- Product Usage Instructions
- SAFETY CONSIDERATIONS
- INSTALLATION RECOMMENDATIONS
- Check Equipment and Job Site
- Clearance Requirements
- Table 1 – Accessory Usage
- Brazing Connections
- Mechanical Line Set Connections
- Connect Ground and Power Wires
- Start-Up
- Units with Indoor Pistons
- Table 4 – Additional Subcooling Required
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Carrier 25SCA5 Single-Stage Heat Pumps
Product Information
The product is an air conditioning unit. The user manual provides installation instructions and safety considerations for the installation process. The manual emphasizes following safety codes, wearing protective gear, and consulting local building codes and electrical codes. The manual cautions against using air or gases containing oxygen for leak testing or operating refrigerant compressors, as this can lead to an explosion. The manual also provides recommendations for proper installation, including locating the unit away from windows and patios to avoid disturbing customers with noise, avoiding unnecessary turns and bends in refrigerant tubes, and leaving slack between the structure and unit to absorb vibration.
Product Usage Instructions
- Before installation, read the entire instruction manual thoroughly and follow all safety codes and warnings.
- Wear safety glasses, protective clothing, and work gloves during installation.
- Use a quenching cloth for brazing operations and have a fire extinguisher available.
- Make sure the main electrical disconnect switch is in the OFF position before installing, modifying, or servicing the system. Lock out and tag the switch with a suitable warning label.
- Never use air or gases containing oxygen to leak testing or operate refrigerant compressors.
- Locate the unit away from windows, patios
- Ensure that vapor and liquid tube diameters are appropriate for unit capacity.
- Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends.
- Leave some slack between the structure and unit to absorb vibration.
- Avoid direct tubing contact with water pipes, duct work, floor joists, wall studs, floors, and walls. Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap which comes in direct contact with the tubing.
- Ensure that tubing insulation is pliable and completely surrounds the vapor tube.
- When necessary, use hanger straps that are 1 in. wide and conform to the shape of the tubing insulation.
- Isolate hanger straps from insulation by using metal sleeves bent to conform to the shape of the insulation.
- For rooftop applications, locate the unit at least 6 in. above the roof surface.
NOTE: Read the entire instruction manual before starting the installation.
SAFETY CONSIDERATIONS
Improper installation, adjustment, alteration, service, maintenance, or use
can cause an explosion, fire, electrical shock, or other conditions which may
cause death, personal injury, or property damage. Consult a qualified
installer, service agency, or your distributor or branch for information or
assistance. The qualified installer or agency must use factory–authorized kits
or accessories when modifying this product. Refer to the individual
instructions packaged with the kits or accessories when installing. Follow all
safety codes. Wear safety glasses, protective clothing, and work gloves. Use a
quenching cloth for brazing operations. Have a fire extinguisher available.
Read these instructions thoroughly and follow all
warnings or cautions included in the literature and attached to the unit.
Consult local building codes and current editions of the National Electrical
Code (NEC) NFPA 70. In Canada, refer to current editions of the Canadian
electrical code CSA 22.1.
Recognize safety information. This is the safety–alert symbol. When you see
this symbol on the unit and in instructions or manuals, be alert to the
potential for personal injury. Understand these signal words;
DANGER, WARNING, and CAUTION. These words are used with the safety–alert
symbol.
DANGER identifies the most serious hazards which will result in severe
personal injury or death. WARNING signifies hazards that could result in
personal injury or death.
CAUTION is used to identify unsafe practices which may result in minor
personal injury or product and property damage.
NOTE is used to highlight suggestions that will result in enhanced
installation, reliability, or operation.
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Before installing, modifying, or servicing the system, the main electrical
disconnect switch must be in the OFF position. There may be more than 1
disconnect switch. Lock out and tag the switch with a suitable warning label.
WARNING
EXPLOSION HAZARD
Failure to follow this warning could result in death, serious personal injury,
and/or property damage. Never use air or gases containing oxygen for leak
testing or operating refrigerant compressors. Pressurized mixtures of air or
gases containing oxygen can lead to an explosion.
INSTALLATION RECOMMENDATIONS
In some cases, noise in the living area has been traced to gas pulsations from improper installation of equipment.
- Locate the unit away from windows, patios, decks, etc. where unit operation sound may disturb customers.
- Ensure that vapor and liquid tube diameters are appropriate for unit capacity.
- Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends.
- Leave some slack between the structure and unit to absorb vibration.
- When passing refrigerant tubes through the wall, seal the opening with RTV or other pliable silicon–based caulk (see Fig. 1).
