VEVOR SZBLJ01 Glass Railing Clamp Instruction Manual

July 10, 2024
VEVOR

VEVOR SZBLJ01 Glass Railing Clamp

Specifications:

  • Model: SZBLJ01/SZBLJ02/SZBLJ03
  • Applicable Glass Thickness: SZBLJ01: 10mm, SZBLJ02: 0.31-0.47 inches, SZBLJ03: 10mm
  • Color: SZBLJ01: Black, SZBLJ02: Silvery, SZBLJ03: Black

Product Usage Instructions

Installation Instructions:

  1. Draw the punching position:
    • Confirm the position of the railing clips through measurement and ensure alignment.
    • Draw punching positions for each railing, ensuring proper hole positions and line alignment.
  2. Punching holes:
    • Drill a hole with a diameter of 12mm and a depth greater than 80mm at the drawn position.
    • For different surfaces, use appropriate tools for drilling.
  3. Install expansion bolts and railing clips:
    • Knock the expansion bolt into the drilled hole, install the railing clip, and tighten it with a hex wrench.
  4. Install glass:
    • Insert the glass into the glass clamp groove gasket.
    • Ensure proper positioning and tighten the bolt using a hexagonal wrench.

FAQ

  • Q: Do I need to wear gloves when using the glass clamp?
    • A: Yes, it is recommended to wear gloves when using the product for safety.
  • Q: What should I do if the glass thickness is not within the specified range?
    • A: Ensure that the glass thickness falls within the applicable range mentioned for each model to ensure proper installation and functionality.

We continue to be committed to provide you tools with at a competitive price. “Save Half”, “Half Price” or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually saving half in comparison with the top major brands.

NEED HELP? CONTACT US!

Have product questions? Need technical support? Please feel free to contact us:

Technical Support and E-Warranty Certificate

This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won’t inform you again if there are any technology or software updates on our product

VEVOR-SZBLJ01-Glass-Railing-Clamp-FIG \(1\)

GLASS CLAMP: SZBLJ01/SZBLJ02/SZBLJ03 ****

Production Configuration

Model SZBLJ01 SZBLJ02 SZBLJ03
Quantity 10 10 4
Applicable glass thickness (in) 0.31-0.47
Color Black Silvery Black

Parts list

ITEM DESCRIPTION SZBLJ01 SZBLJ02 SZBLJ03
A Glass clamp 10 10 4
B Trim cover 10 10 4
C Hexagonal wrench 10 10 4
D Expansion bolt 40 40 16

Installation Instructions

  1. Draw the punching position
    Confirm the position of the railing clips through measurement, ensuring that each railing is aligned in a straight line. Draw the punching positions for each railing,VEVOR-SZBLJ01-Glass-Railing-Clamp-FIG
\(3\)

  2. Punching holes
    Drill a hole with a diameter of 12mm and a depth greater than 80mm in the drawn position (for cement floors, use an impact drill to drill holes, and for tile surfaces, first use a dedicated tile opener to drill holes and then use an impact drill to deepen the hole position).VEVOR-SZBLJ01-Glass-Railing-
Clamp-FIG \(4\)

  3. Install expansion bolts and railing clips
    Knock the expansion bolt into the drilled hole, remove the bolt, install the railing clip, install the bolt, and tighten it with a hex wrenchVEVOR-
SZBLJ01-Glass-Railing-Clamp-FIG \(5\)

  4. Install glass
    Insert the glass into the glass clamp groove gasket, which has been installed before the product leaves the factory. Before use, confirm whether the tightening bolt is on the same side as the embedded stainless-steel sheet in the gasket. After adjusting the position of the glass, use a hexagonal wrench to tighten the bolt and press the glass tightly.VEVOR-SZBLJ01-Glass-Railing-
Clamp-FIG \(6\) VEVOR-SZBLJ01-Glass-Railing-Clamp-FIG
\(7\)

GLASS CLAMP: YSBLJ01 ****

Production Configuration

Model YSBLJ01
Quantity 4
Applicable glass thickness (in) 0.31-0.47
Color Black

Parts list

ITEM DESCRIPTION YSBLJ01
A Hexagonal wrench 1
B Glass clamp (Divided into two

parts: B1 and B2)

| 4
C| Rubber pad (thickness:2mm)| 16
D| Rubber pad (thickness:3mm)| 16
E| Rubber pad (thickness:4mm)| 16

Installation InstructionsVEVOR-SZBLJ01-Glass-Railing-Clamp-FIG
\(10\)

As shown in the above figure, install in the order of B1-C/D/E-glass-C/D/E-B2-screw, with Rubber pad (C/D/E) selected for use according to different thicknesses of glass.

  • ITEM E: Rubber pad (thickness:4mm), Suitable for 8mm thick glass
  • ITEM D: Rubber pad (thickness:3mm), Suitable for 10mm thick glass
  • ITEM C: Rubber pad (thickness:2mm), Suitable for 12mm thick glass

GLASS CLAMP: YSBLJ02/YSBLJ03 ****

Production Configuration

Model YSBLJ02 YSBLJ03
Quantity 4 40
Applicable glass thickness (in) 0.31-0.47
Color Silvery Black

Parts list

ITEM DESCRIPTION YSBLJ02 YSBLJ03
A Glass clamp(Divided into two parts:

A1 and A2)

| 4| 40
B| Rubber pad (thickness:1mm)| 8| 80
---|---|---|---
C| Rubber pad (thickness:5mm)| 8| 80
D| Rubber pad (thickness:6mm)| 8| 80
E| Hexagonal wrench| 1| 1
F| Rubber sleeve| 4| 40
G| Pin| 4| 40

Illustrate

When using this glass clamp, the glass needs to be drilled in advance with a hole diameter greater than 8mm.

