PEAK Modular Fencing 94 Inch H Matte Black Aluminum In-Ground Instructions
- June 9, 2024
- PEAK
Table of Contents
Modular Fencing
Installation Instructions
Modular Fencing 94 Inch H Matte Black Aluminum In-Ground
No representation or warranty is given that your particular application of these products complies with relevant building codes. Therefore consult with professionals and local building officials before beginning work: (i) to ensure compliance with relevant building codes for your application; (ii) to identify appropriate safety gear that is to be used during installation such as a safety harness when working above ground; (iii) to ensure that the work area is free from utilities, services and hazards; and, (iv) to clarify any instructions or warnings that may not be clear. It is the responsibility of the installer to evaluate the conditions and determine the appropriate hardware and procedure. Failure to do so could result in personal injury, damage to the product, or other damage. Work in a safe manner wearing protective gear such as gloves, eyewear, headwear, footwear and clothing. When using tools always comply with operation manuals and instructions. Metal and other materials may have sharp edges and could fragment or splinter during or as a result of handling or cutting. Do not use these products in connection with any substance that is or may be harmful or corrosive to the products. Inspect and maintain these products on a regular basis. No member of The Peak Group of Companies (as defined at www.peakproducts.com) shall be liable for any loss or damage resulting from the improper installation or use of this product. In the unlikely event that any member of The Peak Group of Companies becomes liable for any loss or damage, the aggregate liability shall be limited to the retail purchase price of the product. Peak® products and the materials associated therewith are protected by patents, designs, copyright and/or trademarks. All trademarks are used under license from Peak Innovations Inc. May be subject to patent(s) or patent(s) pending.
Important Information
Maximum WindGust Speed* | Maximum Post Spacing |
---|---|
Up to 105 mph | 6 ft |
Up to 125 mph | 4 ft |
Tools and Materials Needed
Drill | Level |
---|---|
Driver bits | Measuring tape |
Hammer | Wood fence boards |
Hammer drill | Brackets for Wood Boards |
5/16″ Drill bit for concrete | Posts |
3/16″ Drill bit for metal | #12×1″ flat head screws |
7/16″ Wrench | #8×3/4″ pan head screws |
Post hole digger
Shovel
Concrete mixing equipment
Concrete trowel
Dry premixed concrete (per post):
Climate with frost heave – 200lb.
Climate without frost heave – 100lb.
*Quantities are estimated. Always check with your local codes for post hole size and depth.
Measure and mark the position of all posts and ensure they are aligned.
A: For hard-surface posts: Position first post. For concrete attachment,
use hammer drill with 5/16″ masonry bit to drill four holes 3″ deep through
each corner of post base. Clean holes. Use hammer to insert assembled concrete
anchors (provided) until washer is touching post base. Use 7/16″ wrench to
tighten nuts. Ensure post is plumb. Position second post (do not secure it
yet).
B: For in-ground posts : Position first post and second post. Dig the
post holes. Dig the post holes. Position posts in the post holes and brace
plumb. Mix and pour concrete into the post holes. Recommended post depth
underground: 17½”
Always check your local codes for post hole size and depth. Post holes should
extend below the frost line.
A: Slide first bracket into slot on post and position at desired height.
B: Drill two 3/16″ holes through each bracket and post, 1″ from each end of
bracket. C: Fasten each bracket to post with two #12×1″ flat head screws (not
provided).
Ensure holes on edge of bracket are on desired side.
Cut board to required length. Slide board into brackets and fasten board to brackets with four #8×3/4″ pan head screws (not provided).
Cut remaining boards to required length.
A: Slide one spacer into each post, followed by a bracket.
B: Position a board into the brackets and fasten using four #8×3/4″ pan head
screws (not provided).
Repeat until there is one board left to install.
Slide final spacer and bracket into each post.
A: Drill two 3/16″ holes through each bracket and post, 1″ from each end of
bracket.
B: Fasten brackets to posts with two #12×1″ flat head screws (not provided).
A: Position board into brackets and fasten using four #8×3/4″ pan head screws
(not provided).
B: Install post caps.
II37_MF_Install Guide_V1
Documents / Resources
| PEAK
Modular Fencing 94 Inch H Matte Black Aluminum In-
Ground
[pdf] Instructions
Modular Fencing, 94 Inch H Matte Black Aluminum In-Ground, Matte Black
Aluminum In-Ground, Black Aluminum In-Ground
---|---