DRAZICE OKCE-E 50 Tank Type Water Heater for Vertical Mounting Instruction Manual
- June 10, 2024
- Drazice
Table of Contents
- CAREFULLY READ THIS MANUAL BEFORE INSTALLING THE WATER HEATER!
- PRODUCT TECHNICAL SPECIFICATION
- OPERATION AND FITTING INSTRUCTIONS
- PLUMBING FIXTURE
- ELECTRICAL INSTALLATION
- OPERATING ACTIVITY
- FIRST COMMISSIONING
- OPERATION OF THERMOSTAT
- IMPORTANT NOTICES
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
OPERATING AND
INSTALLATION MANUAL
TANK-TYPE WATER HEATER FOR VERTICAL MOUNTING
Electric water heaters
OKCE/E 50 OKCE/E 80 OKCE/E 100
OKCE/E 125 OKCE/E 160 OKCE/E 200
CAREFULLY READ THIS MANUAL BEFORE INSTALLING THE WATER HEATER!
Dear Customer,
Družstevní savory Drastic – strojírna servo., would like to thank you for your
decision to use a product of our brand. With this guide, we will introduce you
to the use, construction, maintenance and other information on electrical
water heaters.
The product is not intended to be controlled by
a) people (including children) with reduced physical, sensual or mental
capacities, or
b) people with insufficient knowledge and experiences unless supervised by
responsible person, or unless properly instructed by such responsible person.
The manufacturer reserves the right for engineering modification of the
product. The product is designed for permanent contact with drinkable water.
It is recommended to use the product in indoor environment with air
temperatures from +2 °C to +45 °C and a relative humidity up to 80 %.
Product’s reliability and safety is proven by tests implemented by the
Engineering Test Institute in Brno.
Made in the Czech Republic.
Meaning of pictograms used in the Manual
| Important information for heater users.
---|---
| Abiding by the recommendations of the manufacturer serves to ensure trouble-
free operation and the long service life of the product.
| Caution!
Important notice to be observed.
PRODUCT TECHNICAL SPECIFICATION
FUNCTION DESCRIPTION
Tank type water heater (the heater hereinafter) is designed for the accumulation heating of service water by electric energy. Water is heated by an electric element in an enameled thermally insulated tank at the time defined by the power supplier. The element is at the time of heating controlled by a thermostat the temperature of which can be adjusted continuously (within the range between 0 °C and 77 °C). Once the selected temperature is reached, heating interrupts automatically. Water accumulated in the tank is then used for consumption. The tank keeps constant pressure of water from the water main. If the combination faucet hot water valve is opened, water from the water supply conduit pressed out by cold water pressure flows out of the heater. Hot water flows out through the top part, and water flowing in remains in the bottom part of the heater. Pressure principle allows hot water withdrawal at any place from the heater.
1.2 ADVICE FOR CUSTOMERS
1.2.1 HOT WATER CONSUMPTION
Consumption of hot water in households depends on the number of people,
amount of sanitary equipment, length, diameter and insulation of piping in the
flat, or on individual habits of users.
The cheapest option of water heating comes at the time when the electricity
rate is reduced.
Find out in what time intervals your electricity supplier provides reduced
tariff and, depending on that information, select relevant volume and power
input of the heater so that your hot water consumption covered the needs of
your household.
1.2.2 ENERGY SAVING
The heater is insulated with quality polyurethane Freon free foam. Set the
temperature of the heater’s thermostat to that level only that you need to run
your home. Thus you will reduce electricity consumption, as well as the
amount of lime sediments on the walls of the receptacle and on the electric
body.
1.2.3 EMERGENCY POWER CONSUMPTION
According to current legislation, the standby consumption is stated in the
value of annual consumption of electric energy (kWh), which is measured
according to the corresponding load profile and calculated according to the
formulas and requirements of EU Regulation No. 812/2013.