- Avoid direct tubing contact with water pipes, duct work, floor joists, wall studs, floors, and walls.
- Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap which comes in direct contact with tubing (see Fig. 1).
- Ensure that tubing insulation is pliable and completely surrounds the vapor tube.
- When necessary, use hanger straps that are 1 in. wide and conform to the shape of tubing insulation (see Fig. 1).
- Isolate hanger straps from insulation by using metal sleeves bent to conform to the shape of the insulation. When the outdoor unit is connected to factory–approved indoor unit, the outdoor unit contains a system refrigerant charge for operation with AHRI rated indoor unit when connected by 15 ft. (4.57 m) of field–supplied or factory accessory tubing. For proper unit operation, check the refrigerant charge using the charging information located on the control box cover and/or in the Check Charge section of this instruction.
IMPORTANT : Maximum liquid–line size is 3/8–in. OD for all residential applications including long lines.
IMPORTANT : Always install the factory–supplied liquid–line filter drier. Obtain replacement filter driers from your distributor or branch.
INSTALLATION
IMPORTANT: All split system and packaged air conditioners must be
installed pursuant to applicable regional efficiency standards issued by the
Department of Energy.
CAUTION
CUT HAZARD
Failure to follow this caution may result in personal injury. Sheet metal
parts may have sharp edges or burrs. Use care and wear appropriate protective
clothing and gloves when handling parts.
Check Equipment and Job Site
Unpack Unit
Move to the final location. Remove the carton taking care not to damage the
unit.
Inspect Equipment
File a claim with the shipping company prior to installation if the shipment
is damaged or incomplete. Locate unit rating plate on unit corner panel. It
contains information needed to properly install unit. Check rating plate to be
sure unit matches job specifications.
Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie-down
bolts should be used and fastened through knockouts provided in unit base pan.
Refer to unit mounting pattern in Fig. 2 to determine base pan size and
knockout hole location. For hurricane tie-downs, contact the distributor for
details and PE Certification (Professional Engineer), if required. On rooftop
applications, mount on level platform or frame. Place unit above a
load–bearing wall and isolate unit and tubing set from the structure. Arrange
supporting members to adequately support unit and minimize transmission of
vibration to the building. Consult local codes governing rooftop applications.
Roof-mounted units exposed to winds above 5 mph may require wind baffles.
Consult the Service Manual – Residential Split System Air Conditioners and
Heat Pumps for wind baffle construction. Unit must be level to within ±2°
(±3/8 in/ft,±9.5 mm/m) per compressor
manufacturer specifications.
Clearance Requirements
When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow 24 in. (609.6 mm) clearance to service end of unit and 48 in. (1219.2 mm) above unit. For proper airflow, a 6–in. (152.4 mm) clearance on 1 side of unit and 12–in. (304.8 mm) on all remaining sides must be maintained. Maintain a distance of 24 in. (609.6 mm) between units or 18 in. (457.2 mm) if no overhang within 12 ft. (3.66 m). Position so water, snow, or ice from roof or eaves cannot fall directly on unit. 18” (457.2 mm) clearance option described above is approved for outdoor units with wire grille coil guard only. Units with louver panels require 24” (609.6 mm) between units. On rooftop applications, locate unit at least 6 in. above roof surface.
UNIT BASE PAN
Dimension in. (mm)
| TIEDOWN KNOCKOUT LOCATIONS in. (mm)
---|---
A| B| C
31–1/2 X 31–1/2 (800 X 800)| 9–1/8 (231.8)| 6–9/16 (166.7)| 24–11/16 (627.1)
35 X 35
(889 X 889)
| 9–1/8 (231.8)| 6–9/16 (166.7)| 28–7/16 (722.3)
Check Defrost Thermostat
Check to defrost thermostat to ensure it is properly located and securely
attached. There is a liquid header with a distributor and feeder tube going
into outdoor coil. At the end of the one of the feeder tubes, there is a 3/8
in. O.D. stub tube approximately 2 in. (50.8 mm) long (see Fig. 3). The
defrost thermostat should be located on stub tube. Note that there is only one
stub tube used with a liquid header, and on most units it is the bottom
circuit.
UNIT OPERATION HAZARD
Failure to follow this caution may result in equipment damage or improper
operation. Do not allow water and/or ice to build up in base pan.Elevate unit
per local climate and code requirements to provide clearance above the
estimated snowfall level and ensure adequate drainage of unit.
