HILTI HIT-FP 700 R Injectable Adhesive Anchors Instruction Manual

June 8, 2024
HILTI

HILTI HIT-FP 700 R Injectable Adhesive Anchors

Instructions

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-01

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-02

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-03

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-04

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-05

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-06

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-07

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-08

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-09

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-10

HILTI-HIT-FP-700-R-Injectable-Adhesive-Anchors-11

Anchoring system for rebar fastenings in concrete

Hilti HIT-FP 700 R
Contains: Lithium hydroxide (B);
L-(+)-tartaric acid (B)

Danger Causes skin irritation. (B)

  • Causes serious eye damage. (B)
  • Wear eye protection, protective clothing, protective gloves.
  • Do not get in eyes, on skin or on clothing.
  • IF IN EYES: Rinse cautiously with water for several minutes. Remove contact lenses, if present and easy to do. Continue rinsing.
  • IF ON SKIN: Wash with plenty of water.
  • If eye irritation persists: Get medical advice/attention.
  • If skin irritation or rash occurs: Get medical advice/attention.

Contains 2-octyl-2H-isothiazol-3-one. May produce an allergic reaction.

Disposal considerations

Empty packs: Leave the mixer attached and dispose of via the local Green Dot recovery system
or
EAK waste material code: 1 50102 plastic packaging.

Full or partially emptied packs: Must be disposed of as special waste in accordance with official regulations.

EAK waste material code: 08 04 09 waste adhesives and sealants containing organic solvents or other dangerous substances.
or
EAK waste material code: 20 01 27
paint, inks, adhesives and resins containing dangerous substances.

Product Information

Always keep this instruction for use together with the product. Ensure that the instruction for use is with the product when it is given to other persons.

Material Safety Data Sheet: Review the MSDS before use.

Check expiration date: See expiration date imprint on foilpack manifold (month/year). Do not use expired product.

Base material temperature at time of installation: 5 °C to 40 °C / 41°F to 104 °F.

Foil pack temperature during usage: +5 °C to 40 °C / 41 °F to 104 °F.

Conditions for transport and storage: Keep in a cool, dry and dark place between +5 °C to 25 °C / 41 °F to 77 °F. For any application not covered by this document / beyond values specified, please contact Hilti. Working Times of mortar can vary in dry concrete. Foil bag can only be used once.

Failure to observe these installation instructions, use of non-Hilti anchors, poor or questionable concrete conditions, or unique applications may affect the reliability or performance of the fastenings.

NOTICE
Improper handling may cause mortar splashes. Always wear safety glasses, gloves and protective clothes before handling the mortar!

  • Never start dispensing without a mixer properly screwed on.

  • When using an extension hose: Discard of initial mortar flow must be done through supplied mixer only (not through the extension hose).

  • Attach a new mixer prior to dispensing a new foil pack (snug fit).

  • Caution! Never remove the mixer while the foil pack system is under pressure. Press the release button of the dispenser to avoid mortar splashing.

  • Use only the type of mixer supplied with the mortar. Do not modify the mixer in any way.

  • Never use damaged foil packs and/or damaged or unclean foil pack holders.
    Poor load values / potential failure of fastening points due to inadequate borehole cleaning. The boreholes must be dry and free of debris, dust, water, ice, oil, grease and other contaminants prior to mortar injection. Hilti hollow drill bits TE-CD, TE-YD must be used in conjunction with a properly maintained Hilti vacuum cleaner with model and suction capacity (volumetric flow rate) as specified in the accessory table.

  • For blowing out the borehole – blow out with oil free air until return air stream is free of noticeable dust.

  • For flushing the borehole – flush with water line pressure until water runs clear.

  • Brushing of borehole essential step in borehole preparation after hammer – and diamond drilling.

  • Important! Remove all water from the borehole and blow out with oil free compressed air until borehole is completely dried before mortar injection.

  • Loading or manipulation of rebar is not allowed within the assembly time assembly. Even if still within working time work, do not touch the rebar anymore after setting
    completion.

  • For brushing the borehole – only use specified wire brush. The brush must resist insertion into the borehole – if not the brush is too small and must be replaced.

  • Do not exceed the roughening time, when roughening the borehole.
    Ensure that boreholes are filled from the back of the borehole without forming air voids. If necessary, use the accessories / extensions to reach the back of the borehole.

  • For overhead applications use the overhead accessories HIT-SZ and take special care when inserting the fastening element. Excess mortar may be forced out of the borehole. Make sure that no mortar drips onto the installer.

  • Ensure that the curing time truce is fulfilled before full loading.

  • It is required to set the anchor immediately after cleaning the borehole!

Not adhering to these setting instructions can result in failure of fastening points!

Made in Germany
Hilti = registered trademark of Hilti Corporation, Schaan, Liechtenstein
www.hilti.group
© 2022 Right of technical changes reserved S.E. & O

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals