Phoenix Controls FHD500 Fume Hood Display Installation Guide
- June 25, 2024
- Phoenix Controls
Table of Contents
FHD500 Fume Hood Display
“`html
Product Information
Specifications:
-
Product Name: Fume Hood Display 500 Series (FHD500)
-
Mounting Hole Spacing: Standard US 3-1/4 in (82.75 mm) or
European 2-3/8 in (60.3 mm) -
Wire Support: 18 – 22 AWG (0.5 – 0.75 mm)
Product Usage Instructions
1. Electrical Box/Mounting:
The FHD500 and its components are designed to be installed
within standard size electrical gang boxes. Use suitable US model
electrical boxes like Raco 8670, Raco 8650, Raco 8663, or
equivalent.
2. FHD500 Base Plate and Display:
Mount the base plate to the electrical box using the specified
hole spacing. Pull wires through the hole in the base plate and
install them following the wiring instructions.
3. Mounting the FHD500:
Mount the FHD500 screen to the base plate at a slight angle,
ensuring proper alignment. Secure the monitor using a 5/64 allen or
hex key as per instructions provided.
4. Wiring:
Use 18 – 22 AWG wire for wiring the FHD500. Ensure compliance
with local electrical codes and ordinances.
FAQ
Q: What type of wire is recommended for wiring the FHD500?
A: The FHD500 supports 18 – 22 AWG wire. Solid core wire is
recommended for ease of installation, but not required.
Q: How should the FHD500 screen be mounted to the base
plate?
A: The FHD500 screen should be mounted from the bottom up at a
slight angle, ensuring proper alignment of all connections. Tighten
the screw on the bottom of the monitor using a 5/64 allen or hex
key.
“`
FUME HOOD DISPLAY 500 SERIES (FHD500) INSTALLATION GUIDE
GENERAL INSTALLATION INSTRUCTIONS
This document covers mounting and wiring for the Phoenix Controls Fume Hood
Display 500 Series (FHD500). This document assumes that you are an engineer,
technician, or service person trained to perform control system installations.
Before You Begin Unpack and inspect the package contents for damaged or
missing components. If contents are damaged, notify the appropriate carrier at
once and return any damaged components for immediate repair or replacement.
Included in the package are the following: · Fume Hood Display 500 Series
(FHD500) · Hardware bag containing two (2) Phillips Pan Head Screw #8 x 3/4
and wiring pin installation tool
Required Tools and Materials · Fume Hood Display 500 Series (FHD500)
· Two (2) Phillips Pan Head Screw #8 x 3/4 · Depending on what you order,
there could also be a Hub and retro/recess mount bracket with additional
hardware. · Suitable tools and fasteners for mounting the device and
accessories: · Two (2) Phillips screwdriver used to install and remove an
existing Fume Hood Monitor · Small flat-blade screwdriver used for making
wiring connections · Included wiring pin installation tool
Electrical Box/Mounting The FHD500 and its components are designed to be
installed within standard size electrical gang boxes. The FHD500 monitor
requires standard 3-1/4 in (82.75 mm) mounting hole spacing or standard
European 2-3/8 in (60.3 mm) mounting hole spacing. If utilizing an electrical
box, suitable US model electrical boxes are Raco 8670, Raco 8650, Raco 8663,
or equivalent.
FHD500 Base Plate and Display Using the supplied screws, mount the base plate
to the single gang electrical box using either the US 3-1/4 in (82.75 mm) hole
spacing or the European 2-3/8 in (60.3 mm) hole spacing. Pull the wires
through the hole in the base plate and leave enough slack to install the wires
in the terminals. Install the wires using the instructions in the wiring
section.
75 Discovery Way · Acton, MA 01720 · Tel 978-795-1285 · Fax 978-795-1111 ·
©2024 Phoenix Controls. Specifications subject to change without notice.
Rev.A 04/2024 651-000-014 ECN-00046798
www.phoenixcontrols.com FHD500 INSTALLATION GUIDE
MOUNTING THE FHD500
The FHD500 screen is mounted to the base plate from the bottom up and at a
slight angle, making sure that all interior connections are properly aligned.
Tighten the screw on the bottom of the FHD500 monitor to secure it to the base
plate. The screw uses a 5/64 allen or hex key. Use the following guidance: 1.
Hold the screen slightly tilted away from the base plate. Align the screw
hole, socket, and clip holes to their counterpart in the
base plate.
Note: Installers should be aware that they can crunch/break/damage the socket
connector if they are not careful with aligning the unit when they are
installing the wall plate.
2 FHD500 INSTALLATION GUIDE
651-000-014
ECN-00046798
©2024 Phoenix Controls. Specifications subject to change without notice. Rev.A
2. Lift the screen up slightly to maintain proper alignment, move the screen into position, up and over the base plate.
3. Gently, but firmly and evenly, press the upper corners of the screen to
snap the screen into the base plate to lock the screen into place.