Table 1 – Accessory Usage
Accessory
| REQUIRED FOR LOW–AMBIENT COOLING APPLICATIONS (Below 55°F / 12.8°C)|
**REQUIRED FOR LONG LINE APPLICATIONS ***
| REQUIRED FOR SEA COAST
APPLICATIONS (Within 2
miles / 3.22 km)
---|---|---|---
Accumulator| Standard| Standard| Standard
Ball Bearing Fan Motor| Yes†| No| No
Compressor Start Assist Capacitor and Relay| Yes| Yes| No
Crankcase Heater| Yes| Yes| No
Evaporator Freeze Thermostat| Yes| No| No
Hard Shutoff TXV| Yes| Yes| No
Isolation Relay| Yes| No| No
Liquid Line Solenoid Valve| No| See Long–Line Application Guideline| No
Motor Master® Control or Low Ambient Switch| Yes‡| No| No
Support Feet| Recommended| No| Recommended
- For tubing line sets between 80 and 200 ft. (24.38 and 60.96 m) and/or 20 ft. (6.09 m) vertical differential, refer to Residential Piping and Long Line Guideline.
- additional requirement for Low–Ambient Controller (full modulation feature) MotorMaster® Control.
- In units equipped with ECM OD motor, motor needs to be replaced per unit accessory guide to work properly. This motor kit comes with a new defrost board that also needs to be installed. Unit will not meet AHRI-rated efficiency once motor and control board are replaced to use this accessory.
WARNING
PERSONAL INJURY AND ENVIRONMENTAL
HAZARD
Failure to follow this warning could result in personal injury or death.
Relieve pressure and recover all refrigerant before system repair or final
unit disposal. Use all service ports and open all flow–control devices,
including solenoid valves.
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation. If ANY refrigerant tubing is buried, provide a 6–in (152.4 mm)
vertical rise at the service valve. Refrigerant tubing lengths up to 36–in
(914.4 mm). may be buried without further special consideration. Do not bury
lines longer than 36 in (914.4 mm). Outdoor units may be connected to the
indoor section using an accessory tubing package or field–supplied refrigerant
grade tubing of the correct size and condition. For tubing requirements beyond
80 ft, substantial capacity and performance losses can occur. Following the
recommendations in the Residential Piping and Long Line Guideline will reduce
these losses. Refer to Table 1 for accessory requirements. Refer to Table 2
for field tubing diameters. There are no buried–line applications greater than
36 in. (914.4 mm) If refrigerant tubes or indoor coils are exposed to the
atmosphere, they must be evacuated to 500 microns to eliminate contamination
and moisture in the system. Outdoor Unit Connected To Factory-Approved Indoor
Unit
The outdoor unit contains an approximate system refrigerant charge for operation with an approved AHRI-rated indoor unit when connected by 15 ft (4.57 m) of field–supplied or factory–accessory tubing, and factory-supplied filter drier.
Some indoor units require additional subcooling to achieve optimal heating performance. Using Table 5 – Additional Subcooling Required, check refrigerant charge for maximum efficiency Service Valves are closed and plugged from the factory. Outdoor units are shipped with a refrigerant charge sealed in the unit. Leave the service valves closed until all other refrigerant system work is complete or the charge will be lost. Leave the plugs in place until line set tubing is ready to be inserted.
Heat pumps require a piston metering device in the liquid service valve for proper heating operation. A piston is shipped in the piston body of the liquid service valve, temporarily held in place with a plastic cap. Do not remove the plastic cap until line set tubing is ready to be installed. Refer to Fig. 4 and follow these steps for piston installation:
- Remove the plastic cap holding piston in piston body of liquid service valve.
- Check that piston size (stamped on side of the piston) matches with number listed on unit rating plate. Return piston to piston body of liquid service valve (either direction).
- Find plastic bag taped to unit containing copper adapter tube, brass nut, and plastic washer.
- Install plastic washer in the seat inside the piston body.
- Fit brass nut onto adapter tube and install tube onto liquid service valve. Tighten nut finger tight, then wrench an additional ½ turn only [15-ft lbs (20.3 N-m)]. Over-tightening may damage the plastic washer and service valve’s piston body.
Brazing Connections
Clean line set tube ends with emery cloth or steel brush. Remove any grit or debris. Connect vapor tube to fitting on outdoor unit vapor service valves (see Table 2). Connect liquid tubing to the adapter tube on the liquid service valve. Use refrigerant-grade tubing.
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation. Service valves must be wrapped in a heat–sinking material such as a
wet cloth while brazing. Apply heat-absorbing paste or heat sink product
between the service valve and joint. Wrap service valves with a heat-sinking
material such as a wet cloth. After wrapping the service valve with a wet
cloth, the tubing set can be brazed to service valve using either silver-
bearing or non–silver bearing brazing material. Do not use soft solder
(materials that melt below 800°F/427°C). Braze joints using a Sil-Fos or Phos-
copper alloy. Consult local code requirements. Some outdoor units contain a
mechanical fitting at the liquid distributor.