TYPE| | OKCE/E 50| OKCE/E 80| OKCE/E 100| OKCE/E 125|
OKCE/E 160| OKCE/E 200
---|---|---|---|---|---|---|---
VOLUME| l| 49| 75| 97| 122| 149| 199
MAX OPERATING OVERPRESSURE IN THE TANK| bar| | | | 6| |
ELECTRICAL CONNECTION| | | | 1/N/PE ~ 230V/50Hz| |
RECOMMENDED BREAKER| | | | 16 A| |
INPUT| W| | | 2200| |
EL. PROTECTION| | | | IP 44| |
MAX TEMPERATURE TV| °C| | | 80| |
RECOMMENDED HOT WATER (HW) TEMPERATURE| °C| | | 60| |
HEIGHT OF THE HEATER| mm| 585| 757| 902| 1067| 1255| 1300
HEATER DIAMETER| mm| 524| 524| 524| 524| 524| 584
MAX WEIGHT OF THE HEATER WITHOUT WATER| kg| 28| 32| 39| 43| 49| 66
TIME OF EL. HEATING FROM 10 °C TO 60 °C| hrs| 1.3| 2.0| 2.6| 3.2| 3.9|
5.3
MIXED WATER V40| l| 80.84| 138.70| 165.41| 231.10| 242.83| 331.26
LOAD PROFILE| | M| M| M| M| L| XL
ENERGY EFFICIENCY CLASS| | C| C| C| C| C| C
ENERGY EFFICIENCY| %| 38| 38| 38| 36| 39| 38
ANNUAL CONSUMPTION OF ELECTRIC ENERGY| kWh| 1365| 1342| 1362| 1409|
2622| 4403
DESIGN AND GENERAL HEATER DIMENSIONS
The heater tanks are made of a steel plate and tested by 1.5 multiple of the
operating pressure values.
The inside of the receptacle is enameled. A flange is welded onto the bottom
of the tank with a flange lid screwed to it. A sealing ring is inserted
between the flange lid and the flange. Thermowells for placing a heating
element, thermostat sensors and safety fuses are located in the flange lid. An
anode rod is mounted onto the M8 nut. Electric wiring is placed underneath
the plastic removable cover. Description of basic parts of the heater – Figure
- Heater dimensions – Figure 2 and Table 2.
- Heating element well
- Ceramic heating element 2200 W
- Digital temperature indicator
- Service thermostat with external control and safety pipe
- Electric installation cover
- Cold water supply pipe
- Thermowell
- Hot water withdrawal pipe
- Mg anode
- Enameled steel receptacle
- Polyurethane insulation
- Heater shell
OKCE/E 50, OKCE/E 80, OKCE/E 100, OKCE/E 125, OKCE/E 160, OKCE/E 200
Upper and lower Hinge 200 l4 anchoring screws Dimension’s 450mm and F check
before drilling
Upper hinge 50-160 l 2 anchoring screws
3/4″ outer
| OKCE/E 50| OKCE/E 80| OKCE/E 100| OKCE/E 125| OKCE/E
160| OKCE/E 200
---|---|---|---|---|---|---
A| 585| 757| 902| 1067| 1255| 1300
B| 562| 562| 562| 562| 562| 617
C| 14| 14| 14| 14| 14| 14
D| 524| 524| 524| 524| 524| 584
E| 440| 605| 725| 760| 1000| 806
F| 369| 508| 654| 682| 925| 600
H| 135| 142| 167| 297| 245| 480
K| 116| 116| 116| 116| 116| 116
R| 450| 450| 450| 450| 450| 450
OPERATION AND FITTING INSTRUCTIONS
OPERATING CONDITIONS
The tank shall only be used in accordance with the conditions specified on the
power plate and in instructions for electric wiring. Besides legally
acknowledged national regulations and standards, also conditions for
connection defined in local electric and water works have to be adhered to, as
well as the installation and operation manual.
The temperature at the place of heater installation must be higher than +2 °C;
and the room must not freeze. The appliance has to be mounted at a convenient
place, it means that the appliance must be easily available for potential
necessary maintenance, repair or replacement, as the case may be.
If water is strongly calcareous we recommend that any of the common
decalcifying devices was installed with the appliance, or that the thermostat
was set to the minimum operating temperature of 55 °C (setting to position
„OPTIMUM“) – Figure 9. For proper operation, drinkable water of adequate
quality shall be used. To avoid potential sediments, we recommend that the
device was installed together with a water filter.
WALL MOUNTING
Prior to the mounting check the bearing capacity of the wall and the material
it is made of, considering the weight of the heater filled with water.
Depending on the wall material choose adequate fixtures. We recommend
entrusting wall mounting and anchoring to a specialist company or consult the
suspension with a building specialist. When mounting the anchor bolts follow
the guide provided by the anchor bolts’ manufacturer.
Mount the anchors by the dimensional drawing (Figure 2) in 450 mm spacing. The
heater verticality after the release of the connecting screws can be aligned
by means of slight turning. Double check the torque of the suspension bolts
on the heater and suspend the heater.
Universal suspension
The use of the suspension even for the screw spacing during the replacement
with a heater of another type.
The heater verticality after the release of the connecting screws can be
aligned by means of slight turning.
