KKT KOLBE SPMS05 DYS Bracket Kit for 2 Modules Installation Guide

July 19, 2024
KKT KOLBE

KKT KOLBE SPMS05 DYS Bracket Kit for 2 Modules

KKT KOLBE Küchentechnik GmbH & Co. KG
Ohmstraße 17 | D-96175 Pettstadt | +49 (0) 9502 667930 | info@kolbe.de

Product Introduction

The main material of this mounting structure is aluminum alloy AL6005-T5. The surface of the product has been electrolyzed black. The product has strong corrosion resistance and is suitable for installation of residential projects and large-sized photovoltaic power plants. It has high pre-assembled characteristics and saves installation time and cost greatly. High-quality design elements and few kinds of accessories make it an efficient solution for PV engineering. Please kindly read the whole manual carefully before installation.

Installation Tools

Components

Installation Guide

Installation of L Profile-A
Install the L Profile-A vertically on the mounting holes on the back of the solar panel, ensure two L Profile-A are on same level, and lock the bolts M8*20.

Install another L Profile-A with knob bolt M8*25. There is no need to lock the bolt too tightly now.

Installation of L Profile-B
Install L Profile-B on L Profile-A with knob bolt M8*25 on suitable holes as per required tilt angle.

Lock all knob bolt M8*25.

Installation Notes

Safety Precautions
  1. The structure may cause harm to the body;
  2. The accessories of the structure may cause harm to the body;
  3. Pay attention to your head and eyes;
  4. In the working area, take careful of your action.
Stainless Steel Fasteners Notes

Because of its good ductility, stainless steel is essentially different from carbon steel; improper use will result in bolts and nuts can’t be turned off. Prevention of this situation is mainly in the following aspects:

  1. Reduction of friction coefficient:

    • Make sure the thread surface is clean, no ash, dirt, etc.
    • It is recommended to use wax or lubricant, such as butter and 40# oil, on the surface of bolts when installing.
  2. Correct operation:

    • When screwing, it must be perpendicular to the axis of the thread.
      Do not tilt.

    • In the tightening process, the force must be uniform, and the tightening torque should not exceed the specified safety torque value.

    • Use torque wrench or socket wrench as far as possible, avoid using movable wrench or electric wrench. If you need to use electric wrench, you should try to reduce the speed.

    • Avoid high-temperature use, do not use fast rotation, avoid rapid temperature rise and lead to lock.

Notes after Finishing Work
  1. After the work is completed, the small parts left on the site, such as bolts, conductive sheets, etc., should be retrieved to avoid the missing of small parts in the final installation.
  2. When the weather is bad or need to stop work for a long time, please tidy up the parts to prevent soil fouling or loss.