This connection is not field serviceable and should not be disturbed. For
Liquid Service Valve – Braze line set to adapter tube BEFORE bolting adapter
to the valve. This helps prevent overheating and damage to the plastic washers
or o-ring.
For Vapor Service Valve – remove the valve core from the Schrader port on
Service Valve BEFORE brazing. This helps prevent overheating and damage to
valve seals (refer to Fig. 5). Replace valve core when brazing is completed.
WARNING
FIRE HAZARD
Failure to follow this warning could result in personal injury, death and/or
property damage. The refrigerant and oil mixture could ignite and burn as it
escapes and contacts the brazing torch. Make sure the refrigerant charge is
properly
removed from both the high and low sides of the system before brazing any
component or lines.
Table 2 – Refrigerant Connections and Recommended Liquid and Vapor Tube Diameters (In.)
UNIT SIZE
| LIQUID| RATED **VAPOR *
---|---|---
Connection Diameter| Tube Diameter| Connection Diameter|
Tube Diameter**
18, 24| 3/8| 3/8| 5/8| 5/8
30, 36| 3/8| 3/8| 3/4| 3/4
42, 48| 3/8| 3/8| 7/8| 7/8
60| 3/8| 3/8| 7/8| 1–1/8
- Do not apply capillary tube indoor coils to these units.
- For Tubing Set lengths between 80 and 200 ft. (24.38 and 60.96 m) horizontal or 20 ft. (6.09 m) vertical differential 250 ft. (76.2 m) Total Equivalent Length, refer to the Residential Piping and Long Line Guideline – Air Conditioners and HeatPumps using Puron refrigerant.
Mechanical Line Set Connections
If using mechanical or crimp-type line set connections, follow the crimp tool
manufacturer’s instructions.
NOTE: Should the use of mechanical fittings cause failure of the fittings
or failure of the equipment, such would not be covered under the standard
warranty.
Installing with Indoor Piston
Heat pumps may only be installed with piston-metered indoor units as
replacement components in a piston system. When installing a non-rated heat
pump with a piston indoors the correct piston must be installed, which should
be listed in the indoor installation instructions or product data. Replacement
pistons can be ordered from Replacement Components.
Install Liquid Line Filter Drier Indoor
Refer to Fig. 6 and install filter drier as follows:
- Braze 5 in. (127 mm) liquid tube to the indoor coil.
- Wrap filter drier with a damp cloth.
- Braze filter drier to 5 in. (127 mm) long liquid tube from step 1.
- Connect and braze liquid refrigerant tube to the filter drier.
IMPORTANT: Installation of the filter drier in the liquid line is required.
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation. Installation of filter drier in liquid line is required
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation. Never use the system compressor as a vacuum pump. Refrigerant tubes
and indoor coil should be evacuated using the recommended deep vacuum method
of 500 microns. The alternate triple evacuation method may be used (see triple
evacuation procedure in the service manual). Always break a vacuum with dry
nitrogen.
Deep Vacuum Method
The deep vacuum method requires a vacuum pump capable of pulling a vacuum of
500 microns and a vacuum gage capable of accurately measuring this vacuum
depth. The deep vacuum method is the most positive way of assuring a system is
free of air and liquid water. A tight dry system will hold a vacuum of 1000
microns after approximately 7 minutes. (See Fig. 7.)
Final Tubing Check
IMPORTANT: Check to be certain factory tubing on both indoor and outdoor
unit has not shifted during shipment. Ensure tubes are not rubbing against
each other or any sheet metal. Pay close attention to feeder tubes, makings
sure wire ties on feeder tubes are secure and tight. Make Electrical
Connections
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death. Do
not supply power to unit with the compressor terminal box cover removed. Be
sure field wiring complies with local and national fire, safety, and
electrical codes, and voltage to system is within limits shown on unit rating
plate. Contact local power company for correction of improper voltage. See
unit rating plate for recommended circuit protection device.
NOTE: Operation of unit on improper line voltage constitutes abuse and
could affect unit reliability. See unit rating plate. Do not install unit in a
system where voltage may fluctuate above or below permissible limits.
NOTE: Use copper wire only between the disconnect switch and the unit.
NOTE: Install branch circuit disconnect of adequate size per NEC to
handle unit starting current. Locate disconnect within sight from and readily
accessible from unit, per Section 440–14 of NEC.
