WVC2400 Micro Inverter User Manual
- June 3, 2024
- WVC
Table of Contents
WVC2400 Micro Inverter User Manual
IoT Monitoring Platform
Smart mobile “core” life
-
CO-2 induced environmental analysis Daily and total energy generation in kWh
-
Actual DC input voltage, current and power
-
Actual AC output voltage, current and power
-
Inverter temperature
-
Historical (daily, weekly, monthly) power curve
-
Power losses due to weather induced effects
-
Optional limitation of power output
-
Online switch for the inverter start stop
-
CO-2 induced environmental analysis 0
-
Daily and total energy generation in kWh
-
Actual DC input voltage, current and power
-
Actual AC output voltage, current and power
-
Inverter temperature ort
-
Optional limitation of power output
-
Online switch for the inverter start stop
-
Historical (daily, weekly, monthly) power curve
model | WVC-2400 |
---|---|
Recommend use panels | 4*750Watt |
Output voltage mode | 3.20/230V Auto switch |
PV Open circuit voltage | 30.S4VOC |
Operating voltage range | 22-60V |
Starting voltage range | 22-60V |
short-circuit current | 4*28A |
Maximum working current | 4*23A |
Output parameters | @120V |
Output peak power | 2600Watt |
Rated output power | 2400Watt |
Output current | 20A |
AC voltage range | 80-160VAC |
AC frequency range | 48-51Hz/58-61Hz |
Power factor | >95% |
Number of branch connections. | 2PCS ( Single ) |
(Output efficiency | @120V |
Static MPPT efficiency | 100.% |
Max output efficiency | 95% |
Loss of power at night | <0.5W |
Total current harmonics | <5% |
Appearance and Technical Features | |
Temperature range | -40°C to + 65°C |
( LxWxH ) ,Size | 170mmx300mmx41 6mm |
Net amount | 3.0kg |
Waterproof grade | Ip65 NEMA3R |
Heat dissipation mode | Self-Colling |
Communication mode | 433MH7 |
Power transmission mode | Reverse transmission load priority |
monitoring system | APP |
Electromagnetic Detection | EN61000-6-1:2007 EN6100-6-3:2007+A1:2011+AC:2012 |
Power Grid standard | EN50549-1, EN 50549-2, NBR 16149:2013, UL1741 |
Power grid detection | IEC/EN 62109-1, IEC/EN 62109-2, IEC 62116, IEEE 1547_, |
Certificate | CE , ETL , INMETRO , Patented technology |
Packing weight | |
Specifications | Each ( Packing ) |
height | 4.36 KG |
Size | 430x375x140mm |
Detailed
System Diagram
Description of the connector and cable core of the micro inverter
Note: You can purchase a professionally customized AC bus with a T-type connector. Use this AC bus as the AC bus for each branch. Connect it hand in hand to form a modular micro-inverter branch wiring system.
LED indicator function of micro inverter
- Red light keeps on: The equipment enters the preparatory working state;
- Red light flashes: The device enters the delayed start-up state;
- Blue light flashes quickly: MPPT maximum power point search status;
- Blue light keeps on: MPPT maximum power point locked state;
- Blue light turns to red light for a long time :
- Island protection;
- Frequency protection;
- Fault;
- Software shutdown;
- AC voltage over-voltage protection;
- DC voltage over-voltage protection;
Normal working indicator flashing process
Connect the micro-inverter correctly to the AC and DC terminals and then power
on: The red light keeps on for 3 seconds —> the red light flashes for 30
seconds —* the blue light flashes quickly (MPPT maximum power point search)
the blue light keeps on, (MPPT lock).
DOWNLOAD Cloud Intelligence APP
Please use the QR code to scan and install the “Cloud Intelligence” client
application, System version: Android 5.0, IOS 9 and above
Note:
- Connect the two communication antennas on the collector (Modem) as required;
- Place the collector in an appropriate location to ensure that the WIFI signal source can be received normally and Form a good communication distance with the inverter;
- The connected Wi-Fi network needs to be in 2.4G communication mode;
- Please reset the collector for the first use;
Reset Press and hold the reset button for more than 5 seconds, and Raday will go out and light up again after 5 seconds. Release the button at this time, and the device will complete the reset.
Add device
Open the intelligent monitoring software “Cloud Intelligence” APP to log in
Account, click the “+” icon in the upper right corner to start adding. If a
device has been created under the current account,(You can click on the device
icon below to enter the details page for query or operation)
Entry equipment
When the smart APP changes to the QR code scanning state, scan the QR code
label at the bottom of the Modem. At this time, the APP will automatically
collect the body code of the Modem, and automatically jump to the Wi-Fi
connection page, and enter the current Wi-Fi Click Next after the password;
Distribution network
Connect the Modem to the power supply as required, and quickly press the “Reset” button. When the “Reday” indicator turns from a long on state to a fast flashing state, the Modem will enter the network distribution state;
Initialization
After completing the network configuration of the modem, return to the phone
initialization device operation page, check the “I have completed the above
operations” below and click the “start connection” button, then the page will
jump to the signal search page and the Link on the modem The indicator light
will become a fast flashing state. When a WiFi signal is found, the indicator
light will flash slowly until the network configuration is completed, and the
indicator light will return to a steady state. The page jumps to the
completion page, please click “Finish”
Add inverter
When the initialization is completed, please click the “Settings” menu in the
upper right corner, find the inverter list item on the setting page, click the
“Edit” button, and fill in the 8-digit code on the inverter to complete the
inverter Add to. Remarks 1. When multiple inverters need to be added, the In
the English state, “,” comma separated and ended. Such as: 60001234, 6000E312,
2. Each Modem can monitor 60 inverters at the same time;3. A total of 2 lists,
each list can be filled with 30 inverter codes;
Smart APP can realize real-time data transmission with the cooperation of
Alibaba Cloud loT Through graphs and graphic displays in time, users can
understand the operation of the power station. The user can monitor the
operation and adjust the output power function of the system.
INTELLIGENT lot MONITORING MODEM
Number of data collectors per Modem Built-in WiFi loT data terminal Can be used on any smart device (Android/i0S)
- CO-2 induced environmental analysis
- Daily and total energy generation in kWh
- Actual DC input voltage, current and power
- Actual AC output voltage, current and power
- Inverter temperature
- Historical (daily, weekly, monthly) power curve
- Power losses due to weather induced effects
- Optional limitation of power output
- Online switch for the inverter start stop
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>