vetus BOWA0361 BOW PRO ‘A’ Series Thrusters Instruction Manual

June 9, 2024
vetus

vetus-logo

vetus BOWA0361 BOW PRO ‘A’ Series Thrusters

vetus-BOWA0361-BOW-PRO 'A' Series-Thrusters-product-
image

Safety

Warning indications
The following warning indications are used in this manual in the con-text of safety:

Danger
Indicates that great potential danger exists that can lead to serious injury or death.

Warning
Indicates that a potential danger that can lead to injury exists.

Caution
Indicates that the usage procedures, actions etc. concerned can result in serious damage to property. Some CAUTION indications also advise that a potential danger exists that can lead to serious injury or death.

Note
Emphasizes important procedures, circumstances etc.

Symbols

✅Indicates that the relevant procedure must be carried out.

❌Indicates that a particular action is forbidden.

Share these safety instructions with all users.
General rules and laws concerning safety and accident prevention must always be observed.

Introduction

This manual give guidelines for installing a VETUS bow and/or stern thruster from the BOW PRO series, model ‘BOWA0361′, ‘BOWA0364’ and ‘BOWA0421’.

The bow or stern thruster system consists of the following basic components:

  • Side thruster
  • Tunnel
  • Energy storage
  • Energy supply
  • Operation

Note
If necessary, consult the installation manuals for all components before putting the complete system into operation.
For maintenance and warranty, please refer to the ‘Maintenance and Warranty Manual’.

The quality of installation will determine how reliably the bow and/or stern thruster performs. Almost all faults can be traced back to errors or inaccuracies during installation. It is therefore imperative that the steps given in the installation instructions are followed in full during the installation process and checked afterward.

Alterations made to the bow thruster by the user will void any li-ability on the part of the manufacturer for any damages that may result.

The actual thrust generated by the bow and/or stern thruster will vary from vessel to vessel depending on the windage, the hull dis-placement, and the shape of the underwater section.

The nominal thrust quoted can only be achieved under normal conditions:

  • During use ensure the correct battery voltage is available.

  • The installation is carried out in compliance with the recommendations given in this installation instruction, in particular with regard to:

    • Sufficiently large diameter of the battery cables so that voltage drop is reduced to a minimum.

    • The manner in which the tunnel has been connected to the hull.

    • Use of bars in the tunnel openings.
      These bars should only be used where this is strictly necessary (if sailing regularly in severely polluted water.)

    • The bars must have been fitted correctly.

Note: The areas in which the electric motor(s) of the thruster(s) and batteries are positioned must be dry and well ventilated.

Note: Check for possible leaks immediately the boat is relaunched.

Note: The maximum continuous length of usage and the thrust as specified in the technical details are based on the recommended battery capacities and battery cables.

Installation recommendations

Positioning of the thruster tunnel

Several installation examples.

To achieve the optimum performance, position the thruster tunnel as far forward as possible.

If, in addition to controlling the movement of the bow, the stern of the vessel is required to move sideways, then a second thruster may be installed at the stern.

For a planning boat the tunnel should, if possible, be so situated so that when the vessel is planing it is above the water level thus causing no resistance.

Installation of two bow thrusters in tandem (for larger boats). In this case, depending on weather conditions, one or both bow thrusters may be used.

Tip: We do not advise fitting 2 bow thrusters into one tunnel; this does not result in doubling the thrust!

When choosing the location for the thrust tunnel, take the following into account for optimum performance:

  • The distance A shown in the drawing must be at least 0.5 x D (where D is the tunnel diameter).
  • The length of the tunnel (distance B) should be between 2 x D and 4 x D.

Positioning of the bow thruster in the thrust-tunnel
When determining the exact position of the bow thruster in the thrust tunnel, the tailpiece MUST  NOT protrude the tunnel end.

The propeller should preferably be situated on the centerline of the vessel, but it must always be accessible from the outside.

  • The electric motor can be installed in various positions.
  • If the motor is set up horizontally or at an angle, support is absolutely essential.
  • The electric motor must be positioned in such a way that it is al-ways well clear from the maximum bilge water level.

Connection of thrust tunnel to ship’s hull
Direct connection of the tunnel to the hull, without a fairing, pro-duces reasonable results.

