The Home Depot WQG106 10 Foot x 12 Foot Wall Mounted Gazebo Solarium Instructions
- August 31, 2024
- THE HOME DEPOT
Table of Contents
- The Home Depot WQG106 10 Foot x 12 Foot Wall Mounted Gazebo Solarium
- Specifications
- FAQs
- ASSEMBLY INSTRUCTIONS
- TOOLS REQUIRED
- BEFORE STARTING:
- ASSEMBLE PIECES BEFORE SCREWING THEM TO THE WALL
- CLEANING INSTRUCTIONS
- PARTS DESCRIPTION
- DIMENSION
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
The Home Depot WQG106 10 Foot x 12 Foot Wall Mounted Gazebo Solarium
Specifications
- Model: WQG106
- Size: 10 x 12 Solariam
- Base Dimensions: 144” x 118”
- Largest Dimensions: 144” x 122”
FAQs
Q: How many adults are recommended for assembly?
A: Assembly by two or three adults is suggested.
Q: What tools are required for assembly?
A: Tools required include screwdriver, knife, file, needle-nosed pliers, rubber mallet, step ladder, spatula, power drill, tube of silicon, and drill bit.
ASSEMBLY INSTRUCTIONS
DO NOT DESTROY THE BOXES UNTIL COMPLETELY ASSEMBLED PLEASE VERIFY THE CONTENT OF EACH BOX AGAINST THE LIST OF PARTS Assembly by two or three adults is suggested. Requires 96” clearance at the wall Base Dimensions 144’’x 118’’, Largest Dimensions 144’’x122’’
TOOLS REQUIRED
- Screwdriver
- Knife
- File (smooth)
- Needle-nosed pliers
- Rubber mallet
- Step ladder (minimum 6′ in height)
- Spatula
- Power drill
- Tube of silicon
- Drill bit 5/16″ cement (according to surface)
BEFORE STARTING:
Ensure that you have a solid base, such as a concrete or wooden deck, not slanted more than 1” per 8’. Avoid installing units adjacent to trees or a sloped roof, as snow and ice may slide onto the solarium and cause it to collapse. Please don’t destroy boxes until completely assembled.
STEP #1
Decide the position of the door frames before assembly according to where you
intend to slide the door. At the front of the solarium, use frame D3 for the
opening of the door and B3 for the direction of the door when open. Ensure
frames A-3 ½ are at the front of the sides. Use E3 between frame ends and use
two (2) K3 joints for corners.
NOTE: When placing the door frame opening, make sure the inserts on the
frame are on the inside and on the upper half of the frame of the solarium
because the door will be set on the inside due to clearance.
NOTE: When sliding the connectors, shake the frame so that they will
slide easily. Do not use tools to force. If needed, clean the paint with a
file and make sure the ends of the frame and joints are not bent or warped. If
so, use the needle-nosed pliers to straighten.
STEP #2
Slide the vertical guides Vv-3 left and Ww-3 right into the 2 ends of the frames along the grooves, shaking while sliding for easier movement. Next, slide two (2) Yy-3 and one (1) Zz-3 from left side to right on top of the frame. The groove should be towards the interior of the unit. Repeat from the right side with two (2) YY-3 and one (1) Zz-3 and space evenly.
STEP #3
Assemble ML-3, N-3, O-3, and MR-3 as shown and position evenly above vertical guides, at 96’’ from the ground. Secure wall track and vertical tracks to brick or cement wall by drilling through the aluminum and using screws Xx-3. Insert the 2 horizontal guides, I3 & J3 at the top of the frame. Make sure the 2 frames are at the correct level, if not, use shims to compensate. Do not use tools to force.
ASSEMBLE PIECES BEFORE SCREWING THEM TO THE WALL
NOTE: Once the wall track is in place, apply silicon along the top of the wall track and at the joint of the two tracks. Silicon is not supplied.
