ULINE H-7896 Wire Garment Rack Installation Guide
- June 7, 2024
- ULINE
Table of Contents
- ULINE H-7896 Wire Garment Rack Installation Guide
- **TOOL NEEDED
- PARTS
- INSTALLATION OF SELF-LEVELERS AND OPTIONAL CASTERS
- INSTRUCTIONS FOR UNIT ASSEMBLY
- INSTRUCTIONS FOR HANG BAR ASSEMBLY
- Read More About This Manual & Download PDF:
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
ULINE H-7896 Wire Garment Rack Installation Guide
**TOOL NEEDED
**
Phillips Screwdriver
PARTS
INSTALLATION OF SELF-LEVELERS AND OPTIONAL CASTERS
TO INSTALL SELF-LEVELERS
NOTE: If installing casters, do not install self-levelers
- Make sure post is positioned as
- Insert self-leveler into open end of post.
- Tap on ground until self-leveler slides into
- Repeat steps 2 and 3 for other posts.
TO INSTALL OPTIONAL CASTERS
- Make sure post is positioned as
- Engage the wheel brakes to keep casters from rolling during assembly. Use a rubber mallet to tap caster stems into posts.
INSTRUCTIONS FOR UNIT ASSEMBLY
-
Start with the lowest shelf. Snap the interlocking pieces of a shelf support (wide end down) around the post at the lowest groove where shelf is to be located. Slide the support up or down until it snaps onto the groove. Add a shelf support to the same place on the remaining posts.
NOTE: NSF requires food service applications to keep the lowest shelf at least 6″ above the floor. -
Slide post through underside of shelf until shelf slides firmly over supports.
-
Stand unit upright. Gently tap shelf down to secure it.
-
Determine the height of the next shelf, snap on supports then add and secure shelf. Repeat Step 4 to add the remaining shelves.
INSTRUCTIONS FOR HANG BAR ASSEMBLY
-
Attach one hanging hook to each end of the hanging bar using the lock washer and bolt.(See Figure 7)
-
Slide hooks over the wire shelving ledge and pull down to secure.. (See Figures 8 and 9)
Read More About This Manual & Download PDF:
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>