  • A The connection to the hull can be abrupt.
  • B It is better to make the connection rounded with radius ‘R’ of about 0.1 x D.
  • C It is even better to use sloping sides ‘C’ with dimensions 0.1 to 0.15 x D.

Connection of the thrust tunnel to the ship’s hull with a fairing results in lower hull-resistance during normal sailing.

  • A The connection with a fairing can be abrupt.
  • B It is better to make the connection with a fairing rounded with radius ‘R’ of about 0.1 x D.
  • C The best connection is with a fairing using sloping side ‘C’ with dimensions 0.1 to 0.15 x D.

Tip: The manner, in which the thrust tunnel is connected to the hull, has a great influence on the actual performance of the bow thruster and to the drag the hull experiences when underway.

  • Length ‘L’ of the fairing should be between 1 x D and 3 x D.
  • This fairing should be embodied in the ship’s hull in such a way that the centerline of the fairing will correspond with the anticipated shape of the bow-wave.

If the connection of the thrust tunnel and the boat’s hull is to be made with a sloped side, it should be executed in accordance with the drawing.

Make the sloped side (C) with a length of 0.1 to 0.15 x D and make sure that the angle be-tween the tunnel and the sloped side will be identical to the angle between the sloped side and the ship’s hull.

Grid bars in the tunnel openings
Although the thrust force will be adversely affected, grid bars may be placed into the tunnel openings, for protection of the thruster.

In order to limit the negative effect of this on the thrust and on hull resistance during normal operation as much as possible, the following must be taken into account:

  • Do not fit more bars per opening than is indicated in the drawing.

  • The bars must have a rectangular cross-section.

  • Do not fit round bars.

  • The bars must overlap a certain amount.

  • The bars must be installed so they are perpendicular to the expected waveform.

Installation of the thrust tunnel

  • Drill 2 holes in the hull, where the centerline of the thrust tunnel will be, in accordance with the diameter of the marking tool.
  • Pass the marking tool (home-made) through both pre-drilled holes and mark the outside diameter of the thrust-tunnel on the hull.
    D [mm] (inches)

    Steel| GRP| Aluminum
    134 (5 9/32”)| 136 (5 23/64”)| –

  • Dependent on the vessel’s construction material, cut out the holes by means of a jigsaw or an oxy-acetylene cutter.
    Install the thrust-tunnel.

Polyester thrust tunnel:

  • Resin: The resin used for the polyester thrust tunnel is Isophtalic polyester resin (Norpol Pl 2857).
  • Pre-treatment: The outside of the tunnel must be roughened. Remove all of the top surface down to the glass-fiber. Use a grinding disc for this.
  • Important: After the tunnel been sawn to length, treat the end of the tube with resin. This will prevent water seeping in.
  • Laminating: Apply a coat of resin as the first coat. Lay on a glass-fiber mat and impregnate with resin. Repeat this procedure until you have built up a sufficient number of layers.

A polyester thrust tunnel should be finished as follows:

  • Roughen the hardened resin/glass-fiber. Apply a top coat of resin.
  • Treat the side of the tunnel which comes into contact with water with ‘epoxy paint’ or 2-component polyurethane paint.
  • Then apply anti-fouling treatment if required.

Drilling the holes in the thrust-tunnel

  • Mark the installation position of the bow thruster by means of the intermediate flange.
  • Use the drill pattern supplied, to deter-mine the correct position of the holes to be drilled.

Important: The pattern of the holes must be positioned precisely on the centerline of the tunnel.

Consult the template for the dimensions of the holes to be drilled. Drill the holes through the thrust tunnel and take care that the holes are free of burrs.

Protection of the bow thruster against corrosion
To prevent corrosion problems, do not use copper based anti-fouling. Cathodic protection is a ‘must’ for the protection of all metal parts under water and the bow thruster is supplied with a zinc anode for this purpose.

Corrosion of a steel or aluminium thrust tunnel can be reduced by en-suring that the tail piece is completely insulated from the thrust-tunnel.

NOTE: The gaskets supplied are al-ready electrically insulated. However the bolts and the shaft need to be fit-ted with insulation material, for exam- ple nylon bushes.

Installation

Introduction

Note: The areas in which the electric motor(s) of the bow thruster(s) and the batteries are positioned must be dry and well ventilated.

For overall dimensions see drawing, page 106
The bow thruster is supplied in parts as shown.