  1. Determine the installation position of the glass clip through measurement and fix the A1 part of the glass with screws.VEVOR-SZBLJ01-Glass-Railing-Clamp-FIG \(13\)
  2. Glass installation 8mm thick glass: Use B and D rubber pad. Install in the following order. A1-D-B- glass-F-G-B-D-A2- screwVEVOR-SZBLJ01-Glass-Railing-Clamp-FIG \(14\)

10mm thick glass: Use D rubber pad. Install in the following order. A1-D- glass-F-G-D-A2- screwVEVOR-SZBLJ01-Glass-Railing-Clamp-FIG
\(15\)

12mm thick glass: Use C rubber pad. Install in the following order. A1-C- glass-F-G-C-A2- screwVEVOR-SZBLJ01-Glass-Railing-Clamp-FIG
\(16\)

GLASS CLAMP: CZBLJ01 ****

Production Configuration

Model CZBLJ01
Quantity 10
Applicable glass thickness (in) 0.31-0.62
Color Silvery

Parts list

VEVOR-SZBLJ01-Glass-Railing-Clamp-FIG \(18\)

ITEM DESCRIPTION CZBLJ01
A Clamp block (thickness:30mm) 10
B Clamp block (thickness:10mm) 10
C Plastic sleeve 10
D Plastic mat 20
E Expansion bolt M10*80 10
F Screw (Length: 35mm) 10
G Screw (Length: 100mm) 10
H Hexagonal wrench 1

Installation Instructions

When using this glass clamp, the glass needs to be drilled in advance with a hole diameter greater than 12mm.

  1. Draw the punching position by measuring.
  2. Install screw G or expansion bolt E

Wood installation surface:

Drill a hole with a diameter of 8mm at the drawn position. Use a hex wrench to screw screw G into the drilled hole, leaving a length of L (The corresponding values for installing glass of different thicknesses are as follows) between the screw head and the installation surface.

  • For 8mm thick glass: L= 10-13mm
  • For 10mm thick glass: L= 10-15mm
  • For 12mm thick glass: L= 12-17mm
  • For 16mm thick glass: L=16-21mm

Cement wall installation:

Drill a hole with a diameter of 14mm on the drawn position using an impact drill (if it is a ceramic tile surface, first use a ceramic tile-specific hole opener to drill the hole, and then use an impact drill to deepen it). Knock the expansion bolt E into the hole, use a wrench to tighten the nut, then loosen and remove the nut and washer (nuts and washers are not required for installing glass). Leaving a length L(The corresponding values for installing glass of different thicknesses are as follows) between the screw head and the installation surface.

  • For 8mm thick glass: L= 10-13mm
  • For 10mm thick glass: L= 10-15mm
  • For 12mm thick glass: L= 12-17mm
  • For 16mm thick glass: L=16-21mm

Tighten B (Screw) onto F (Clamp block) using an Allen wrench.

Complete the installation in the following order, and finally use an Allen wrench to insert the small hole on the B cylindrical surface and tighten it. A-D-glass-C-D-F and BVEVOR-SZBLJ01-Glass-Railing-Clamp-FIG
\(22\)

GLASS CLAMP: BLLGZ01/BLLGZ02/BLLGZ03

Production Configuration

Model BLLGZ01 BLLGZ02 BLLGZ03
Quantity 1 1 1
Applicable glass thickness (in) 0.39-0.47
Color Black

Parts listVEVOR-SZBLJ01-Glass-Railing-Clamp-FIG
\(24\)  

ITEM

|

DESCRIPTION

| BLLGZ0 1| BLLGZ0 2| BLLGZ0 3
---|---|---|---|---
A| Sponge strip| 2| 2| 2
B| Railing column| 1| 1| 1
C| Support| 0| 0| 2
D| Bracket seat| 0| 0| 1
E| Hexagon socket bolt M6*12| 0| 0| 2
F| Trim cover| 1| 1| 1
`G| Expansion bolt| 4| 4| 4
---|---|---|---|---
H| Hexagonal wrench| 1| 1| 1
I| Hexagonal wrench| 1| 1| 1

Installation instructions

  1. Draw the punching position: Refer to SZBLJ01/SZBLJ02/SZBLJ03 railing clip installation method.

  2. Punching holes: Refer to SZBLJ01/SZBLJ02/SZBLJ03 railing clip. installation method

  3. Install expansion bolts and railing clips: Refer to SZBLJ01/SZBLJ02/SZBLJ03 railing clip installation method.

  4. Sponge Strip Installation Tear off the adhesive on the back of the sponge strip E and stick it in the groove of the railing column as shown in the picture. Leave a little longer sponge on the head, moisten the surface of the sponge strip with water, and install the glass from the top downwards.VEVOR-SZBLJ01-Glass-Railing-Clamp-FIG \(25\)

  5. Support Installation
    The support is installed according to the method shown in the diagram. The support comes with a flat support and a curved support, and users can choose to use it according to their needs.

  6. Handguard railing installation
    The handguard railing is welded and connected to G notification, and after welding, it is polished flat. The polished area is sprayed with anti-rust paintVEVOR-SZBLJ01-Glass-Railing-Clamp-FIG \(27\)

  • Manufacturer: Shanghaimuxinmuyeyouxiangongsi
  • Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
  • Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
  • Imported to the USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730

UK / REP

  • YH CONSULTING LIMITED.
  • C/O YH Consulting Limited Office 147,
  • Centurion House, London Road,
  • Staines-upon-Thames, Surrey, TW18 4AX

EC / REP

  • E-CrossStu GmbH
  • Mainzer Landstr.69,
  • 60329 Frankfurt am Main

Technical Support and E-Warranty Certificate www.vevor.com/support

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals