ACDC Dynamics DKS-1.1Hydrostat 1-3 Bar Adjustable Ip65 Installation Guide
- August 31, 2024
- ACDC DYNAMICS
Table of Contents
- ACDC Dynamics DKS-1.1Hydrostat 1-3 Bar Adjustable Ip65
- SPECIFICATIONS
- INSTRUCTIONS FOR CORRECT UNIT INSTALLATION
- WIRING DIAGRAMS FOR CONNECITNG THE UNIT TO DIFFERENT KINDS OF PUMP’S
- POSSIBLE WORKING DEFECTS
- UNIT STARTING AND WORKING
- BRANCH CONTACT DETAILS
- NATIONAL CALL CENTRE
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
ACDC Dynamics DKS-1.1Hydrostat 1-3 Bar Adjustable Ip65
SPECIFICATIONS
- Input voltage 220-240V
- Frequency 50-60Hz
- Intensity Max 10A
- Protection rating IP65
- Maximum working pressure 10 bar
- Max working temperature 60°C
- Connection 1″ male
INSTRUCTIONS FOR CORRECT UNIT INSTALLATION
WIRING DIAGRAMS FOR CONNECITNG THE UNIT TO DIFFERENT KINDS OF PUMP’S
MOTORS
-
Wiring diagram for connection of single -phase 220V pumps up to 1.1 Kw.
-
Wiring diagram for connection of single phase 220V pumps over 1.1 Kw. Through remote control switch.
SPECIFICATIONS FOR REMOTE CONTROL SWITCH
Minimum contacts capacity of 4 Kw or 5.5 HP approx. 220V -
Wiring diagram for connection of three phase 380V motor pumps through remote control switch.
SPECIFICATIONS FOR REMOTE CONTROL SWITCH
Minimum contacts capacity of 4 Kw or 5.5 HP approx. 220V
POSSIBLE WORKING DEFECTS
UNIT STARTING AND WORKING
Warning
- Never take the electronic board out of the control box.
- The wiring diagram inside the terminal block will show you how to make correct connection. Wrong connection will destroy the whole electronic circuit.
- Cable used for connection must be a three-wired one with compulsory grounding end
- It shall have the outer diameter at 7.5mm min and 8.5mm max. One of the leading end of the cable must be lower than the position of the fixing screws while the cabel being connected to the power as shown in the Fig.
- The four screws on the panel board and the two nuts for fixing cable must be well fastened to avoid water entering into the control box and damaging the electronic circuit.
STARTING
- When the unit is connected to the electrical network, the green led “Power On”lights up and the yellow led “On” (pump in operation)indicates that the pump has been started.
- The pump continues to operate for dozens of seconds enabling the system to fill in the pipes and to reach the required pressure.
- If this lapse is insufficient, the red led “Failure”lights up.In this event,keep the “Restart” button pressed and wait, with a tap opened, until the red led is off.
- Once released the button and closed the tap, the unit stops the pump at its maximum pressure.
FUNCTIONING
- The starting operation archived, the unit is programmed to perform all the pump control operations automatically.
- When particular operational breakdowns occur,such as water failure, obstruction of the suction pipe etc., The unit recognizes the breakdown and the red led “Failure” lights up;at the same time a stop signal is sent to the pump to prevent damages caused by its working in the absence of water.
- Rectification of the failures that have caused the blockage, allows the system to be restarted by pressing the “Restart” button.
BRANCH CONTACT DETAILS
- Johannesburg 010 202 3300
- Germiston 011 418 9600
- Cape Town 021 510 0710
- Pinetown 031 700 4215
- Riverhorse 031 492 4800
NATIONAL CALL CENTRE
- Sales 010 202 3400
- Technical 010 202 3500
- www.acdc.co.za
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>