Installation tailpiece and intermediate flange

  • Ensure that the plastic shim plate (1) has been positioned on the tail piece.
  • Place one packing (2) between the tail piece and the tunnel.
  • Apply a sealant (e.g. polyurethane*) or silicone) between the tail piece and packing, and between the packing and the tunnel wall.
  • Place the tail piece in the hole in the tunnel.
    Any extra packings used should be ones capable of justifying the tail piece.
    *) e.g. Sikaflex®-292.

  • Grease the hole of the intermediate flange and position this flange.
  • Grease the threads of the bolts with ‘outboard gear grease’ *) before inserting and tightening them.

NOTE: Check for any leaks immediately the vessel returns to the water.

*) A suitable grease is VETUS ‘Shipping Grease’, Art. code: VSG.

Final assembly

  • Grease the propeller shaft with ‘outboard gear grease’ *) and in-stall the propeller. The propeller should run a minimum of 1.5 mm (1/16”) free of the thrust tube wall, around the complete circumference.

  • Slide the flexible coupling onto the output spindle of the electric motor as far as necessary to allow the end of the output spindle
    (A) and the underside of the flange (B) to become aligned.

  • Tighten the lock-screw (C) to the specified torque.

  • Grease the input shaft with an installation compound, such as ‘Molykote® G-n plus’.

  • Grease the threads of the fastenings bolts with ‘outboard gear grease’ and install the electric motor to the intermediate flange.

  • For a first check, turn the propeller by hand – it should turn easily, while connected to the output spindle of the electric motor. *) A suitable grease is VETUS ‘Shipping Grease’, Art. code: VSG.

Electrical installation

Choice of battery

The total battery capacity must be sufficient for the size of the bow thruster; see the table. See page 116 for the applicable battery capacity.

The minimum battery capacity is specified in the table; with a lar-ger battery capacity, the bow thruster will perform even better!

We recommend VETUS maintenance free marine batteries; these can be supplied in the following sizes: 55 Ah, 70 Ah, 90 Ah, 108 Ah, 120 Ah, 143 Ah, 165 Ah, 200 Ah and 225 Ah.
We also recommend that each bow thruster is powered by its own separate battery or batteries. This allows the battery bank to be placed as close as possible to the bow thruster; the main power cables can then be short thus preventing voltage losses caused by long cables.

Always use batteries whose type and capacity are compatible for their use.

Note:
Be sure to only use ‘sealed’ batteries if the batteries are located in the same compartment as the bow thruster.
VETUS ‘SMF’ and ‘AGM’ maintenance-free batteries are ideal for this application.
Batteries that are not ‘sealed’ may produce small amounts of ex-plosive gas during the charging cycle.

Main power cables (battery cables)
The minimum diameter and battery capacity must be sufficient for the bow thruster’s current draw in use. Consult the table on page 116 for the correct values.

Note: The maximum operating time and the thrust, as specified by the technical details in your bow thruster installation and operating manual, are based on the recommended battery capacities and battery connection cables.

Main switch see page 114
The main switch must be fitted to the ‘positive cable’.
The VETUS battery switch type BATSW250 is a suitable switch, which is also available in a 2-pole version, VETUS part number BATSW250T.

Fuses
Main power fuse 1, see page 114
A fuse must be included in the ‘positive cable’ for the main switch, as close to the battery as possible. This fuse protects the on-board power cabling from short circuits.

For all fuses we can supply a fuse holder, VETUS part no.: ZEHC100.
See page 116 for the size of the fuse to be used.

Connecting the main power cables and configuring the bow and/or stern thruster
Make sure that no other electrical parts come loose when connecting the electric cables.

Check all electrical connections after 14 days. Electrical parts (such as bolts and nuts) may come loose as a result of fluctuations in temperature.

  • Take off the cover.
  • Feed the battery cables through the input glands in the cover.
  • Apply cable terminals to the battery cables and connect the ca-bles to the motor controller.
    Make sure that the cable terminal on the negative cable cannot cause a short circuit to the lowest of the three motor connecti-ons on the controller!

Note: The tightening torque of bolts in the motor regulator is a maximum of 10 Nm (7 ft-lbf).

The drawing shows how the cables must be laid in order for the cover to be replaced again.

Note: Make sure that the voltage stated on the motor type plate is identical to the boat’s power supply voltage.e

For connection diagrams, see also page 114.

