GAGGLA MILANO Concetto EVO Duo Super Automatic Espresso Machine Instructions
- August 27, 2024
- GAGGLA MILANO
Table of Contents
CONCETTO EVO
INSTALLATION SITE
PREPARATION CHECKLIST
GENERAL MACHINE ENVIRONMENT
The installation area is clean and clear of dust and tools. It is not
located in an active construction zone.
The counter accommodates the machine size and weight:
• Dimensions: 16.2” (W) x 28.4” (H) x 21.5’’ (D)
• Dimensions with NSF/ANSI 4 legs: 16.2” (W) x 31.3” (H) x 21.5’’ (D)
• Weight: 130 lb
An access hole has been pre-drilled in the counter for drainage and power in
accordance with model installation template.
Hole in counter is fitted with a collar to protect electrical cord, water
line & drain tube.
Machine can safely be installed with a minimum clearance of 3 3/16” from the
back wall.
ELECTRICAL REQUIREMENTS
The electrical configuration must match the Concetto Evo Site Preparation Checklist’s electrical requirements, prior to request the installation of the coffee machine. To do so, we recommend that you consult a qualified professional electrician.
Concetto EVO Specifications| Single-phase, 208 V, 60 Hz, 3250 W 3-prong, male
NEMA 6-20P power cord plug
---|---
Power outlet receptacle is NEMA 6-20R.
Dedicated electrical circuit meets the Concetto Evo power requirements.
No extension cord or power strip on the circuit.
WATER SPECIFICATIONS
The water configuration must match the Concetto Evo Site Preparation Checklist’s water specifications, prior to request the installation of the coffee machine. To do so, we recommend that you consult a water filtration system specialist.
Pressure & Hardness
Pressure is between 44 PSI and 116.03 PSI.
pH ranges between 6.5 and 7.5.
Hardness (TDS) is between 89 PPM and 142 PPM.
Machine water line is equipped with softness/filtration system and descaling
device.
Water Network
The water network provides cold, drinkable tap water.
Dedicated 3/8” diameter water line.
Shutoff valve with a 3/8” compression fitting on machine’s end.
HIGHLY RECOMMENDED: Connection to a floor drain in accordance with local
health code.
CONCETTO EVO
INSTALLATION SITE
COMPLIANCE DECLARATION
SITE INFORMATION
Adress:……………………
Business name:……………………….
Contact ………………..phone number:…………..
Contact name:………………………Contact email:…………
UNIT INFORMATION
Machine Model:………………………
Serial Number: If available……………………..
I hereby confirm that:
(initiales) I received and carefully read the Site Preparation Check-List that
matches the model we are installing
(initiales) The installation site is compliant with all the requirements
listed in the Site Preparation Check-List I received
(initiales) The installation can now be scheduled with our service provider
(initiales) We will have on site all the products required to fill and test
the unit when the installation technician will arrive at installation site
Agreement
By signing and sending this form properly completed to Evoca North America at
technical.na@evocagroup.com
I agree to the following terms.
I send this form completed as a confirmation that the installation site is
compliant with the requirements of the model listed above. This is the
official request to schedule the installation.
I acknowledge that my company will be charged if the installation site is not
compliant with all the Site Preparation Check-List requirements and a second
installation appointment is needed.
I acknowledge that Evoca North America does not recommend a specific water
filtration system.
An installer will contact you after this form is received properly completed.
Signature:………
Date:…………….
Title:…………….
Evoca North America
2355, avenue Dalton, Québec (Québec) G1P 3S3, Canada
T: 800-561-6162 – F:
800-463-2739
www.evocagroupna.com
Evoca Group Headquarters
Via Roma, 24, 24030 Valbrembo BG Italy
T: +39 035606111 – F: +39 095606560
www.evocagroup.com
Concetto Evo | 2024-06
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>