If the hot water heater is mounted in a tight, small space, or in an
intermediate ceiling, etc., you have to make sure that the connecting side of
the appliance (connections to water supply, area for electric plugging)
remained accessible and no heat accumulation occurs. Free space of up to 600
mm from the bottom edge of the heater has to be available under the heater.
When mounted directly under the ceiling, the distance from the ceiling has to
be 50 mm at least.
If the water heater is mounted in enclosed areas, inter-ceilings, built-in
structures, and recesses, ensure sufficient access to service fittings,
electrical terminal boards, anodes and manholes.
Minimum spacing from manhole is 600 mm.
PLUMBING FIXTURE
The heater connects to water distribution tubes with G 3/4“ thread in the
bottom part of the heater. Blue – cold water supply, red – hot water outlet.
For potential disconnection of the heater, the service water inlets and
outlets must be provided with screw coupling Jess 3/4“. The safety valve is
mounted on the cold water inlet identified with a blue ring.
The heater must be equipped with a membrane, spring-loaded safety valve.
Safety valves with fixed pressure settings from the manufacturer are used for
the assembly. Each individually lockable heater must be fitted with a cap on
the cold water inlet, a test valve or a stopper to check the operation of the
check valve, with a check valve and a relief valve (Figure 4).
The safety valve with a check valve is supplied with the heater.
It is necessary to check the safety valve each time before putting it into
operation. It is checked by manual moving of the membrane from the seat,
turning the make-and- break device button always in the direction of the
arrow. After being turned, the button must click back into a notch.
Proper function of the make-and-break device results in water draining through
the safety valve outlet pipe. In common operation, such a check needs to be
implemented at least once a month, and after each heater shutdown for more
than 5 days. Water may be dripping off the drain pipe of the safety valve; the
pipe must be open into the air, pointed down; environment temperatures must
not drop below zero.
Find necessary pressure values in the below – Table 3.
Heaters must be provided with a discharge valve mounted on the cold service
water inlet to the heater for potential disassembly or repair. When assembling
the security equipment, follow the standard.
SAFETY VALVE START-UP PRESSURE [MPa] ALLOWABLE OPERATINGOVERPRESSURE OF WATER
HEATER [MPa] MAXIMUM PRESSURE IN COLD WATER PIPES [MPa]
TANK TYPE ELECTRIC WATER HEATER HOT WATER DISTRIBUTION
ELECTRICAL INSTALLATION
GENERAL INFORMATION FOR ELECTRICAL INSTALLATION
Perform the connection according to the scheme. Factory connection must not be changed! (Figure 7) the electric wiring casing remove the partition corresponding with the input wire diameter of Ø8 or Ø10 (Figure 6). The degree of protection of electric parts of the heater is IP 44. Power input of electric element is 2200 W.
It is necessary to observe the below requirements during the electric wiring.
- The electric wiring scheme is attached to the water heater on the side of the electric installation guard (Figure 7).
- Connection, repairs, and wiring inspections may only be implemented by a company (person) authorized to such activity.
- Expert connection must be confirmed on the warranty certificate.
- The heater is connected to the 230 V/50 Hz electrical network using a fixed moving conductor with the circuit breaker (protector).
- Installations in bathrooms, laundry rooms, rest rooms and showers, must be in compliance with standard.
- The degree of protection of electric parts of the heater is IP 44.
- Adhere to the protection against electric shock injury according to standard.
OPERATING ACTIVITY
After the heater is connected to the electric network, the heating element
starts heating the water.
An electronic thermostat is used to control the temperature and water heating.
The thermostat control range is 0 °C to 77 °C. The temperature is indicated on
the display. The thermostat displays the current measured temperature. Use
the control knob to set the desired cut-off temperature. Turn the knob to the
right to set a higher temperature, turn it to the left to set a lower
temperature. When the cut-off temperature is set, the digits on the display
are flashing – indicating the user has set the desired temperature. After the
desired temperature has been set, the value remains flashing for 5 seconds,
then the current temperature is displayed. The heating indicator is on the
right side of the display. The light indicates heating. Error, fault messages:
E1 – flashing – fault of the temperature sensor (broken sensor, short
circuit), indicated on the display. Water heating is not working during the
fault indication.
The round thermostat knob must be handled with care, do not overturn the
defined position, and avoid stronger shocks and impacts.
For long-term operation without use, it is advisable to set the thermostat to
the position 5 °C to 10 °C (set the thermostat control to the “snowflake”
symbol) to avoid freezing or turn off the power supply into the heater.
Setting the thermostat to the zero position does not mean the heater has been
turned off.
In case of a power failure, the display turns off, it means also when the
heating is turned off according to the HDO signal. The thermostat setting knob
is still active, so by turning it you can change the temperature, which only
takes effect when the power is restored.