Note: To allow the bow thruster or stern thruster to be distinguished on the CAN bus, these must be configured appropriately.

Bow thruster
The configuration as supplied is for application as a bow thruster.

Stern thruster
Configure a stern thruster by cutting through the red wire as indicated in the drawing.

  • Reinstall the cover and tighten the glands.

Main power fuse 2
In the connection unit, there is a main power fuse on the controller.
This fuse protects the controller and motor against short circuit/overloading and it must remain present under all circumstances.

Note: When replacing the fuse, the replacement must be of the same rating.

Connecting CAN bus (control current) cables
See diagrams from page 107 if multiple panels have to be connected.

Note: The CAN bus power supply must always be connected to 12 Volt (≥10 V, ≤16 V). Use the E-Drive MPE1KB key switch as power supply.

Caution: As required by international standards, all neutral (negative) conductors of the DC system must be connected to one central point. This prevents not only dangerous situations and corrosion problems, but also error messages in the CAN bus system.

Technical data

Type :BOWA0361 BOWA0364 BOWA0421

Electric motor

Type : EC Motor (8VAC-1.2kW) EC Motor (8VAC-1.2kW) EC Motor (8VAC-2.7kW)
For DC systems : 12 V = 48 V = 12 V =
Current (In) ****

:

| 240 A @ 12,0 V| 61 A @ 48 V| 218 A @ 12,0 V
273 A @ 10,5 V| 71 A @ 42 V| 250 A @ 10,5 V
Power consumption| :| 2,9 kW| 2,9 kW| 2,6 kW

  • Rating : S2 – 10 min. [1]

  • Protection : IP44

  • Insulation class : F

  • Motor controller
    MCV : MCV30024 + MCV0361S MCV25048C + MCV0364S MCV30024 + MCV0421S

  • Transmission

    • Gears : Bevel gear helical teeth
    • Gear ratio : 1 : 1
    • Lubrication : oilbath, outboard gear oil SAE80W or EP 90 : ca. 0.04 litre (1.4 fl.oz.)
  • Propeller

    • No. of blades : 6
    • Profile : asymmetrical
    • Material : polyacetaal (Delrin®)
    • Rated thrust : 360 N (36 kgf, 79 lbf ) 360 N (36 kgf, 79 lbf ) 420 N (42 kgf, 93 lbf )
  • Control circuit

    • Fuse : Blade type fuse ‘ATO’ 5 A
    • Control circuit wires : 2 x 2x 0,5 mm2 (2 x 2 x AWG20) Twisted pair
    • Extension cable : 5, 10, 15, 20 or 25 m (16’, 33’, 49’, 66, or 82’)

Thrust-tunnel

  • Steel model
    • Dimensions : O.D. outside diameter 133 mm, wall thickness 4 mm
    • Treatment : blasted, coated with: SikaCor Steel Protect. Suitable for all kinds of protection systems.
  • Plastic model
    • Dimensions : I.D. inside diameter 125 mm, wall thickness 5 mm
    • Material : glass fibre reinforced polyester
  • Aluminium model
    • Dimensions : I.D. inside diameter 125 mm, wall thickness 4 mm material : aluminium, 6060 or 6062 (AlMg1SiCu)
  • Weight :
    Excl. thrust-tunnel : 26 kg (57 lbs) 26 kg (57 lbs) 26 kg (57 lbs)

[1] S2 ‘t’ min.  Activation time ‘t’ min. continuously or a max. of ‘t’ min. per hour at maximum power.

Principal dimensions

Wiring diagrams

Note: The CAN bus is a chain to which the bow thruster and the panels are connected.
At one end of the chain, the power supply (3) must be connected and the terminator (7) must be connected at the other end!

  • One (1) thruster (bow or stern),
  • One (1) helm station
  1. Connection box thruster (or stern thruster)
  2. Hub
  3. CAN-bus supply
  4. Control voltage fuse
  5. Control panel
  6. Connection cable
  7. Terminator

Thrusters (bow AND stern), One (1) helm station

  1. Connection box bow thruster
  2. Hub
  3. CAN-bus supply
  4. Control voltage fuse
  5. Control panel bow thruster
  6. Connection cable
  7. Terminator
  8. Connection box stern thruster
  9. Control panel stern thruster

Thrusters (bow AND stern).
Two (2) helm stations. The diagram can be extended to up to four (4) helm stations.

