ALTA Open Roll Shades Instruction Manual
- June 4, 2024
- ALTA
Table of Contents
ALTA Open Roll Shades
INSTALLATION INSTRUCTIONS
Install the Brackets
Important: Make sure the mounting surface is level. Brackets must be in line and level for shade to operate properly. Shim brackets if necessary.
Open Roll Tubes 1 1/8″ to 2 1/2″
Inside Mount (IB), Install each bracket with two screws either through
the side or up through the top. Make sure all brackets are leveled and
aligned.
Outside Mount (OB), Secure each bracket with two screws. Make sure all
brackets are level. Minimum 1 3/4 mounting surface height requirement.
Double Brackets (Only Tubes 1 1/8” to 1 1/2”)
Inside Mount Only (IB), Install each bracket with two screws through the top. Make sure brackets are leveled and aligned. Minimum 1 3/4” mounting depth requirement. 2 1/8” to 4” flush mount depth requirement (depends on roll diameter).
Install the Shade
Motorization (Open Roll Tubes 1 1/2” to 2 1/2”)
First, place the spring-loaded pin end into the round hole of the bracket. Then, keeping the pin end secure in its bracket, insert the hooks on the motor head straight into the two slots in the bracket. Once the two hooks are through the slots, gently pull down on the motor until the hooks have locked securely to the bracket. The reset button of the motor should be facing down.
AgileLift
Important: Do not to pull the lock pin until the shade is securely assembled
onto the brackets. First, place the spring-loaded pin end into the round hole
of the bracket. Then, keeping the spring-loaded pin end secure in its bracket,
insert the hooks on the control head straight into the two slots in the
bracket. Once the two hooks are through the slots, gently pull down on the
side with two hooks until the hooks have locked securely to the bracket.
Lastly, remove the lock pin prior to operation by pulling it down.
Note: If for any reason needs to make an adjustment on the position of
the installation brackets or need to remove the shade; raise the shade and
insert the lock pin prior to disengaging the shade from the installation
brackets.
Install the End Caps
Adding Optional Top Treatment
Please refer to Roller Shades – Skyline Fabric Cornice and Deluxe Valance installation instructions.
Remove the Shade (Only if Necessary — Open Roll Tubes 1 1/8” to 2 1/2”)
First, raise the shade. Gently lift up the control unit (hooks end) to disengage, until the hooks touch the top part of the bracket slot. Then, slide the roll towards the spring loaded pin end until the hooks are completely out of the bracket slots. Lastly, remove the spring-loaded pin end from the Idler bracket.
Child Safety
WARNING
STRANGULATION HAZARD –
Young chidren can be strangled by cords. Immediately remove this product if a cord longer than 22 cm or a loop exceeding 44 cm around becomes accessible. Rev 7/21 Print 7/21
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>