George Kovacs P4305-084 GK Lightrail 5-Light Monorail Kit Instruction Manual
- June 9, 2024
- GEORGE KOVACS
Table of Contents
- P4305-084 GK Lightrail 5-Light Monorail Kit
- A. Package Contents
- Installing the Transformer
- C. Preparing the Rail Sections for Installation
- D. Installing the Rails to the Ceiling
- E. Securing the Rail to the Ceiling
- F. Installation the fixtures
- G. Restoring the Electrical Power
- H. Important safety Instructions
- IMPORTANT SAFETY INSTRUCTIONS
- Documents / Resources
P4305-084 GK Lightrail 5-Light Monorail Kit
Instruction Manual
P4305-084 GK Lightrail 5-Light Monorail Kit
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER. AVERTISSEMENT! COUPER
LE COURANT AU NIVEAU DES FUSIBLES OU DU DISJONCTEUR.
RAIL SYSTEM
Installing your Rail System
READ THESE INSTALLATION INSTRUCTIONS BEFORE YOU BEGIN INSTALLING THIS NEW RAIL
SYSTEM. THIS SYSTEM MAY BE DIMMED WITH THE APPROPRIATE C-L (CPL & LED) TYPE
WALL DIMMER SWITCH.
- Use a 60W Magnetic Transformer with this system Models: P4305-084/P4305-467 (supplied).
- Make sure all connections are tight and secure.
- Do not install any components of this system to any metal surface.
- For use with models P4305 rail systems only.
Tools needed for Installation: Phillips Screwdriver, Flat Head
Screwdriver, Hammer, Wire Cutters, Allen wrench.
Rail System: Use only with electrical fittings identified for use with
the P4305 rail systems.
TRACK SYSTEM(to be only used with the electrical fitting identified for use
with the P4305 track system)
This track system is to be supplied by a single branch circuit of 120
volts,single phase. Not intended for use with a powersupply cord or
convenience receptacle adapter.
This track is only to be used with other electrical fittings identified for
use with the track system.
CAUTION: Before you begin inslallini your new rail system; disconnect the
power by removing the fuses or turning off the circuit breakers.
A. Package Contents
Unpack your new rail system; you should have the following;
A- Rail track,
B- Transformer,
C- Ceiling standoffs.
D- Fixtures E& PE bag of mounting hardware including spare parts.
Model: P4305
Installing the Transformer
NOTE : The transformer can be installed at any location within 22′ length
of the track. For example you can Install the transformer at one end or In the
middle of the Choose a location that is most suitable for electrical
connections and appearance for the installation of the transformer.
Step 1. Locate transformer (a) and transformer mounting hardware package
in box(A) which contains 2pcs screws and 3pcs wire nuts. (Fig.1)
Step 2. Remove and set aside the 3 screws from the transformer to release
the back plate.(Fig.2)
Step 3. Line up the back plate with the junction box holes and secure with
the two junction box screws provided. (Fig.3)
Step 4. Connect the bare (ground) wire for the transformer to the bare or
green ground wire from the junction box and use a wire nut to secure the
connection (Fig.4)
Step 5-1. Connect the white (neutral) wire from the transformer to the
white wire from the junction box . use a wire nut to secure the
connection.(Fig,5)
Step 5-2. Connect the black (hot) wire from the transformer to the black
wire from the junction box use a wire nut to secure the connection. (Fig.5)
Secure wire connections with the 3 plastic wire nuts provided (Flg.5A)
Step 6. Tuck the wire nut
connections into the electrical junction box. Slide the transformer housing up
until the holes line up to the back plate,make sure all wires are tucked
Insecure It In place with the 3 screws previously removed.
Note: 1. MAKE SURE THATTHE STAND OFF IS IN ALIGNMENT WITH THE RAIL.
2. Transformer is equipped with a
circuit breaker. It Is located on the side of the upper setcion of the
transformer. This will “trip” (turn off power) If too many fixtures are put on
the track or there is a short circuit. To reset circuit breaker push button
in. If it continues to trip make sure that the total wattage of all fixture
does not exceed 60 watts. Also make sure there Is no conducting material
shorting out the track.
C. Preparing the Rail Sections for Installation
Step 1. Locate the three sections of rail and joiners packet (A), which
contains the one alien wrench and several extra set screws.
Step 2. If you would like to customise the length of the rails. use a
hacksaw to cut to the desired length. Use a file or equivalent to remove any
burs from the rails. Remove and replacethe end caps to the ends of the rails.
(A).End cap
Step 3. To bendor curve the rail, follow step 4, If the rail will be
mounted as a straight run, skip to step 5.
Step 4. Use a round kitchen tabletop or similar household item as a
template to bend the rail. Carefully hold the rail with one hand starting from
the center and working towards the ends. Table Top (A), Waste Paper Basket
(B), Counter Top (C)Plywood Template (D)
Step 5. Secure the pieces of rail together by inserting the aids of the
rail firmly into the rail joiners. Tighten the alien set screws with the alien
wrench provided.