  1. Connection box bow thruster
  2. Hub
  3. CAN-bus supply
  4. Control voltage fuse
  5. Control panel bow thruster
  6. Connection cable
  7. Terminator
  8. Connection boxstern thruster
  9. Control panel stern thruster

vetus-BOWA0361-BOW-PRO 'A' Series-Thrusters-45

Connection of battery for a 12 volt bow or stern thruster

  1. Connection box thruster (or stern thruster)
  2. Battery
  3. Main fuse
  4. Main switch
  5. Alternator
  6. Starter motor
  7. Battery isolator

vetus-BOWA0361-BOW-PRO 'A' Series-Thrusters-46

Connection of batteries for a 48 volt bow or stern thruster

Battery capacity, battery cables

Bow thruster| Battery capacity required| Total length of plus- and minus cable| Cable cross-section| Main power fuse, see 5.4
---|---|---|---|---
Minimum| ‘slow blow’| VETUS art. code

BOWA0361
36 kgf – 12 V| 1 x 170 Ah – 12 V| 0 – 6,3 m| 0 – 20.7 ft| 50 mm2| AWG 0| 355 A| ZE355
---|---|---|---|---|---|---|---
6,3 – 8,8 m| 20.7 – 28.9 ft| 70 mm2| AWG 00
8,8 – 11,9 m| 28.9 – 39.0 ft| 95 mm2| AWG 000
11,9 – 15 m| 39.0 – 49.2 ft| 120 mm2| AWG 0000
15 – 17,6 m| 49.2 – 57.7 ft| 2 x 70 mm2| 2 x AWG 00
17,6 – 18,8 m| 57.7 – 61.7 ft| 150 mm2| AWG 300 MCM
18,8 – 23,8 m| 61.7 – 78.1 ft| 2 x 95 mm2| 2 x AWG 000
23,8 – 30 m| 78.1 – 98.4 ft| 2 x 120 mm2| 2 x AWG 0000
30 – 37,6 m| 98.4 – 123.4 ft| 2 x 150 mm2| 2 x AWG 300 MCM

BOWA0364 36 kgf – 48 V| 4 x 60 Ah – 12 V| 0 – 48,2 m| 0 – 158.1 ft| 25 mm2| AWG 4| 125 A| ZE125
---|---|---|---|---|---|---|---
48,2 – 67,6 m| 158.1 – 221.8 ft| 35 mm2| AWG 2
67,6 – 96,5 m| 221.8 – 316.6 ft| 50 mm2| AWG 0
96,5 – 135,2 m| 316.6 – 443.6 ft| 70 mm2| AWG 00
135,2 – 183,5 m| 443.6 – 602 ft| 95 mm2| AWG 000
183,5 – 231,8 m| 602 – 760.5 ft| 120 mm2| AWG 0000

BOWA0421 42 kgf – 12 V| 1 x 145 Ah – 12 V| 0 – 4,8 m| 0 – 15.7 ft| 35 mm2| AWG 2| 355 A| ZE355
---|---|---|---|---|---|---|---
4,8 – 6,9 m| 15.7 – 22.6 ft| 50 mm2| AWG 0
6,9 – 9,6 m| 22.6 – 31.5 ft| 70 mm2| AWG 00
9,6 – 13 m| 31.5 – 42.7 ft| 95 mm2| AWG 000
13 – 16,5 m| 42.7 – 54.1 ft| 120 mm2| AWG 0000
16,5 – 19,2 m| 54.1 – 63 ft| 2 x 70 mm2| 2 x AWG 00
19,2 – 20,5 m| 63 – 67.3 ft| 150 mm2| AWG 300 MCM
20,5 – 26 m| 67.3 – 85.3 ft| 2 x 95 mm2| 2 x AWG 000
26 – 33 m| 85.3 – 108.3 ft| 2 x 120 mm2| 2 x AWG 0000
33 – 41,1 m| 108.3 – 134.8 ft| 2 x 150 mm2| 2 x AWG 300 MCM

FOKKERSTRAAT 571 – 3125 BD SCHIEDAM – HOLLAND
TEL.: +31(0)88 4884700 – sales@vetus.nlwww.vetus.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals