tp-link Omada GPON Test Lab 2 User Guide

September 17, 2024
tp-link

Omada GPON Test Lab 2

Specifications

  • Product Name: GPON Test lab 2 Guide
  • Brand: Ot-link
  • Test Lab: Lab2 – Create a Basic L2 Network with VLANs
  • Supported VLANs: 10, 20, 1 (default VLAN)
  • DHCP Pools:
    • VLAN 10: 192.168.10.1/24
    • VLAN 20: 192.168.20.1/24
    • Default VLAN: 192.168.0.1/24 (gateway default)

Product Usage Instructions

Configuration Steps:

  1. Create Network VLAN 10 and VLAN 20.
  • Staff_Network:

  • Guest_Network:

  • Configure OLT:

    1. Create S_VLAN 10 & VLAN 20
    • VLAN 10:
    • VLAN 20:
  • Config Line Profile:

    • Create a T-cont profile

FAQ

Q: How do I verify the network configuration after setup?

A: Connect a device to Staff_SSID and Guest_SSID to check if the
IP addresses are assigned correctly.

Q: What should I do if the service ports are not active?

A: Deactivate and activate the ONU again, then ensure all
service ports are active.

GPON Test lab 2 Guide

Ot-link

Lab2:CreateaBasicL2NetworkwithVLANs

Internet

Usage
Staff
Guest ManagementVLAN

VLANID 10 20 1(defaultVLAN)

DHCPPool 192.168.10.1/24 192.168.20.1/24
192.168.0.1/24
(gatewaydefault)

TestItems:
CreateNetworkforVLAN10&VLAN20andcreatethe
correspondingDHCPpool.
ConfiguretheGPONOLTontheOmadaController
·Checktheconnectivityandtesttheperformance

OmadaGateway

OLT

GPONOLT

Software/Hardware Controller

GPONSplitter

PoE

OmadaPoEswitch

OmadaAP

StaffSSID:Staff_SSID GuestSSID:Guest_SSID

OmadaGPONAP
StaffSSID:Staff_SSID GuestSSID:Guest_SSID

©2024TP- LINKCORPORATIONPTE.LTD.Confidentialinformation.Notfordistributionorreproduction.

30

Configuration Steps: 1. Create Network VLAN 10 and VLAN 20.
Staff_Network:
Guest_Network:
Step 2: configure OLT Step 2.1 Create S_VLAN 10 & VLAN 20 VLAN 10: VLAN 20: Step 2.2 config Line Profile
create a T-cont profile create a T-cont create a two GEM port, GEM port 1 for VLAN 10, and GEM port 2 for VLAN 20, GEM port 3 for VLAN 1
create the GEM mapping rule. Map GEM port 1 to VLAN 10, map GEM port 2 to VLAN 20, map GEM port 3 to VLAN 1
VLAN 1 is untagged in our test, make sure you have selected the untagged option check all the setting above. Step 2.3 create the Service Port tip: Find the ONU ID, write it down. It will be used for Service Port configuration. Create service port for staff netwokr: map C-VLAN 10 to S-VLAN 10, tag action – transparent
Create Management VLAN : map C-VLAN N/A to S-VLAN 1, tag action – Default
Step 2.4 modify the GPON Auto authentication config, choose the Line Proifle GPON_lab just created Step 2.5 Deactive and active the ONU again. check the service port, make sure all the service port are Active Now you can follow the steps above to configure other ONUs. Step 3. Configure the Switch create switch profile for Staff_network
create Guest_Network switch profile

Step 4. bind the Staff_SSID with VLAN 10 and Guest_SSID with VLAN 20.
Verify the result: 1. connect the phone to the Staff_SSID, check if the phone can get the 192.168.10.x IP adreess. 2. connect the phone to the Guest_SSID, check if the phone can get the 192.168.20.x IP address.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals