The Home Depot H Shape Barn Door Installation Guide
- August 11, 2024
- THE HOME DEPOT
Table of Contents
H Shape Barn Door
“`html
Specifications:
- Product Name: H Shape Barn Door
- Material: Wood
- Available Sizes: Various sizes from 14 inches to 60 inches
- Hardware Included: Top Rail, Bottom Rail, Middle Rail, Side
Slats, Carriage Bolts, Plastic Caps, Hex Key
Product Usage Instructions:
Installation Steps:
-
On a flat, clean surface, lay out one side stile (A1) with the
groove facing to the right. Assemble top rail (B1), middle rail
(B3), and bottom rail (B2) to A1 by fitting the tongue into the
groove of A1. -
Assemble the left side slat (C1) with the groove facing right.
Lay all middle slats (C2) next to C1 with the groove facing right.
Lay the right side slat (C3) to the right of the last C2 with the
tongue facing left. -
Place the right side stile (A2) beside the assembled slats and
rails with groove facing left. Slide to the left to cover the top
and bottom rail tongues and the edge of the slat assembly. Insert
carriage bolts into holes on the right side of A2, use hey key to
fasten carriage bolts to the pre-installed anchors in B1, B3, and
B2. -
Insert plastic cap (F) into holes on the side of side stile (A)
to complete the installation.
FAQ:
What Is Tongue and Groove?
Tongue refers to the extending ridge beyond the main portion of
the slat or stile. Groove refers to the slot cut into the other
side of the slat or stile.
“`
H Shape Barn Door Installation Instructions
CODE
PARTS
QTY
B1
A1/A2
Side Stile
1
B1
Top Rail
1
B2
Bottom Rail
1
A1 C1
C2 C2 C2
A2 C3
B3
Middle Rail
1
C1
Left Side Slat
2
Middle Slats
C2
(Quantity depends on door’s width refer to
next page Asterisk column)
C3
Right Side Slat
2
B3
C1
C2 C2 C2 C3
E
3.93″Carriage Bolts 10
F
Plastic CAP
10
B2
G
Hex Key
1E
F
G
TIPSContact and Ask us anything! Email us at help@bestbarndoor.com We offer several sizes of boards, Let’s look at them from different perspectives
B1 TOP RAIL FRONT VIEW AND PROFILE
C1 Left Side Slat
B3 MIDDLE RAIL FRONT VIEW AND PROFILE
PROFILE
C2 Middle Slats
SIDE VIEW FRONT VIEW
A
B2 BOTTOM RAIL FRONT VIEW AND PROFILE
B
1
C3 Right Side Slat
C
Number of Parts in Different Door Sizes
Door
A
Width Shape Side
(inch)
Stile
14
H
2
16
2
18
2
20
2
21
2
22
2
24
2
26
2
28
2
30
2
32
2
34
2
36
2
38
2
40
2
42
2
44
2
46
2
48
2
50
2
52
2
54
2
56
2
58
2
60
H
2
B1
B2 B3
C1 C2 C3
E
FG
Top
Bottom Middle Left Side Middle Right Side 3.93″Carriage Plastic Hex
Rail
Rail
Rail
Slat
Slats
Slat
Bolts
CAP
Key
1
1
1
2
0
2
10
10
1
1
1
1
2
0
2
10
10
1
1
1
1
2
2
2
10
10
1
1
1
1
2
2
2
10
10
1
1
1
1
2
4
2
10
10
1
1
1
1
2
4
2
10
10
1
1
1
1
2
4
2
10
10
1
1
1
1
2
6
2
10
10
1
1
1
1
2
6
2
10
10
1
1
1
1
2
4
2
10
10
1
1
1
1
2
4
2
10
10
1
1
1
1
2
6
2
10
10
1
1
1
1
2
6
2
10
10
1
1
1
1
2
6
2
10
10
1
1
1
1
2
8
2
10
10
1
1
1
1
2
8
2
10
10
1
1
1
1
2
8
2
10
10
1
1
1
1
2
10
2
10
10
1
1
1
1
2
10
2
10
10
1
1
1
1
2
10
2
10
10
1
1
1
1
2
12
2
10
10
1
1
1
1
2
12
2
10
10
1
1
1
1
2
12
2
10
10
1
1
1
1
2
14
2
10
10
1
1
1
1
2
14
2
10
10
1
What Is Tongue and Groove?
