THERMORY Nº55 Barrel Sauna DIY Kit Installation Guide
- August 29, 2024
- THERMORY
Table of Contents
- Nº55 Barrel Sauna DIY Kit
- Specifications
- Product Usage Instructions
- Step Zero: Preparing the Site
- Step One: Setting Up the Support Cradles
- Step Two: Assembling the Body Staves
- Step Three: Installing Front and Rear Panels
- Step Four: Attaching Side Panels
- Q: How many people can the sauna accommodate?
- Q: What are the ideal dimensions for the sauna installation
Nº55 Barrel Sauna DIY Kit
“`html
Specifications
- Designed for up to two people
- Dimensions: 6′ x 7′ x 7′
Product Usage Instructions
Step Zero: Preparing the Site
Before you begin, ensure the sauna will fit in your chosen
location. The ideal space should have dimensions of 6′ x 7′ x 7′.
Make sure the site is level and free of standing water after
rainfall. Use concrete, pavers, or crushed stone for the
foundation.
Step One: Setting Up the Support Cradles
1. Measure support cradles (A) diagonally from corner to corner
to ensure they are square.
2. Place the support cradles on a level site and make sure they
are stable.
3. Position the center stave (B) on wooden dowels in the outer
support cradles (A) and secure with screws (N).
Step Two: Assembling the Body Staves
1. Place six sauna body staves (C) on each side of the center
stave (B) and secure with screws (N).
2. Ensure the panel groove on each body stave aligns
correctly.
Step Three: Installing Front and Rear Panels
1. Fit the front panel with sauna doors (F2) and rear panel (E2)
into the grooves.
2. Center, level, and seat each panel into the floor panel.
3. Temporarily place body staves on top to bind the panels
together.
Step Four: Attaching Side Panels
1. Attach two front side panels (F, F1) to the front panel (F2)
and two back side panels (E, E1) to the rear panel (E2) using
screws (M) and stainless steel screws (N1).
2. Ensure bench supports face the interior of the sauna.
Frequently Asked Questions
Q: How many people can the sauna accommodate?
A: The sauna is designed for up to two people.
Q: What are the ideal dimensions for the sauna installation
site?
A: The recommended dimensions for the site are 6′ x 7′ x 7′.
“`
BARRELS
Installation guide
Barrel Nº55
Installation Guide
Barrel Nº55
The Wait Is Over.
Everything you need to build your very own Thermory Barrel Sauna is right
there in front of you. If it looks like a lot, it is. If it seems too
complicated to assemble, it isn’t.
These instructions are specifically wri en to guide you through each step with
ease. And if you need additional encouragement, you can scan the code on the
back of this guide to see how it’s done.
We truly appreciate the opportunity to share our love of sauna culture with you. And if there’s anything we can do to make your sauna experience be er, please don’t hesitate to let us know. If not, just relax and enjoy.
The Thermory Barrel Sauna No55 is designed for up to two people. That’s plenty of room for you and the friends helping you put this together. But if you want to enjoy the first steam all by yourself, we understand.
© THERMORY 2022
BARRELS
Installation guide Barrel Nº55
PARTS 1
CRADLES
x2
A
CENTER STAVE
x1
B
BODY STAVES
x70 (+2 reserve)
C
FINAL H TYPE x2
TOP STAVE
H
FRONT x1
PANEL
F2 REAR
x1
PANEL
E2
LEFT PANEL x1
SECTION
F
LEFT PANEL x1
SECTION
E
FRONT
BACK
RIGHT
x1
PANEL
SECTION
FRONT
F1 RIGHT
x1
PANEL
SECTION
BACK
E1
ASPEN x1
ROOF
BOARD
O
FLOORING
x2
DUCKBOARD
L
INTERIOR BENCHES
x2
J
BENCH
x2
SUPPORTING
J1
BACKREST
STAVES
x6
J2
METAL
x2
BANDS
I
LEGS
ADHESIVE
x1
ROOF TAPE
R
WATERPROOF x1
ROOF COVER
Z
WOODEN SLAT x2
FOR ROOF
Z1
COVER
BARRELS
Installation guide Barrel Nº55
PARTS 2
SCREW 5.0X120 x10
M
SCREW x160
4.2X70
N
STAINLESS x18
STEEL SCREW
4.2X70
N1 SCREW 4.0X50
x35
P
STAINLESS
x25 P1 Ø BOLT x2
STEEL SCREW
16X140
4.0X50
HEX NUT
x2
M16 SW24
FLAT
x4
U
WASHER
DECORATIVE ROOF NISHING BOARDS
x10
W 3 People
6´
x2
Recommended
TOOLS
x2
x2
x3
REQUIRED
STEP ZERO
Rubber
Before you begin, be sure the sauna will fit in your chosen location.