STEP #4
Set polycarbonate exposed side on the outside over horizontal left guide I-3,
use one (1) Rr-3 panel, one (1) P-3 joint, and one (1) Ss-3 panel, then do the
right side with one (1) Tt-3 panel, one (1) Q-3 joint and one (1) Uu-3 panel
over the J-3 horizontal panel. Secure P-3 and Q-3 to I-3 and J-3 respectively
with self-tapping screws (Z-3).
STEP #5
Set right rafter T-3 over last bracket then secure it with Bb-3 screw and
continue screwing through joint K-3 with the Bb-3 screw. Repeat on left side
with rafter S-3.
STEP #6
Set U-3 rafters over the middle of each p anel with Bb-3 screws at the top and
t wo (2) Z-3 screws over the brackets on frame manually. Do not use power
drill.
STEP #7
Remove protective film from two (2) sides of each panel and make sure the top
side of the panel faces the sunlight. Insert and slide on the top groove of
the rafters all the way to the end. Pp-3 should go first and last with the
Qq-3 panels in between.
STEP #8
Insert the aluminum middle roof joint between the rafters, making sure the
slotted holes are at the bottom. Slide into upper and lower grooves of the
rafters then slide all the way into the panels. Make sure the panels are
inside the aluminum middle roof joint groove. Insert a V-3 at either end, then
insert all W-3 and then the remaining V-3. Tap gently with rubber mallet if
needed.
STEP #9
Insert the second row of panels into the lower groove on the rafter. Slide
panels until they reach the aluminum pieces between the panels and gently tap
on the panel to guide it into the aluminum groove. Use a spatula if needed to
make it fit. Insert two (2) Pp-3 on either end, then insert the Qq-3 panels.
STEP #10
Starting at either end, add X-3 edging and one (1) R-3 bracket and screw with
Bb-3 manually, do not use power drill. Add Y-3 edging and repeat until you
reach the end, then add the X-3 edging.
STEP #11
On the inside of the solarium under each rafter there are two rows of inserts
with threads, and one crossbeam in two pieces. Start the upper row with a Jj-3
at either end and Kk-3 between panels, screwing them in place with Ff- 3. Use
Ff-3 screws for the lower row Ll-3 at the 2 ends and Mm-3 between panels.
Lastly, Assemble Jj-3 and Kk -3 , screwing them in place with Ff-3 . Make sure
sc rews are manually tight.
STEP #12
DOOR UNIT(S) MUST BE ASSEMBLED INSIDE OF SOLARIUM.
Slide upper door track F-3 into wheels of sliding door C-3. Slide lower door
track G-3 and make sure inserts are close enough to the frame to attach. Use
bolt Bb-3 to affix the plastic stopper H-3 on each end of top door rail F-3.
Use Oo-3 screws to affix upper door rail and cap Nn-3, at each end of top rail
door.
STEP #13
Lift up the door and track the inside of the solarium then set it over the
door opening by screwing at the top. First use bolts (Ww) and washers (Gg-3)
on the inside and female bolts (Cc-3-2) on the outside for the top assembly.
See diagram below. Attach lower track with bolts (Cc-3) and washers (Gg-3).
Set up door latch on the side required for your door to lock, adjust latch as
required.
STEP #14
Anchor the solarium to the deck or floor securely using screws and shields
supplied. See diagram below.
SPECIAL NOTES
To remove a screen, remove the two (2) screws at the top of the frame then
pull sideways to the opposite end of the handles to remove. To remove wind
panels, push or pull to one side, making sure that locking pin is not locked
then remove panels gently, panels are easy to remove.
NOTE : This unit is not waterproof. For best protection against rain,
close the windows of each frame with the outside window in the center, and the
inside window at the top.
CLEANING INSTRUCTIONS
Use only mild or warm soapy water, and no strong or abrasive cleaning products. Be sure to remove heavy snow and/or ice.
WARNING:
- Do not use a BBQ or any other flammable product inside the solarium.
- Remove snow from the roof.
PARTS DESCRIPTION
SOLARIUM W1209 1/2
DIMENSION
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>