Tongue
Groove
Tongue refers to the extending ridge beyond the main portion of the slat or
stile. Groove refers to the slot cut into the other side of the slat or stile.
Installation Steps:
The following installation steps take a door with a width of 36” as an
example. Please refer to the [Number of Parts in Different Door Sizes] for
doors of different sizes
1. On a flat, clean surface, lay out one side stile (A1) with the groove
facing to the right.
Assemble top rail (B1) , middle rail (B3) and bottom rail (B2) to A1 by
fitting the tongue into the groove of A1.
B1 B1
A1
B3 B3
B2 B2
2
2. Assemble the left side slat (C1) with the groove facing right.
Lay all middle slats (C2) next to C1 with the groove facing right. Lay the
right side slat (C3) to the right of the last C2 with the tongue facing left.
B1
A1
A2
C1 C2 C2 C2 C3
B3 C1 C2 C2 C2 C3
B2
3. Place the right side stile (A2) beside the assembled slats and rails with
groove facing left.
Slide to the left to cover the top and bottom rail tongues and the edge of the
slat assembly. Insert carriage bolts into holes on the right side of A2, use
hey key to fasten carriage bolts to the pre-installed anchors in B1,B3 and B2.
B1
A1
A2
C1 C2 C2 C2 C3
B3 C1 C2 C2 C2 C3
B2
3
4. Insert plastic cap (F) into holes on the side of side stile (A) to
complete the installation. F F
4
Barn Door hardware installation
Product Content
1.1, Rail
4.1, 2 x Door Stopper
2.1, 2 x Hanger
4.2, T-Shape Floor Guide
2.2, 4 x Door Screw 3.1, Wall Spacer
4.3, Roller Floor Guide 4.4, 2 x Rubber End
3.2, Anchor (For concrete wall)
3.3, Lag Bolt (For wood stud)
5.1, 1 x Handle and Pull
Tools Needed
1, Pencil
5, Level
2, Wrench
6, Drill
3, Phillips Screwdriver 4, Plumb Bob
7, Drill Bit Ø / ”
Ø/ ”
8, Tape
NOTICE Please retain these instructions for future reference.
· Do not stand on or use any part of this item as a step ladder. · Firmly
secure all bolts, screws, and knobs before use. · Reconfirm that all bolts,
screws, and knobs are secure every 90 days. · Fasten screws loosely during
initial assembly. Do not firmly tighten the screws until the item is
completely assembled. · Do not use or store this item in the proximity of open
flame or flammable/combustible chemicals. · Be aware that some parts are heavy
and have sharp edges. · If any parts are missing, broken, damaged, or worn,
stop using this item until repairs are made and/or factory replacement parts
are installed. · Do not use this item in a way inconsistent with the
manufacturer’s instructions as this could void the product warranty.
5
Number of Parts in Different Track Sizes
Door Size (inch)
14
Track Sizes 4FT
16
4FT
18
4FT
20
4FT
21
4FT
22
4FT
24
4FT
26
5FT
28
5FT
30
5FT
32
6FT
34
6FT
36
6.6FT
38
6.6FT
40
7FT
42
7FT
44
8FT
46
8FT
48
8FT
50
9FT
52
9FT
54
9FT
56
10FT
58
10FT
60
10FT
M10x55mm Screw 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Ø10mm Anchor
3 3 3 3 3 3 3 4 4 4 5 5 5 5 5 5 6 6 6 7 7 7 8 8 8
Wall Spacer
3 3 3 3 3 3 3 4 4 4 5 5 5 5 5 5 6 6 6 7 7 7 8 8 8
M8x90mm Screw 3 3 3 3 3 3 3 4 4 4 5 5 5 5 5 5 6 6 6 7 7 7 8 8 8
Rail
Connector
1
—
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
1
2
1
2
2
2
2
1
2
1
2
1
Measurements
ceiling
A
G
16″ 16″ 16″ 16″
B C
1/ ”
H
H+1 / ”
1/ ”
E
F
3/ ”
D /”
A Overall Rail length is 4ft/5ft/6ft/6.6ft/7ft/8ft/9ft/10ft.
B The gap between each pre-drilled hole is 16″.
C Distance from door top side to holes on the wall is 1 / “..
D Distance from the bottom of the door to the floor is 3/8”. E Door height is
H. F The height of holes on the wall is H+1 / “. G Minimum distance from the
rail hole to the ceiling is 6″(J shape).