Approximately L x W x H of 6′ x 7′ x 7′ is ideal. Overall dimensions are shown
here.
Be sure the site is level and free of standing water a er rainfall.
Concrete, pavers or crushed stone is preferred.
x2
x2
x2
24mm
L= 4´9´´
x3
H= 6´5.5´´
W= 6´3´´
BARRELS
Installation guide Barrel Nº55
STEP ONE
Measure support cradles (A) diagonally from corner to corner. Measurements “a”
and “b” should be equal to ensure the cradles are square. Be sure cradles
remain level.
STEP TWO
Place the support cradles (A) on level site. Carefully level for be er
stability.
Place the center stave (B) on wooden dowels embedded in outer support cradles
(A).
Fix center stave (B) to cradles with screws 4.2 x 70 (N).
N Front
STEP THREE
Place 6 sauna body staves (C) to each side of the center stave (B) and fix
with screws 4.2 x 70 (N).
Be sure to align the panel groove on every next body stave.
B A
N
C x6 pcs B
C x6 pcs
Back
BARRELS
Installation guide Barrel Nº55
STEP FOUR
Place front panel with sauna doors (F2) and rear panel (E2) into the trimmed grooves. Be sure each panel is centered, leveled, and completely seated into the floor panel.
Bind these panels together by
temporarily placing one or two
E2
body stave (C) on top of them.
C F2
STEP FIVE
Two front side panels (F, F1)
a ach to the front panel (F2) and two
back side panels (E, E1)
a ach to the rear panel (E2)
by 4 screws 5.0 x 120 (M) and
M
4 stainless steel screws 4.20 x 70 (N1).
Be sure the bench supports face the interior of the sauna.
Confirm that the combined width
of the rear wall (E, E2, E1)
matches the combined width of
E
the front wall (F, F2, F1).
M E1
M
N1
M F1
N1 M
F
M N1
M
N1 M
BARRELS
Installation guide Barrel Nº55
STEP SIX
Continue placing body staves (C) tightly on both sides of the sauna using rubber mallet, while fixing body staves on the front panel with 4.2 x 70 screws.
To finish the roof top joint, use top stave (H).
C
Vent
H
C
N
STEP SEVEN
Install steel bands (I) by wrapping bands around barrel prior to connecting
with bolts and nuts (U).
Place steel bands evenly around barrel, covering screw heads.
Measure from steel band to barrel edge to ensure the steel band is even.
Cover roof with roof tape. Rub and smooth with pressure to ensure adhesion.
Install interior aspen roof trim (O) with 4.0 x 50 (P1) stainless steel
screws.
Roof tape
R I
O P1
U Aspen roof board
3-15/16´´ I
U
BARRELS
Installation guide Barrel Nº55
STEP EIGHT
A ach bench supporting leg (J1) to the bench (J), install two sauna benches on wall mounts using stainless steel screws 4.2 x 70 (N1).
Hold the seat and leg assembly tight to the sauna wall. Using a level, make sure the bench seat is level from front to back. This will ensure proper placement.
Install backrests (J2) at your chosen
height using stainless steel screw
4.0 x 50 (P1).
J2
P1
STEP NINE
J J1
N1 N1
N1
N1
Flooring duckboards (L) can be used for wiring runs, confirm specific wiring runs needed for chosen stove.
J2 J J1
L
BARRELS
STEP TEN
Place waterproof roof cover (Z) and fix it with wooden slat (Z1) and screws
4.0 x 50 (P). Install front and rear decorative roof finishing boards (W),
fixing by screws 4.0 x 50 (P).
WATCH THE VIDEO
Installation guide Barrel Nº55
W P P
SEE HOW ASSEMBLY WILL LOOK HERE.
Z W
Z1 P
Thermory USA – Denver 537 W. Highlands Ranch Pkwy, Ste. 114 Highlands Ranch,
CO 80129 720.759.7268 support@thermoryusa.com
Thermory USA – Bu alo 56 Harvester Ave, Ste. 1-201 Batavia, NY 14020
585.591.6590 support@thermoryusa.com
SaunaByThermory.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>