FIRST COMMISSIONING
Before opening the power supply, the tank must be filled with water. The
process of first heating must be executed by licensed professional who has to
check it. Both the hot water outlet pipe and safety armature parts may be
hot.
During the heating process the pressurized connection water that increases its
volume due to heating must drip off the safety valve. In non-pressurized
connection water drips off the overflow combination faucet. When heating is
finished, the set temperature and the actual temperature of consumed water
should be roughly equal. After connecting the heater to the water main and
electrical power system, and after checking the safety valve (following the
instructions attached to the valve), the heater can be put into operation.
Before fist putting into service or after a longer shutdown the appliance has
to be rinsed out and flushed yet before heating is activated. Before heating
starts, the tank must be completely filled with water and the system properly
flushed and vented. First heating of the tank has to be watched.
Procedure of putting the heater into operation:
- Check the water main and wiring. Check proper placement of operating and safety thermostat sensors. The sensors must be inserted all the way in, first the operating and then the safety thermostat.
- Open the hot water valve on the combination faucet.
- Open the cold water inlet valve to the heater.
- As soon as the water starts running through the hot water valve, the heater is filled, and the valve can be closed.
- In case of leakage (of flange lid), we recommend that the flange lid bolts are fastened.
- Screw down the electric installation guard.
- When hot service water is heated by electric energy, switch on the power supply.
- When commencing operation, flush the heater until the cloudiness in the water is gone.
- Make sure to fill in properly the warranty certificate.
PUTTING OUT OF SERVICE, DISCHARGE
If the hot water heater is put out of service for a longer time, or if it is
not going to be used it has to be drained and disconnected from the electric
supply network. The switch for the supply lead or the fuse cut-outs have to
be shut off.
At places with permanent risk of frost the hot water heater must be drained
before the cold season starts if the appliance remains out of service for
several days and if the power supply is disconnected.
Drainage of service water shall be performed after closing the shut-off valve
in the cold water supply piping (through the discharge valve for safety valve
combination), and with simultaneous opening of all hot water valves of
connected fittings (water can be also drained through safety valve; for that
purpose, the safety valve is turned to the “Check” position). Hot water may
outflow during the drainage! If there is a risk of frost it has to be
considered that not only the water in the hot water heater and in the hot
water piping may get frozen but also the water in the entire cold water supply
piping. It is therefore advisable to drain all fittings and piping that carry
water, up to the part where the house water meter is installed (connection of
the house to water main) which is not jeopardized by frost. When the tank is
to be used again, it has to be filled with water and one needs to make sure
that the water flowing out at the hot water valves did not contain any
bubbles.
INSPECTION, MAINTENANCE & CARE FOR THE APPLIANCE
During the heating process the water that increases its volume during the heating must visibly drip off the safety valve outlet (in non-pressurized connection this water drips off the combination faucet valve). In full heating (about 77 °C) the volumetric water gain is approx. 3 % of the tank capacity. The function of the safety valve has to be checked regularly. If the safety valve control knob is lifted or turned to the “Control” position, the water must flow out easily, without any obstacles, from the safety valve element to the outfall line. In common operation, such a check needs to be implemented at least once a month, and after each heater shutdown for more than 5 days.
Attention! In doing so, the cold water supply pipe and the connection fitting of the tank may get heated! If the hot water heater does not work, or if hot water is not withdrawn, no water shall drip off the safety valve. If water drips, then the water pressure in the supply piping is either too high (if higher than 4.8 bars, a pressure control valve has to be fitted), or the safety valve is defective. Please call a specialized plumber immediately!
If water contains too many minerals, an expert has to come to remove the scale
that forms inside the tank, as well as free sediments. This has to be
performed after one or two years of operation. The cleaning is carried out
through the hole in the flange – dismantle the flange lid and clean the tank.
A new sealing has to be used for re-fitting. Since the inside of the heater
has special enamel, which must not get in contact with the scale removing
agent – do not work with a lime pump. Remove the lime layer with a timber and
suck it off or wipe it off with a clout. After that, the appliance must be
rinsed thoroughly, and the heating process is checked the same as during the
initial putting in operation. Do not use any abrasive cleaning agents (such as
liquid sand, chemicals – acid, alkaline) or dye thinners (such as cellulose
thinner, trichloro, and the like) to clean the outer shell of the heater. For
cleaning use a wet clout and add a few drops of liquid cleaning agent for
household applications. Repeated heating causes lime scale settling on the
receptacle walls and mostly on the lid of the flange. Lime scale settling
depends on hardness of heated water, its temperature and on the volume of hot
water used.
