ULINE Slatwall Quarter Panels Installation Guide
- June 7, 2024
- ULINE
Table of Contents
ULINE Slatwall Quarter Panels Installation Guide
SAFETY INSTRUCTIONS
- ALWAYS wear safety glasses when using any power tool.
- ALWAYS use hearing protection when using loud equipment.
- DO NOT sit, climb, hang or step on shelves or brackets.
- DO NOT overload shelves or brackets
- DO NOT try to install slatwall panels yourself. Use 2 people.
- CAPACITY:
40 lbs. without metal inserts.
90 lbs. with metal inserts.
NOTE: Weight capacity will be slightly reduced for shelves deeper than 10″.
GENERAL INFORMATION
STACKING PANELS
To allow temperature and humidity to equalize, stack panels at least three-
high in work area. Do not stack directly on concrete floor.
SUGGESTED TOOLS
24″ level; tape measure; pencil; chalk line; circular saw; cordless or corded
drill with screwdriver attachment.
SUPPLIES
1½” to 2″ drywall screws or equivalent; panel adhesive; (optional) roundhead
screws for metal inserts. (Ensure that screw heads fit easily into grooves.)
METAL STUDS
Wood screws do not hold well in metal studs. Use wooden blocking whenever
necessary.
BLOCK OR CONCRETE WALLS
First mount vertical or horizontal furring strips on wall. Installing slatwall
directly on concrete or block walls is not recommended.
INSTALLATION
GENERAL
- Install over studs, plaster, furring strips or drywall. Panel adhesive recommended.
- Use drywall screws of proper length.
- Install screw in every other groove on each stud.
- Drive screws into grooves. Be careful not to damage edges of grooves.
STARTING OFF
Snap chalk line at desired height on wall. Mark location of studs on floor and
ceiling (for mounting panels later). To ensure clean installation on projects
requiring more than one panel, begin with a narrow panel first and finish with
full panel.
FIRST PANEL
Following manufacturer’s directions, spread adhesive vertically on back of
panel (half-tube of adhesive per panel). Raise first panel to chalk line and
install screw through top of groove into stud near one of upper corners.
REMAINING PANELS
Repeat process on bottom row of panels, ensuring that grooves and factory
edges line up from panel to panel. On installations without drywall (such as
garages), make sure end of each panel is centered in middle of stud.
CUTTING PANELS
When using circular saw, use a straight edge guide for saw to follow. Never
cut “freehand”. Always cut from front (finished side) of panel.
CUTTING PANELS WITH ALUMINUM INSERTS
It is not necessary to remove aluminum inserts from grooves when cutting
panels.
CLEAN UP
Remove any adhesive or marking on face of panels with a solvent such as
lacquer thinner. Clean panels with mild household cleaner and dry with soft
cloth.
INSTALLATION DIAGRAM
Contact us
References
- Uline.ca - Shipping Boxes, Shipping Supplies, Packaging Materials, Packing Supplies
- Uline.mx - Cajas para Envíos, Materiales de Empaque, Materiales de Empaque, Suministros para Empaque
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>