Installation Steps:
The following installation steps take a 6.6 ft track as an example. Please
refer to the [Number of Parts in Different Track Sizes] for the quantity of
accessories for different sizes of tracks
Instructions
It is very important to determine whether you will be installing a Header
Board prior to installing the track. Due to many overlapping factors such as
the location of wall studs (Our rail come with pre-drilled holes every 16″ on
center), the weight of a barn door and the various types of trim used in
homes, we recommend using a Header Board in all situations. Please install a
1″ x 4″ or 1″ x 6″ Header Board above the door opening directly into studs.
Header Board must be solid wood and measure at least the full length of the
track or longer
A
A
H+1 / ”
- Header Board and Lag Bolts for installing Header Board are not included in kit.
6
Step-1
Place the rail against the wall, and use a pencil to mark where the holes
should be. Make sure the height of holes on the wall is H+1 / “.
Level can make the rail horizontal.
Please choose the installation method for the track based on the type of your
track accessories.
One-Piece Track
Connector connection method
Wedge embedded connection method
Step-2
We provide 2 kinds of screws for you to install rail onto concrete wall or drywall.
A Concrete wall Installation.
Install the anchor to holes on the concrete wall first, then install lag bolt
to anchor.
B Drywall Installation.
Install the lag bolt to wood stud or head board directly.
2″ Ø/”
2/ ” Ø/ ”
7
Step-3
Insert door stoppers into rail. Install door stoppers between A-B and C-D Door stopper is used to prevent the hangers coming out of the rail.
AB
CD
Do not screw it in place at this stage
Step-4
Install the hangers onto the door according to the measurement in the pictures
below.
Maximum door thickness is 1 / “.. If your door’s thickness is less than 1 / “,
please add some bolt washers or cut the long door
bolts to a suitable length to fit the door. Install the hangers onto the door
according to the measurement in the pictures below
1/ ” 3/ ”
Step-5
The rubber ends are used to protect the door from touching the rail when
sliding the door. You need to drill holes on the door top side, please drill
the holes 1/2″ away from the edge of the door. Then install the rubber ends on
the door.
/”
8
Step-6
Hang the door over the rail.
Step-7
Turn the rubber ends approximately 180 degrees so that they are stuck between
the door and the rail.
9
Step-8
Adjust the 2 door stoppers to find a suitable position, Use the hex key to
screw the door stoppers in place.
Step-9
Install the barn door handle and pull. Put barn door handle on the door first
to fix a suitable position and make a mark, Use suitable drill bit to drill
holes on the door where the mark is, and then install the barn door handle and
pull according to the picture.
7/ ”
10
Step-10
We provide 2 kinds of floor guide for you. Floor guide is used to keep your
door stable and prevent the door bottom swinging back and forth when you slide
it open and closed.
1/”
1/”
a. T-shape floor guide (installed on the floor)use router or circular saw to create a kerf at bottom of the door, along the center to allow the tip of the T-shape floor guide to fit in between.
b. Roller floor guide (installed on to the wall), customize the distance according to the door thickness.
WARNING
· Failure to wear proper safety gear (i.e.,eye protection) may result in
serious injury or death. Always wear proper safety gear before using power
tools.
· Improper operation of power tools may result in loss of control, serious
injury or death. Always ensure you have complete control of the power tool and
the work area is free of hazards before operatiog a power tool.
· Lack of secure clamping of the door may result in unexpected movement of the
door,loss of power tool control and serious injury or death. Always securely
clamp the door in place before cutting,or drilling, the door.
· Lack of ,or improperly installed Anti-jump Disc may result in the door
coming off the track and cause serious injury or death. installation of Anti-
jump Disks are required for safe operation of this hardware. installed
properly, these discs will keep the door securely attached to the track.
CAUTION
· Mishandling of heavy objects (i.e.,doors) may cause a loss of balance and
serious injury. Always be sure you have a secure hold on the object and are
balanced before moving the object.Always wear safety shoes when lifting heavy
objects.
· Getting body parts (i.e., hair,fingers) caught in moving parts may cause
pinching and serious injury.Do not put fingers in parts that may move and
always remove or contain anything on your body that may become entangled with
a moving part.
· Closing sliding doors with your hand on the end of the door may result in
your hand, or fingers, getting caught between the door and other solid objects
(i.e., another door, molding) causing serious injury. Always use the door
handle to close doors.
Usage Statement:
Use of excessive force when opening, and closing,the door(s) may result in
damage to the hardware. Always hold the handle and gently open and close the
door(s).
11
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>