We recommend checking and cleaning the tank from scale and eventual
replacement of the anode rod after two years of operation. The anode life is
theoretically calculated for two years of operation; however, it changes with
water hardness and chemical composition in the place of use. Based on such an
inspection, the next term of anode rod exchange may be determined. If the
anode is only blocked with sediments clean its surface and, if used up, mount
a new one. Have a company in charge of service affairs deal with the cleaning
and exchanging of the anode. When draining water from the heater, the
combination faucet valve for hot water must be open, preventing occurrence of
under-pressure in the heater tank which would stop the water from draining.
MOST FREQUENT FUNCTION FAILURES AND THEIR CAUSES
FAILURE SYMPTOM | INDICATOR | SOLUTION |
---|---|---|
Water is cold | Light on | The temperature set on the thermostat is too |
low; heating element failure
Water is cold| Light off| No supply voltage!
Thermostat failure – When a temperature sensor fault, the flashing code E1
will appear on display Thermostat failure Safety thermostat shut off probably
due to failed operation thermostat
Water is not warm enough| Light on| Failure of one of the coils in the
element (2x 1100W)
Temperature of water is not corresponding with the temperature set on the
control| | Defective thermostat
Water is constantly dripping off the safety valve| Light off| High
input pressure
Defective safety valve
Table 4
Do not attempt to repair the failure yourselves. Seek either expert or service
help. It does not take much for an expert to remove the defect. When making a
repair appointment, report the type and serial number you find on the
performance plate of your water heater.
OPERATION OF THERMOSTAT
OPERATING DEVICES OF THE HEATER
Electrical installation cover for heaters OKCE/E
Thermostat and no other part of the control panel is not a bearing part which can be used for any handling with the heater.
TEMPERATURE SETTING
Water temperature is set by turning the thermostat knob. The desired symbol is adjusted against the fixed point on the control panel (Figure 9).
Adjusting the thermostat knob to the left backstop does not mean permanent shutoff of the heating element. When the heater is in use without blocking the daily rate, we do not recommend the temperature to be set above 55 °C. Select the “OPTIMUM” symbol as the maximum.
IMPORTANT NOTICES
INSTALLATION REGULATIONS
– Without a confirmation of performed electrical installation issued by an
authorized company, the warranty certificate shall be void.
– Check and exchange the Mg anode regularly.
– You have to apply for approval of a local power supplier to connect the
heater.
– No stop valves can be put between the heater and the safety valve.
– If the overpressure in the water main exceeds 0.48 MPa, a pressure control
valve must be mounted before the safety valve.
– All hot water outputs must have a combination faucet.
– Before filling the heater with water for the first time, it is recommended
to fasten the flange connection nuts of the tank.
– It is not allowed to handle the thermostat, aside from temperature resetting
with a control button.
– All electric installation handling, adjustment and replacement of the
regulation elements shall only be performed by an authorized service company.
– The thermal fuse must not be turned off! In case of thermostat defect, the
thermal fuse interrupts electric power input to the heating element if the
water temperature in the heater exceeds 90 °C.
– If you don’t use the heater (hot water tank) for longer than 24 hours, or if
the facility with heater is unattended, close the cold water inlet to the
heater.
– The heater (hot water tank) shall be used exclusively in accordance with the
conditions specified on the performance plate and in the instructions for
electric wiring.
– The recommended operating pressure in the hot water circuit is 0.48 MPa.
Both the electric and water installation must follow and meet the requirements and regulations relevant in the country of use!
TRANSPORT & STORAGE INSTRUCTIONS
The device shall be transported and stored in dry place and protected from weather effects with temperature range from -15 to +50 °C. During loading and unloading the instructions stated on the packaging shall be observed.
DISPOSAL OF PACKAGING MATERIAL AND NONFUNCTIONING PRODUCT
A service fee for providing return and recovery of packaging material has been
paid for the packaging in which the product was delivered. The service fee was
paid pursuant to Act No 477/2001 Coll., as amended, at EKO-KOM a.s. The client
number of the company is F06020274. Take the water boiler packages to a waste
disposal place determined by the town. When the operation terminates,
disassemble and transport the discarded and unserviceable heater to a waste
recycling center (collecting yard), or contact the manufacturer.
The product is supplied with a safety valve. The above part is packed and
placed in the packaging in the top part of the heater.
It is in your own interest to check the completeness of the accessories.
Družstevní savory Drastic-strojírna servo.
Drastic 69, 294 71 Beaky and Jizerou
tel.: +420 / 326 370 911
fax: +420 / 326 370 980
e-mail: export@dzd.cz
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>