Route Ground and Power Wires
Remove the access panel to gain access to the unit wiring. Extend wires from
the disconnect through the power wiring hole provided and into unit control
box.
Connect Ground and Power Wires
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death. The
unit cabinet must have uninterrupted or unbroken ground to minimize personal
injury if an electrical fault should occur. The ground may consist of
electrical wire or metal conduit when installed in accordance with existing
electrical codes. Connect the ground wire to the ground connection in the
control box for safety. Connect the power wiring to the contactor as shown in
Fig. 8.
Table 3 – 3-Phase Monitor LED Indicators
LED | STATUS |
---|---|
OFF | No call for compressor operation |
FLASHING | Reversed phase |
ON | Normal |
Connect Control Wiring
Route 24v control wires through the control wiring grommet and connect leads
to control wiring. See Thermostat Installation Instructions for wiring-
specific unit combinations. (See Fig. 10.) Use No. 18 AWG color–coded,
insulated (35°C minimum) wire. If the thermostat is located more than 100 ft
(30.5 m) from unit, as measured along the control voltage wires, use No. 16
AWG color–coded wire to avoid excessive voltage drop. All wiring must be NEC
Class 2 and must be separated from incoming power leads. Use a furnace
transformer, fan coil transformer, or accessory transformer for control power,
24v/40va minimum. Use of available 24v accessories may exceed the minimum 40va
power requirement. Determine total transformer loading and increase the
transformer capacity or split the load with an accessory transformer as
required
Final Wiring Check
IMPORTANT: Check factory wiring and field wire connections to ensure
terminations are secured properly. Check wire routing to ensure wires are not
in contact with tubing, sheet metal, etc.
Compressor Crankcase Heater
When equipped with a crankcase heater, furnish power to heater a minimum of 24
hr before starting unit. To furnish power to heater only, set the thermostat
to OFF and close the electrical disconnect to the outdoor unit. A crankcase
heater is required if refrigerant tubing is longer than 80 ft (24.38 m), or
when the outdoor unit is 20 ft (6.10 m) below indoor unit. Refer to the
Residential Piping and Long Line Guideline.
Install Electrical Accessories
Refer to the individual instructions packaged with kits or accessories when
installing.
Start-Up
CAUTION
PERSONAL INJURY HAZARD
Failure to follow this caution may result in personal injury. Wear safety
glasses, protective clothing, and gloves when handling refrigerant and observe
the following: Front seating service valves are equipped with Schrader valves.
CAUTION
ENVIRONMENTAL HAZARD
Failure to follow this caution may result in environmental damage. Federal
regulations require that you do not vent refrigerant to the atmosphere.
Recover during system repair or final unit disposal.
CAUTION
UNIT OPERATION AND SAFETY HAZARD
Failure to follow this caution may result in personal injury, equipment damage
or improper operation.
- Do not overcharge system with refrigerant.
- Do not operate unit in a vacuum or at negative pressure.
- Do not disable low-pressure switches in scroll compressor applications.
- Compressor dome temperatures may be hot
Follow these steps to properly start up the system:
- After the system is evacuated, fully open the liquid and vapor service valves.
- Unit is shipped with valve stem(s) front seated (closed) and caps installed. Replace stem caps after the system is opened to refrigerant flow (back seated). Replace caps finger–tight and tighten with wrench an additional 1/12 turn.
- Close electrical disconnects to energize the system.
- Set room thermostat at the desired temperature. Be sure set point is below indoor ambient temperature for cooling mode operation.
- Set room thermostat to HEAT or COOL and fan control to ON or AUTO mode, as desired. Operate unit for 15 minutes. Check system refrigerant charge.
Sequence of Operation
Turn on power to indoor and outdoor units. Transformer is energized.
Cooling
On a call for cooling, the thermostat makes circuits R–O and R–Y, and R–G.
Circuit R–O energizes reversing valve, switching it to cooling position.
Circuit R–Y energizes the contactor, starting outdoor fan motor and compressor
circuit. R–G energizes indoor unit blower relay, starting indoor blower motor
on high speed. When the thermostat is satisfied, its contacts open,
de–energizing the contactor and blower relay. The compressor and motors should
stop. If indoor unit is equipped with a time–delay relay circuit, the indoor
blower will run an additional 90 seconds to increase system efficiency.