4. While applying light inward pressure to the base of the screen to slightly
compress the gasket, tighten the bottom locking screw to a torque of 2 in-lbs
(.2 Nm) to secure and complete the mounting.
©2024 Phoenix Controls. Specifications subject to change without notice.
Rev.A 04/2024 651-000-014 ECN-00046798
FHD500 INSTALLATION GUIDE 3
Retrofit Mounting Installation For retrofit mounting of the FHD500, use the
following guidance: · Mount the FHD500 and bracket assembly to the fume hood:
1. Slide the U-Nut (included) over the existing mounting holes with the
spring side inward. 2. Slide the assembly into the cutout area. 3. Using the
mounting screws provided, attach the bracket to the fume hood. Note: The
following illustration is for
informational purposes only. Your faceplate might differ from the faceplate
that is displayed.
U-Nut
4 FHD500 INSTALLATION GUIDE
651-000-014
ECN-00046798
©2024 Phoenix Controls. Specifications subject to change without notice. Rev.A
Retrofit Mounting Options · RD1: Retrofit stainless surface plate to cover FHD1xx recess mounting holes · RM1: Retrofit stainless surface plate to cover FHMx00 and FHMx10 recess mounting holes
· RM3: Retrofit stainless surface plate to cover FHMx30 recess mounting holes
©2024 Phoenix Controls. Specifications subject to change without notice.
Rev.A 04/2024 651-000-014 ECN-00046798
FHD500 INSTALLATION GUIDE 5
WIRING
The FHD500 supports 18 – 22 AWG (0.5 – 0.75 mm) wire. Solid core wire is
recommended for ease of installation, but not required. Follow the wiring
details explained in this section.
Caution: All Wiring MUST comply with local electrical codes and ordinances.
FHD500 Monitor Wall Plate Note: There are several terminals on the FHD500 wall
plate that are not used for the FHD500 application.
FHD500 Terminal Layout and Usage
24 VAC
Power Terminal
UI01
Universal Input/Output
UI02
Universal Input/Output
UI1
Universal Input
UI2
Universal Input
DO Switch
Generic, Programmable
RS485+
BACnet MS/TP Communication Positive
RS485-
BACnet MS/TP Communications Negative
Board Identification
HOT
GND
1
GND
2
GND
3
GND
4
GND
DO Switch
BACnet Communications
Caution: Make sure that power is turned off or disconnected while you are wiring. Wiring a unit that is powered on might result in electrical shock and/or equipment damage.
6 FHD500 INSTALLATION GUIDE
651-000-014
ECN-00046798
©2024 Phoenix Controls. Specifications subject to change without notice. Rev.A
Terminal Strip Wiring 1. See the Wire strip length range on the wall plate for
directions on how much coating you should strip off the wires. 2. When wiring
the wall plate for the FHD500, use the supplied release tool or a paper clip
to install and remove wires (shown
below). This ensures that the wires are more easily seated in the terminals,
especially if you are using stranded wire.
3. While pressing down on the tool hole with the release tool, insert the
wire into the terminal hole. 4. Push the excess wire back through the wall
plate hole. 5. Check for loose or frayed wires that might cause an electrical
short.
©2024 Phoenix Controls. Specifications subject to change without notice.
Rev.A 04/2024 651-000-014 ECN-00046798
FHD500 INSTALLATION GUIDE 7
6. Use the following diagram to properly wire the FHD500:
TYPICAL FUME HOOD AND PERIPHERAL WIRING
7. Once wiring is terminated and verified, turn on the power to the transformer and verify that the FHD500 powers up correctly. 8. See the Fume Hood Display 500 Series (FHD500) User Guide (MKT-0512) for startup and commissioning procedures.
8 FHD500 INSTALLATION GUIDE
651-000-014
ECN-00046798
©2024 Phoenix Controls. Specifications subject to change without notice. Rev.A
TROUBLESHOOTING
Screen is black Communication not working
Audible alarm not working
· Check that power is properly connected to the FHD500. · Check that there is
24 VAC across the power wires. · Check that power wires are firmly pushed into
the base board of the FHD500.
· Check that the communication wiring is correct. · Polarity must be
maintained throughout the BACnet MS/TP Trunk. · There must be an End Of Line
(EOL) resistor installed at both ends of the MS/TP Trunk. This resistor must
be a 120 , 1/4 W resistor. · The MS/TP cabling must meet minimum requirements.
· Check the Communication configuration from FHD500 menu. · Ensure that MS/TP
communication is enabled. · Ensure that the chosen MAC address and Device ID
do not conflict with other devices on the network. · Ensure that the BAUD rate
matches the rest of the devices on the network.
· Check that the volume is turned up past 0% in the menu. · Check that someone
has not muted the alarm (if the alarm is muted, the alarm bell
contains a circle with a slash through the alarm bell).
©2024 Phoenix Controls. Specifications subject to change without notice.
Rev.A 04/2024 651-000-014 ECN-00046798
FHD500 INSTALLATION GUIDE 9
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>