Metcalfe Catering Equipment Ltd).
Water Supply Connection
The water inlet nozzle connector is supplied and should be fitted to the outside of the machine facing upwards. It has two possible inlet locations, one on either side of the machine, whichever is more convenient for your installation.
- Thread the water inlet valve (1) onto the elbow joint (2), ensuring a fiber washer (4) is placed between the two. Ensure the valve is tightened securely to eliminate leakages.
- Take the water inlet bush (3) with a fiber washer (4) placed over it and feed through the chamber wall from the inside.
- Place another fiber washer (4) onto the water inlet bush on the exterior side of the chamber. Take the assembly from step 1 and thread the remaining elbow joint opening onto the water inlet bush. Ensure the assembly is tightened securely to eliminate leakages. Also ensure the water inlet valve is pointing directly upwards, otherwise the air gap does not function correctly.
Connect the water supply pipe to the water inlet, and connect the other end of the supply pipe to a cold water tap or shut-off valve that can be used to supply a sufficient water flow into the machine.
Waste Outlet Connection
- The waste outlet is screwed onto the right-hand side of the machine but can be used on either side of the machine to suit your installation. Pipework for the waste outlet can be purchased from a hardware store, or we can supply as an optional extra a waste pipe, elbow and coupling. This is to be fitted to the waste outlet casting to discharge the waste into a sink.
- Having connected the water inlet, waste outlet and the electrical supply, the machine is ready for operation.
Installation of Optional Extras
Installation Kit (optional extra)
-
Comprises a Sink Skip, Length of Waste Pipe, Elbow & Coupling, 3ft Length Water Inlet Hose & Tap Connector.
-
This image shows a typical installation utilizing the kit.
Waste Disposal Adaptor (optional extra)
-
The waste disposal adaptor enables the waste pipe to be connected direct to the drain. It gives an additional water supply to the waste outlet to flush away the sludge.
-
The waste disposal adaptor fits onto the waste outlet on the side of the peeler. Ensure that the waste disposal adaptor is vertical and securely in place.
-
Two adjusting screws and lock nuts are provided to adjust the water flow through the machine. The top one controls the flow through the peeler and the lower one controls the flow to the waste pipe.
Small External Interceptor (optional extra)
- This image shows a typical external interceptor installation.
Tundish (optional extra)
- The use of a tundish meets the requirements of water regulations G19.1, G19.3 & G19.4 contained in “The Water Supply Regulations 1999” and the “Water Byelaws 2000 (Scotland)”.
- The tundish can be fitted instead of the standard water inlet nozzle supplied with all Metcalfe peelers.
Operation
Full operational instructions can be found on the side of each peeler.
The machine works off a 230volt 50Hz 1 Phase supply and comes fitted with a
3-pin 13amp fused plug.
-
Ensure that the chute door is closed.
-
Turn on the machine by pressing the green start button.
-
Turn on the water supply.
-
Remove the rubber lid and load the potatoes through the top of the peeler and replace the lid.
DO NOT load the potatoes before running the unit as this will damage the bearings, shaft assembly & motor and will void the warranty. -
Carefully remove the rubber lid to check the peeling progress.
-
Once peeled, open the door whilst the machine is still running to discharge the potatoes into a sink or bucket.
-
Once empty, you can then switch the machine off.
DO NOT at any point put your hand or any implement into the machine, whilst it is in operation.
Cleaning Instructions
- Daily cleaning should be considered mandatory for all equipment used in the preparation of food. Once your peeler has made contact with any food product, the entire peeler, including removable parts must be thoroughly
- cleaned. This process is to be repeated essentially at least once a day, or at the end of each operation period. If the machine has not been used for a while it must be cleaned before use as well.
-
Switch off the unit at the socket.
-
Remove the metal lid.
-
Unscrew the fixing screw securing the rotor plate using the box spanner provided.
-
Lift out the rotor plate using the lifting hook provided.
-
Turn on the cold water supply to clean the inside of the chamber with a nylon brush.
-
To clean the rotor plate, wash in cold water ONLY using a nylon brush.
NEVER wash the plate in hot water or in a dishwasher as this will remove the coating. -
Use a damp cloth to wipe the outside of the unit.
DO NOT use cleaning materials containing abrasives or bleaches.
Maintenance
How to Adjust Door Cam
Over time the door may loosen slightly. If this happens a door cam has been
fitted to enable the operator to retighten the door.
- Undo the nut underneath the chute to loosen the cam.
- Turn the door cam into position so that the door handle can be locked in place securely.
- Retighten the nut to secure the door cam into its new and correct position.
Spare Parts and Service
- For more information on Metcalfe spare parts, accessories and service support, including breakdown drawings and parts lists please contact us on the details below.
- Please always quote the Serial Number of the machine. This can be found on the serial number plate which is located on the rear of the motor cover.
- .Metcalfe Sales & Spares Department sales@metcalfecatering.com.
- Metcalfe Service Department service@metcalfecatering.com.
- Metcalfe Website www.metcalfecatering.com.
- Metcalfe Telephone Number 01766 830 456
Additional copies of this instruction manual can be obtained by either visiting our website or contacting the sales department.
Metcalfe Warranty
- All Metcalfe products are guaranteed against defects in material and workmanship for a period of one year from the date of Invoice, except where specially noted.
- The Company’s obligation under this warranty is limited to repairing or replacing, without charge, any part or parts found to be defective under normal use, in accordance with the specified operations manual and capacity ratings.
- On all return-to-factory warranty items, it is the responsibility of the purchaser to return the entire unit to the factory, in a clean condition, properly packed and labeled.
- All repairs, alterations or replacement of materials or parts not authorized by Metcalfe will automatically void all warranties in their entirety.
- All Metcalfe slicers (except Simple Line) are covered by a 2-year warranty (1st-year parts and labor, 2nd-year parts only) and full after-sales service.
- All Metcalfe MP mixers and EC20 chippers are covered by a 3-year warranty (1st-year parts and labor, 2nd & 3rd-year parts only) and full after-sales service.
There is a limited 6-month warranty on the following
- Mixer attachments (beater, whisk and dough hook)
- Parts purchased or supplied for the repair of Metcalfe equipment
This warranty does not cover the following
- Failure due to neglect, abuse, careless handling or misuse of the machine
- Failure caused due to improper maintenance
- Blender clutches
- Knives and gears on can openers
- Sharpening of slicer blades
- General wear and tear
Metcalfe and its suppliers reserve the right to make changes in design and specification to any product without prior notification.
Some other products in the Metcalfe portfolio
Food Preparation Machines
- Made in Sweden
Metcalfe Catering Equipment Ltd
- Haygarth Park
- Blaenau Ffestiniog
- Gwynedd, LL41 3PF
- t 01766 830 456 e sales@metcalfecatering.com. www.metcalfecatering.com.