Heating
On a call for heating, thermostat makes circuits R–Y and R–G. Circuit R–Y
energizes contactor, starting outdoor fan motor and compressor. Circuit R–G
energizes indoor blower relay, starting blower motor on high speed. Should
temperature continue to fall, R–W2 is made through second– stage room
thermostat. Circuit R–W2 energizes a relay, bringing on first bank of
supplemental electric heat and providing electrical potential to second heater
relay (if used). If the outdoor temperature falls below setting of the outdoor
thermostat (field installed option), contacts close to complete circuit and
bring on second bank of supplemental electric heat. When thermostat is
satisfied, its contacts open, de–energizing the contactor and relay. All
heaters and motors should stop.
Quiet Shift-2
Quiet Shift-2 is a field selectable defrost mode (factory set to OFF), which
will reduce the occasional noise that could be heard at the start of defrost
cycle and restarting of the heating cycle. It is selected by placing DIP
switch 3 on defrost board in the ON position. When Quiet Shift-2 switch is
placed in ON position, and defrost is initiated, the following sequence of
operation will occur: – The compressor will be de-energized for approximately
1 minute, then the reversing valve will be energized. A few seconds later, the
compressor will be re-energized and the normal defrost cycle starts. Once
defrost termination conditions have been met, the following sequence will
occur: – The compressor will be de-energized for approximately 1 minute, then
the reversing valve will be de-energized. A few seconds later, the compressor
will be re-energized and the normal heating cycle starts.
Defrost
The defrost control is a time/temperature control that includes a field-
selectable time period between defrost cycles (30, 60, 90, or 120). The time
period is selected using DIP switches located on the board. The setting is
initial period only then varies with defrost length. The defrost thermostat
senses coil temperature throughout the heating cycle. When the coil
temperature reaches the defrost thermostat setting of approximately 32°F
(0°C), it will close, which energizes the DFT terminal and begins the defrost
timing sequence. The timer runs only when the defrost thermostat is closed and
the contactor is energized. Defrost mode is identical to cooling mode except
that outdoor fan motor stops and second-stage heat is turned on to continue
warming conditioned spaces.
Defrost Speedup
Quiet Shift-2 Models
To initiate a forced defrost, speedup pins (J1) must be shorted with a flat-
head screwdriver for 5 seconds and RELEASED. If the defrost thermostat is
open, a short defrost cycle will be observed (actual length depends on Quiet
Shift-2 switch position). When Quiet Shift-2 is off, only a short 30-second
defrost cycle is observed. With Quiet Shift-2 ON, the speedup sequence is
approximately 3 minutes; 1 minute compressor off period followed by 30 seconds
of defrost with compressor operation. When returning to heating mode, the
compressor will turn off for an additional minute. If the defrost thermostat
is closed, a complete defrost cycle is initiated. If the Quiet Shift-2 switch
is turned on, the compressor will be turned off for two 1-minute intervals as
explained previously. If Quiet Shift 2 is enabled, the variable defrost
intervals will be disabled to provide options where using a specific setting
is desired. In this case the 30, 60, 90, or 120 setting will not change unless
the dipswitch is changed, and power is cycled.
NOTE: Forcing a defrost will reset the defrost interval to the DIP switch
setting before resuming variable length intervals based on defrost cycle
lengths.
Check Charge
Factory charge amount and desired subcooling are shown on unit rating plate.
Additional subcooling may be required to achieve optimal heating performance
based on the installed indoor unit. (see Table 5). The charging method is
shown on the information plate inside unit. For TXV, use the subcooling
method. For piston, use superheat method. To properly check or adjust charge,
conditions must be favorable for subcooling or superheat charging. Favorable
conditions exist when the outdoor temperature is between 70°F and 100°F
(21.11°C and 37.78°C), and the indoor temperature is between 70°F and 80°F
(21.11°C and 26.67°C).
Follow the procedure below
Unit is factory charged for 15ft (4.57 m) of lineset. Adjust charge by adding
or removing 0.6 oz/ft (.018 kg/m) of 3/8 liquid line above or below 15ft (4.57
m) respectively. For standard refrigerant line lengths (80 ft/24.38 m or
less), allow system to operate in cooling mode at least 15 minutes. If
conditions are favorable, check system charge by super heat method for fixed
metering device and subcooling method for TXV. If any adjustment is necessary,
adjust charge slowly and allow system to operate for 15 minutes to stabilize
before declaring a properly charged system. Refer to Table 5 for additional
subcooling required. \If the indoor temperature is above 80°F (26.67°C), and
the outdoor temperature is in the favorable range, adjust the system charge by
weight based on line length and allow the indoor temperature to drop to 80°F
(26.67°C) before attempting to check system charge by subcooling method as
described above. If the indoor temperature is below 70°F (21.11°C), or the
outdoor temperature is not in the favorable range, adjust charge for line set
length above or below 15ft (4.57 m) only. Charge level should then be
appropriate for the system to achieve rated capacity. The charge level could
then be checked at another time when both indoor and outdoor temperatures are
in a more favorable range. If line length is beyond 80 ft (24.38 m) or
greater than 20 ft (6.10 m) vertical separation, See Residential Piping and
Long Line Guideline for special charging requirements. Units with Cooling Mode
TXV
Units installed with cooling mode TXV require charging by the
subcooling method.
