CLIPSAL 230DRAQTPL Meter Box Instruction Manual
- June 10, 2024
- CLIPSAL
Table of Contents
- CLIPSAL 230DRAQTPL Meter Box
- Product Information
- Product Usage Instructions
- Package Contents
- Parts Identification
- Meter panel
- Meter Isolation Link Fixation
- **Neutral and Earth connection
- Circuit Protection Device Installation
- Doorlock Instruction
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
CLIPSAL 230DRAQTPL Meter Box
Product Information
The Meter Box 230DRAQTPL en is an electrical enclosure designed to house circuit protection devices and metering equipment. It is used in residential and commercial settings to protect electrical equipment from damage and prevent electrical hazards. The product features a meter panel with provision for three-meter isolation links, one meter isolation link supplied with the product. It also includes a neutral and earth terminal bar, provision for L5 or L7 neutral link mounting, and cable protection slide and lead tie-off point to help comply with AS/NZS 3012 for temporary installation.
Product Usage Instructions
-
Danger: Before working on the product, turn off all power supplying it. Use a voltage tester with a suitable rated voltage to check that all active conductors aren’t energized. Carefully inspect the work area to check that no tools or objects could have been left inside the equipment. Failure to follow these instructions can result in death or serious injury.
-
Unbox the product following the orientation provided.
-
Identify the parts using the parts identification section of the manual.
-
To fix the meter isolation link, follow these steps:
- On the meter panel’s front side, pull out the meter isolation link fuse carrier from the base portion.
- Remove the nut and pull out the meter panel.
- Make wiring connections to the meter isolation link.
- After wiring, push back the meter panel to its original position and tighten the nut. Re-assemble the fuse carrier to the base portion.
-
To connect neutral and earth, use a terminal bar and tighten the screws to 1.2 Nm.
-
To install a circuit protection device, follow these steps:
-
Remove the facia plate and use grommets or conduits to seal off open knockouts properly for routing wires.
-
Add a DIN-mounted protection device as required.
Note : DIN is suitable for 21 modules of 18 mm each. -
Reassemble the facia plate and fill the unused space with the pole filler provided in the accessory bag.
-
-
To comply with AS/NZS 3012 for temporary installation, pass the leads through cable protection slide at the bottom opening and tie them off before plugging them into a socket outlet. Ensure the door is closed after installation.
-
To lock the door, knock out the slot from the inside of the door, dismount the pre-assembled locking strap, reverse the locking strap in the same position, and reassemble it with the screws.
Note : Padlock not included. -
Follow local service and installation rules for both temporary and permanent installations.
PLEASE NOTE
- This equipment must be installed and maintained by a qualified electrician in accordance with the appropriate statutory regulations and codes of practice.
- All applicable local, regional, and national regulations must be complied with during the installation, use, maintenance, and replacement of this device.
- This product should not be installed if, when unpacking it, you observe that it is damaged.
- Clipsal cannot be held responsible in the event of non-compliance with the instructions in this document and in the documents to which it refers.
- The service instruction must be observed throughout the life time of this product.
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH
- Turn off all power supplying this product before working on it.
- Use a voltage tester with a suitable rated voltage in order to check that all active conductors aren’t energized.
- Carefully inspect the work area to check that no tools or objects could have been left inside the equipment.
- Failure to follow these instructions will result in death or serious injury
Package Contents
Note : Follow the orientation for unboxing
Rotate package by 180° with care and remove carton box
Parts Identification
Contents of accessory bag
Note : Located behind the meter panel
- A Pole filler
- B Single phase busbar
- C Green label sheet
- D Instruction sheet
- E Cable lug
- F Screw (M4)
- G Cable tie
- H Meter isolation link
Meter panel
Note : Provision for three meter isolation link mounting, one meter isolation link supplied with product
Meter Isolation Link Fixation
- Pull out the meter isolation link fuse carrier from the base portion
- Remove the nut and pull out the meter panel
- Wiring connection to meter isolation link.
- After wiring, push back the meter panel to its original position and tighten the nut.
- Re-assemble the fuse carrier to the base portion
Note:
Mandatory step to be followed
**Neutral and Earth connection
**
Circuit Protection Device Installation
Note:
Mandatory step to be followed
Cable Protection Slide and Lead Tie-off Point to Help Comply to AS/NZS 3012 for Temporary Installation
-
Pass the leads through cable protection slide at the bottom opening and tie off before plugging into socket outlet
Note : Fill unused space with pole filler -
Ensure door is closed after installation
Note: Mandatory step to be followed
Note : To suit temporary and permanent installation, follow local service and installation rules
Doorlock Instruction
- Knockout the slot from the inside of door
- Dismount the pre-assembled locking strap
- Reverse the locking strap in same position and reassemble it with the screws
Clipsal by Schneider Electric (Australia) Pty Limited 33-37 Port Wakefield
Road Gepps Cross South Australia 5094
Customer Care Centre
Tel : 1300 369 233
Email : customercare.au@se.com
Fax : 1300 369 288
www.clipsal.com
GDE59545-01
© 2021 Clipsal Australia Pty Ltd – All rights reserved. The identified
trademarks and copyrights are the property of Clipsal Australia Pty Ltd unless
otherwise noted.