CAUTION: DO NOT OVER TIGHTEN ALLEN SET SCREWS.
D. Installing the Rails to the Ceiling
Step 1. Locate the four standoffs and mounting hardware packet (B) which
contains 4 screws, one allen wrench, 4pcs drywall anchors and 4prs threaded
washers
Step 2. Lay the assembled rail on the floor directly under the
transformer.
Step 3. The transformer and the standoffs will he used to support the rail
from the ceiling providing a total of five supports. Use a pencil and tape
measure to mark two of the support locations on the rail fin from each end of
the rail.
Step 4. Mark the remaining support locations on the rail no more than 38″
apart. It is acceptable for a support location to fall directly over a rail
joiner.
Step 5. Lift the rail to the ceiling. Lining the rail up with the
Transformer, Use a pencil to transfer the standoff locations to the ceiling.
Step 6. Line up the drywall anchors with the marks on the ceiling and use
a hammer to tap the anchor approximatelly 1/2″ into the ceiling. Stop just
before the threaded portion of threaded portion of the anchor enters the
ceiling.
Step 7. Finish the installation using a screw driver to screw the anchor
until is flush to the ceiling.
Step 8. Secure a threaded washer to the flushed anchor by driving a screw
into the anchor. Threaded Washer (A).
Step 9. Secure the standoff assembly to the threaded washer.Standoff
Assembly(A)
Step 10. Repeat step 6 to 9 for the remaining standoffs.
E. Securing the Rail to the Ceiling
Step 1. Remove the transformer power feed cap from the base of the power
feed. (A) Power Feed Cap
Step 2. Remove the standoff caps. (B) Standoff Cap
Step 3. Slide the rail into the standoffs and the transformer power feed.
Step 4. While supporting
the rail, screw the transformer power feed cap back onto the transformer. The
connection must be tight.
Step 5. Carefully screw the siandoff caps back onto each of the
standoffs.
F. Installation the fixtures
Step 1. Locate the six fixtures with adjustable arm.
Step 2. Remove the fixture cap from each of the fixtures. (A) Fixture Cap
Step 3. Slide the fixture onto the rail and secure with a fixture cap.The
connection must be tight and secure. Repeat this step for the remaining
fixtures.
G. Restoring the Electrical Power
Install LED fixture, led 3W MAX (Included)
Step 1. Restore the electrical power and proceed to test your new rail
system.
Step 2. Turn on the light
system and let it run for 5 minutes. Turn the system off, carefully check that
all connection points are not hot to the touch (warm Is acceptable), if a
connection is hot, check the connection and make sure the wire nut is tightly
secured. Power Ftvd Connection (A) Fixture Connections (13)
NOTICE : Fixture should be
installed by a qualified electrician to ensure proper wiring and installation.
Dimmer with C-L (CFL & LED) type Brand : Lutron
Ordering Inlormation | oxed | lamshell |
---|---|---|
Model number | Product name | Control Type |
vc1-153P- | Diva C L | Sing1″°18/34.18Y dimmer |
Incandescent/ Halogen 120v
VCI-153PH-
VSCCL-153P| Diva GL Satin Colors
TCL-153P-| Skylark Controur C-L
TCL-153PH-
TCL-153P-| Ariadn1C-L
YCL-153PH-
TCL-100H-| Credenza C-L| dimmer P6 lamp| 100W CFL/ LED or 250W Incandescent/
Halogen 120v
H. Important safety Instructions
CAUTION : Do not touch hot lens, housing or enclosure when lit.
When installing or using the LED track accent light, basic safety precautions
should always be followed including the following :
- The LED track accent light is suitable for indoor use only.
- Always switch off the mains supply before servicing, fitting or changing the spot lights.
- Use only with apprepriate 12V AC/DC constant voltage spotlights.
- The maximum 12 fixtures only per kit.
- Each spot must be separate from another spot by at least 3″ distance
“CAUTION —”To reduce the risk of fire, electric shock, or injury to
persons:
a) Use only insulated staples or plastic ties to secure cords;
b) Route and secure cords so that they will not be pinched or damaged when the
cabinet is pushed to the wall;
c) Position the portable cabinet light with respect to the cabinet so the lamp
replacement markings are able to be read during relamping; and
d) Not intended for recessed installation in ceilings, or soffits.”
IMPORTANT SAFETY INSTRUCTIONS
- This portable lamp has a polarized plug (one blade is wider than the other) as a safety feature to reduce the risk of electric shock. This plug will fit in a polarized outlet only one way. If the plug does not fit fully in the outlet, reverse the plug. If it still does not fit, contact a qualified electrician. Never use with an extension cord unless plug can be fully inserted. Do not alter the plug.
SAVE THESE INSTRUCTIONS
Documents / Resources
|
George Kovacs P4305-084 GK Lightrail 5-Light Monorail
Kit
[pdf] Instruction Manual
P4305-084 GK Lightrail 5-Light Monorail Kit, P4305-084, GK Lightrail 5-Light
Monorail Kit, 5-Light Monorail Kit, Monorail Kit
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>