- Operate unit a minimum of 15 minutes before checking charge.
- Measure liquid service valve pressure by attaching an accurate gage to service port.
- Measure liquid line temperature by attaching an accurate thermistor type or electronic thermometer to liquid line near outdoor coil.
- Refer to unit rating plate for required subcooling temperature.
- Refer to Table 6. Find the point where required subcooling temperature intersects the measured liquid service valve pressure.
- To obtain required subcooling temperature at a specific liquid line pressure, add refrigerant if liquid line temperature is higher than indicated or reclaim refrigerant if the temperature is lower. Allow a tolerance of ?3°F.
Units with Indoor Pistons
Units installed with indoor pistons require charging by the superheat method. The following procedure is valid when indoor airflow is within 20 percent of its rated CFM.
- Operate unit a minimum of 15 minutes before checking charge.
- Measure suction pressure by attaching an accurate gage to suction valve service port.
- Measure suction temperature by attaching an accurate thermistor type or electronic thermometer to suction line at service valve.
- Measure outdoor air dry–bulb temperature with thermometer.
- Measure indoor air (entering indoor coil) wet–bulb temperature with a sling psychrometer.
- Refer to Table 7. Find outdoor temperature and evaporator entering air wet–bulb temperature. At this intersection, note superheat. Where a dash (––) appears on the table, do not attempt to charge system under these conditions or refrigerant slugging may occur. Charge must be weighted in, adding or removing 0.6 oz/ft of 3/8 liquid line above or below 15 ft (4.57 m) respectively.
- Refer to Table 8. Find superheat temperature located in item 6 and suction pressure. At this intersection, note suction line temperature.
- If unit has a higher suction line temperature than charted temperature, add refrigerant until charted temperature is reached.
- If unit has a lower suction line temperature than charted temperature, reclaim refrigerant until charted temperature is reached.
- When adding refrigerant, charge in liquid form into suction service port using a flow–restricting device.
- If outdoor air temperature or pressure at suction valve changes, charge to new suction line temperature indicated on chart.
- Optimum performance will be achieved when the operating charge produces 5° to 6°F suction superheat at suction service valve with 82°F outdoor ambient and 80°F (26.7°C) dry bulb 67°F (19.4°C) wet bulb indoor temperature (DOE “B” test conditions) at rated airflow.
Heating Check Chart Procedure
To check system operation during heating cycle, refer to the Heating Check
Chart on outdoor unit. This chart indicates whether a correct relationship
exists between system operating pressure and air temperature entering indoor
and outdoor units. If pressure and temperature do not match on chart, system
refrigerant charge may not be correct. Do not use chart to adjust refrigerant
charge.
Table 4 – Additional Subcooling Required
Subcooling Delta from Rating Plate Value
Outdoor Unit Tonnage
Indoor unit | Additional Subcooling Required
18| 24| 30| 36| 42
CAP1917AL*| +5| CAP*2517AL| +5| FM(C,U)4X30AL*| +5| CAP3721AL*| +5|
CAP*4321AL| +3
CAP2517AL*| +5| FM(C,U)4X24AL*| +5| FM(C,U)4Z30*AL| +5| CAP4321AL*|
+5| CAP4821AL| +3
CSPH2412AL| +3| FJ4DNXB30L| +3| CAP3721AL*| +5| | | CAP4824AL| +3
FJ4DNXB24L| +3| FM(C,U)4X30AL*| +5| FM(C,U)4X36AL*| +5| | | |
FB4CNP025L| +3| FM(C,U)4Z30*AL| +5| FM(C,U)4Z36AL*| +5| | | |
FX4DNF019L| +3| | | | | | | |
