ULINE Industrial Curtain Walls User Guide

June 7, 2024
ULINE

INDUSTRIAL CURTAIN WALLS
H-4954, H-4955, H-6337
H-6338, H-6339
1-800-295-5510
uline.com

ULINE Industrial Curtain Walls -

TOOL NEEDED

ULINE Industrial Curtain Walls - tools need

PARTS

ULINE Industrial Curtain Walls - parts

GETTING STARTED

Before you begin, determine the method of mounting: ceiling, wall, or suspended
ULINE Industrial Curtain Walls - suspended mount

  1.  The Universal Mounting Brackets (with the Ceiling Support Connector attached) can be used for either wall mounting or suspended mounting. Suspended mounting requires a 3/8″ threaded rod (not included).
  2.  If you are ceiling mounting, use the Ceiling Support Connectors only.

IMPORTANT! While installing the hardware, add 3″ to the height stated on the curtain tag.

SINGLE TRACK
ULINE Industrial Curtain Walls - open

  1. Affix an End Stop to just one open end.

SPLICING MULTIPLE TRACKS TOGETHER

ULINE Industrial Curtain Walls - SPLICING MULTIPLE
TRACKS

  1. Turn two Allen screws one and a half turns onto each Straight Splice Connector.
  2. Insert the two tracks and tighten the screws. Repeat this process until all pieces of track are spliced together.
  3. Affix an End Stop to just one open end.
    ULINE Industrial Curtain Walls - Affix an End Stop

NOTE: Whether you are mounting a single piece of track or multiple pieces that you have spliced together, you should place the Universal Mounting Brackets approximately 6″ from each end and either side of a Straight Splice Connector.
ULINE Industrial Curtain Walls - Splice Connector. IMPORTANT! Attach the Universal Mounting Brackets to the solid material that complies with the 6″ measurement.

MOUNTING

CEILING MOUNT

NOTE: The ceiling surface must be flat and level with the floor.

  1. The height is pre-determined by your ceiling height.
    IMPORTANT! Make sure the ceiling height is at least 3″ higher than your curtain height.
    ULINE Industrial Curtain Walls - curtain height

  2. Place a mark on the ceiling where both ends of the track will fall (A).

  3. Connect those marks with a straight line (B).

  4. Place the Ceiling Support Connector (C) on the ceiling. Mark the two mounting holes. Remove the bracket, drill the two holes and screw the bracket to the ceiling.

WALL MOUNT

  1. On the bulkhead, place a mark 5″ higher than the height of your curtain on one side (A)
    ULINE Industrial Curtain Walls - WALL MOUNT

  2. From that point, stretch a line level to the opposite side and place a mark (B). That distance should be the length of your Straight  Track assembly. D

  3.  Connect the marks with a straight level line (C).

  4. Place each Universal Mounting Bracket on the wall so the top edge of the bracket is even with the line (D). Mark the two mounting holes. Remove the bracket, drill the two holes and screw the bracket to the wall.

SUSPEND MOUNT

  1.  Using this method, you will need beam clamps and threaded rods that are not included with your hardware.
    ULINE Industrial Curtain Walls - final mesurment

  2. Measure the distance from the bottom of the roof beam or truss (A). Subtract from that amount the height of the curtain plus 3″. The threaded rods should be 2″ longer than that final measurement.
    IMPORTANT! Ensure all threaded rod ends are level with one another.

  3. Place a nut 1″ up from the bottom of the threaded rod (B). Next, place a washer over the rod and Universal Mounting Bracket.  Then, place a washer and nut on the threaded rod. Tighten the assembly.

CURTAIN ASSEMBLY

INSERTING NYLON ROLLERS WITH HOOKS

ULINE Industrial Curtain Walls - final

  1. Place each roller into the open end of the track. The number of rollers must be equal to the number of grommets on the top edge of the curtain.

ATTACHING TRACK TO BRACKET/SUPPORT CONNECTOR

ULINE Industrial Curtain Walls - CONNECTOR

  1. First, remove the Track Holder Plate from each of the Ceiling Support Connectors.

  2.  Next, place the Straight Track (assembly) into the Ceiling Support Connector.
    ULINE Industrial Curtain Walls - CONNECTOR 2

  3. Finally, replace the Track Holder Plate to each of the Ceiling Support Connectors and tighten the locking nut so the track is secure.

HANGING THE CURTAIN

  1.  Place each curtain grommet over a roller hook (A).
    ULINE Industrial Curtain Walls - Place each

1-800-295-5510
uline.com

Documents / Resources

| ULINE Industrial Curtain Walls [pdf] User Guide
Industrial Curtain Walls, H-4954, H-4955, H-6337, H-6338, H-6339
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

ULINE User Manuals

Related Manuals