Boost Crank 750MM Height Adjustable Corner Workstation Instruction Manual
- August 31, 2024
- Boost Crank
Table of Contents
Boost Crank 750MM Height Adjustable Corner Workstation Instruction Manual
Component parts
NO. | Component Name | PCS |
---|---|---|
1 | Hand bolts M6x10 | 4 |
2 | Leveling pads | 2 |
3 | Table feet | 1 |
4 | Lifting column | 1 |
5 | Bolt: M6x12 | 6 |
6 | Screw:ST4x16 | 8 |
7 | Side brackets | 1 |
8 | Rubber pad | 8 |
9 | Top frame-1 | 1 |
10 | transmit | 1 |
--- | --- | --- |
11 | Centre bracket | 2 |
12 | Top frame-2 | 1 |
Assembly Instructions
Step 1
Loosen the pre-installed bolts and Adjust the length of the top frame to match
the size of the table top.
Step 2
Inset the lifting column to the top frame.
- First fix 2pcs screws M6x12 like C displayed
- And then tighten the pre-installed bolts like B displayed
Step 3
- Install the table feet with 4 PCS M6X16 bolts
- Install the leveling feet
Step 4
Connect the return frame to the single workstation
Step 5
Connect the return frame to the single workstation and fixed with 2 hand
bolts.
Adjust the side bracket to align the return frame and fix it with 2 PCS M6x12
Bolts Insert the hex steel rod to the single workstation and tighten it
Step 6
Fix the desk frame to the tabletop with 17 PCS ST4X16 screws Fix the manual
crank holder with 2 PCS ST4X16 screws
Add-On : Cable tray installation
Step 1
- Fix the cable tray to the cable tray arms with 8 pcs M6x10 screws.
Step 1
- Install the U brackets to the desk frame with 4 pcs M8x10 screws.
- Mount the cable tray to the desk frame and fix it with 6 pcs M6x10 screws
Add On : Screen panel installation
Step 1
- Insert the tapped plates to the screen panel
Step 2
- Install the brackets to the panel with 8 pcs M5x6 screws.
Step 3
- Fix the panel to the desk frame with 10 pcs M6x10 screws
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>