FX4DNF025L| +3| | | | | | | |
FM(C,U)4X18AL*| +5| | | | | | | |
FM(C,U)4X24*AL| +5| | | | | | | |
FM(C,U)4Z18AL*| +5| | | | | | | |
FM(C,U)4Z24*AL| +5| | | | | | | |
Table 5 – Required Liquid Line Temperatures °F
LIQUID PRESSURE AT SERVICE VALVE (PSIG)| REQUIRED
SUBCOOLING TEMPERATURE (°F)
---|---
8| 10| 12| 14| 16| 18
251| 76| 74| 72| 70| 68| 66
259| 78| 76| 74| 72| 70| 68
266| 80| 78| 76| 74| 72| 70
274| 82| 80| 78| 76| 74| 72
283| 84| 82| 80| 78| 76| 74
291| 86| 84| 82| 80| 78| 76
299| 88| 86| 84| 82| 80| 78
308| 90| 88| 86| 84| 82| 80
317| 92| 90| 88| 86| 84| 82
326| 94| 92| 90| 88| 86| 84
335| 96| 94| 92| 90| 88| 86
345| 98| 96| 94| 92| 90| 88
354| 100| 98| 96| 94| 92| 90
364| 102| 100| 98| 96| 94| 92
374| 104| 102| 100| 98| 96| 94
384| 106| 104| 102| 100| 98| 96
395| 108| 106| 104| 102| 100| 98
406| 110| 108| 106| 104| 102| 100
416| 112| 110| 108| 106| 104| 102
427| 114| 112| 110| 108| 106| 104
439| 116| 114| 112| 110| 108| 106
450| 118| 116| 114| 112| 110| 108
462| 120| 118| 116| 114| 112| 110
474| 122| 120| 118| 116| 114| 112
486| 124| 122| 120| 118| 116| 114
499| 126| 124| 122| 120| 118| 116
511| 128| 126| 124| 122| 120| 118
Table 6 – Superheat Charging (Heat Pu
OUTDOOR TEMP (°F)| EVAPORATOR ENTERING AIR TEMPERATURE
(°F WB)
---|---
50| 52| 54| 56| 58| 60| 62| 64|
67| 68| 70| 72| 74| 76
55| 11| 11| 12| 12| 12| 13| 17| 20| 24| 24| 25| 25| 25| 25
60| 6| 6| 7| 7| 7| 7| 12| 16| 21| 22| 23| 23| 23| 23
65| –| –| –| –| –| 3| 7| 12| 18| 19| 21| 21| 22| 22
70| –| –| –| –| –| –| –| 7| 14| 16| 18| 20| 20| 20
75| –| –| –| –| –| –| –| 3| 11| 13| 16| 18| 18| 19
82| –| –| –| –| –| –| –| –| *6| 8| 12| 15| 16| 17
85| –| –| –| –| –| –| –| –| 4| 7| 11| 14| 15| 16
90| –| –| –| –| –| –| –| –| –| 4| 8| 12| 14| 15
95| –| –| –| –| –| –| –| –| –| –| 6| 10| 12| 14
100| –| –| –| –| –| –| –| –| –| –| 4| 8| 11| 12
105| –| –| –| –| –| –| –| –| –| –| 3| 6| 9| 11
110| –| –| –| –| –| –| –| –| –| –| –| 5| 7| 10
115| –| –| –| –| –| –| –| –| –| –| –| 3| 6| 8
mp Only)
Table 7 – Required Suction–Line Temperature
SUPERHEAT TEMP (°F) | SUCTION PRESSURE AT SERVICE PORT (PSIG) |
---|---|
107.8 | 112.2 |
138.8 | 140.8 |
0 | 35 |
2 | 37 |
4 | 39 |
6 | 41 |
8 | 43 |
10 | 45 |
12 | 47 |
14 | 49 |
16 | 51 |
18 | 53 |
20 | 55 |
22 | 57 |
24 | 59 |
26 | 61 |
28 | 63 |
30 | 65 |
Final Checks
IMPORTANT : Before leaving job, be sure to do the following:
- Ensure that all wiring is routed away from tubing and sheet metal edges to prevent rub–through or wire pinching.
- Ensure that all wiring and tubing is secure in unit before adding panels and covers. Securely fasten all panels and covers.
- Tighten service valve stem caps to 1/12–turn past finger tight.
- Leave Owner’s Manual with Owner. Explain system operation and
periodic maintenance requirements outlined in the manual. Fill out Dealer Installation Checklist and place in the customer file.
Care and Maintenance
For continuing high performance and to minimize possible equipment failure, periodic maintenance must be performed on this equipment. The frequency of maintenance may vary depending upon geographic areas, such as coastal applications. See the Users Manual for information.
Training
My Learning Center is your central location for professional residential HVAC
training resources that help strengthen careers and businesses. We believe in
providing high quality learning experiences both online and in the classroom.
Access My Learning Center with your HVACpartners credentials at
www.mlctraining.com. Please contact us a
mylearning@carrier.com with questions.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>