G21 GAH 529 Steel Base User Manual

June 3, 2024
G21

G21 GAH 529 Steel Base User Manual

Thank you for purchasing our product.
Before use, please read these instructions carefully.

Základna GAH 884

Name| Qty
V-A1| 8
V-A3| 6
| 24

INSTALLATION

Kit before you begin / Site preparation

  1. Before beginning construction, check local building codes regarding footings, location and other requirements.
  2. Follow all directions and dimensions carefully.
  3. Follow the step sequence carefully for correct results.
  4. Be sure all the parts fit together properly before proceeding.
  5. SAFETY FIRST: Care must be taken when handling various pieces of your kit because some contain sharp edges. Wear work gloves, eye protection and long sleeves when assembling or per-forming any maintenance on your kit.
  6. BASIC TOOLS: Screwdriver, pliers, work gloves, tape measure, level and a spade or shovel.
  7. GROUND MUST BE LEVEL: Be sure floor frames lie flat on ground. To prepare construction, re-move sod and other bumpiness. Level the high spots with flat shovel and tamp construction down.
  8. Separate contents of the carton by the part number while reviewing parts list. Check to be sure that you have all the necessary parts for your kit.

Images used in this manual are for illustrational purposes only and may differ from the actual product.


Read More About This Manual & Download PDF:

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals