GOODWE GM3000C Smart Meter Installation Guide
- June 9, 2024
- GOODWE
Table of Contents
GOODWE GM3000C Smart Meter
Safety Precautions
General Disclaimer
- The information in this quick installation guide is subject to change due to product updates or other reasons. All descriptions here are for guidance only.
- Before installations, read through the quick installation guide.
- All operations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
- Check the deliverables for correct model, complete contents, and intact appearance. Contact the manufacturer if any damage is found or any component is missing.
- Strictly follow the installation, operation, and configuration instructions in this guide . The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit https://en.goodwe.com/warranty.
Safety Disclaimer
WARINING
- Make sure that the device is powered off before any operations.
- Ensure the cables are connected tightly, securely, and correctly. Inappropriate wiring may cause poor contact or damage the device.
- Additional circuit breakers are recommended on the voltage input side to avoid personal injury or device damage.
- Specification of the protective fuse should be 0.5A.
- In areas at risk of lightning, if the device cable exceeds 10m and wired without grounded metal conduits, you are recommended to use an external lightning protection device.
Check before Power-on
No. | Check Item |
---|---|
1 | The product is firmly installed at a clean place that is well-ventilated |
and easy- to-operate.
2| The input power cables, CT Cables, and communication cables are connected
correctly and securely.
3| Cable ties are intact, routed properly and evenly.
Storage
If the equipment is not to be installed or used immediately, please ensure that the storage environment meets the following requirements:
- Do not unpack the outer package or throw the desiccant away.
- Store the equipment in a clean place. Make sure the temperature and humidity are appropriate and no condensation.
- If the smart meter has been long term stored, it should be checked by professionals before being put into use.
EU Declaration of Conformity
The module sold in the European market meets the following directives and requirements:
- Electromagnetic compatibility Directive 2014/30/EU (EMC)
- Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
- Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
- Waste Electrical and Electronic Equipment 2012/19/EU
- Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
You can download the EU Declaration of Conformity on https://en.goodwe.com.
Technical Parameters
Model | GM3000C |
---|---|
Input | Grid |
Voltage
| Nominal Voltage-Line to N (Vac)| 230
Nominal Voltage-Line to Line (Vac)| 400
Voltage Range| 0.88Un-1.1Un
Nominal AC Grid Frequency (Hz)| 50/60
Current| Current Transformer Ratio| nA:5A
Number of Current Transformers| /
Communication| RS485
Communication Distance (m)| 1000
User interface| 3 LED, Reset button
Accuracy| Voltage/Current| Class 1
Active Energy| Class 1
Reactive Energy| Class 2
Power Consumption(W)| < 3
Machanical| Dimensions (W×H×D mm)| 728566.5
Housing| 4 modules
Weight (g)| 200
Mounting| Din rail
Environment| Ingress Protection Rating| IP20
Operating Temperature Range (℃)| -25~60
Storage Temperature Range(℃)| -30~70
Relative Humidity (non-condensing)| 0~95%
Max. Operating Altitude (m)| 2000
Introduction
Product Introduction
NO . | Component | Description |
---|---|---|
1 | Normal status: ON |
2
| | Consuming : ON
Generating : Blinking
3
| | Blink once detecting data transferring
Blink 5 times as Reset succeeds
4|
Reset
| Press less than 3 s: Meter Reset
Press 5s more or less: Meter Settings Initialization
Press more than 10 s: Meter Initialize settings and Clear Energy Data
5|
USB port
| For after-sales maintenance.
Installation
Packing List
-
Smart Meter x 1
-
Screwdriver x 1
-
Wiring Terminals x 18
-
Documents x 1
Installing the Meter and Cable Connection
NOTICE
- The meter is installed on a rail, and should not be installed outdoors.
- When operating the meter, use insulation tools and wear personal protective equipment to ensure personal safety.
Connect CT cables
NOTICE
-
Requirements for the external CT specifications:
1. Choose nA/5A for the current transformation ratio of the external CT. (n: CT primary input current value between 200 – 5000, which is chosen by the user according to the actual conditions.
5A: CT secondary output current.)
2. Sampling error for the CT current ≤ 1% (0.5, 0.5s, 0.2, 0.2s is recommended).
3. CT bore size must be greater than the outer diameter of AC power line to make sure the AC power line can be inserted through CT.
4. It is recommended to choose the CT with 16AWG cable.
5. See the instructions provided by the respective manufacturer for specific CT wirings to ensure that the direction of the connections is correct and that they are functioning properly. -
An incorrect inlet or direction from the external CT to the meter cable can cause damage to the device or incorrect acquisition of data.
-
Do not tamper with the cables that are pre-installed with the meter.
-
The direction of the external CT is from P1 end to P2 end, and the corresponding AC power line direction is from inverter side to grid side.
-
It is recommended to add an overcurrent protection device (rated current 0.5A) to the voltage input terminal (L1/L2/L3) of the meter.
Wiring System
System comprised of a single three-phase unit
System comprised of multiple three-phase units
Commissioning
Power ON
Step 1 Connect the meter cables.
Step 2 Power on the inverter and make sure that the inverter is working
normally. Then the meter is powered on.
Commissioning the Meter
Set the CT parameters using the SolarGo APP (system comprised of a single threephase unit,with the Export function enabled)
When the GM3000C is used with the Inverter such as BTC series or ETC series etc., please refer to the corresponding user manual for CT-related parameter settings.
NOTICE
Before setting the parameters, make sure that:
- The DC side of the inverter is powered on, but no output on the AC side.
- The SolarGo APP has been downloaded from Google Play or App Store.
- Communication is functioning properly between SolarGo APP and inverter.
- Please use the initial password when logging in for the first time, and change it as soon as possible to one that is memorable for you. To keep your account secure, it is recommended to change your password regularly.
Set the CT parameters using ProMate (system comprised of multiple
inverters)
NOTICE
Before setting the parameters, make sure that:
- Both EzloggerPro and GM3000C is powered on.
- GM3000C is correctly connected to COM4 of EzloggerPro via RS485.
- The Ezlogger Pro Promate software has been downloaded from GOODWE’s official website and installed on the computer.
- ProMate is connected to EzLogger Pro successfully. For detailed procedures, refer to the EzLogger Pro Series User Manual.
Descriptions of the Export Function.
- Total Capacity: Set according to the total capacity of the PV station.
- Power Limit: Set according to the target power that needs to be fed into the grid.
- Ratio of CT: Set according to the CT transformation ratio.
GoodWe Technologies Co., Ltd.
No. 90 Zijin Rd., New District, Suzhou, 215011, China
www.goodwe.com
service@goodwe.com
References
- GoodWe: Smart Energy Innovator
- GoodWe Warranty
- GoodWe: Smart Energy Innovator
- GoodWe: Smart Energy Innovator
- GoodWe Warranty
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>