R-TEC AUTOMATION AriA 1 3 /8″ H-Rail Traverse Systems Installation Guide

June 7, 2024
R TEC AUTOMATION

R-TEC logo 2

ARIA®1 3/8″ R-TEC AUTOMATION® H-RAIL TRAVERSE CENTER DRAW SYSTEM INSTALLATION INSTRUCTIONS
Please read all instructions before starting

INTRODUCTION:

The AriA®1 3/8″ R-TEC Automation® H-Rail Traverse Systems are used to electronically control the drapery using a Slim Drapery Motor and Remote Control. By using a Remote Control or the R-TEC Automation® App via a smartphone or tablet, the operator can open and close the drapery smoothly and precisely.
The maximum width for this system is 12′ continuous (in select finishes) and 24′ spliced. The maximum drapery weight is 77 lbs.
BRACKET ASSEMBLY:R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
BRACKET

The AriA® 1 3/8″ R-TEC Automation® H-Rail Traverse Systems can be mounted on the wall or ceiling. Wall options include single brackets with either a 3 1/2″ or 6″ projection, or a double bracket with 3″ and 7 1/2″ projections. R-TEC
AUTOMATION AriA 1 3 H-Rail Traverse - BRACKET3Ceiling options include a single or double bracket with 2 3/8″ drop or a low-profile ceiling bracket with a 5/32″ drop.

PARTS LIST:

R-TEC AUTOMATION AriA 1 3 H-Rail Traverse - parts1| R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
parts2
---|---

Basic Components:

1. R-TEC Automation® H-Rail Track
2. Slim Drapery Motor
3. Drive Pulley
4. Return Pulley
5. Pendant
6. Brackets
7. Carriers| 8. Master Carrier Body & Arms
9. Drive Belt
10. Drive Belt Clip
11. AC Power Transformer power option
12. Li-ion Battery power option
13. Plain End Caps included; Antiquities Finials sold separately
---|---

CENTER DRAW BRACKET PLACEMENT:

It’s recommended to use 1 bracket beside each pulley and an adjacent bracket no more than 24″ away. On the remaining part of
the H-Rail Track, bracket-to-bracket distances should be no more than 48″. Also, 1 bracket should be placed on each side of a
splice is used.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
PLACEMENT

CENTER DRAW TRACK ASSEMBLY:

NOTE: System length does not include decorative additions such as finials. Additional measurement below is required for these options.
Step 1. Calculate R-TEC Automation® H-Rail Track Length.
Track Length no finials = System Length – 7 1/2″
Example: 72″ System Length – 7 1/2″ = 64 1/2″ Track LengthR-TEC AUTOMATION
AriA 1 3 H-Rail Traverse - Length

Overall Length with finials = System Length – 1 1/2″ + (Finial Length x 2)
Example: 72″ System Length – 1 1/2″ + (4 1/8″ x 2) = 78 3/4″ Overall Length with FinialsR-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length2

Step 2. Use a Track Splice if required for length.
The R-TEC Automation® H-Rail Track is available in a continuous length up to 12′ (select finishes), and can be spliced up to a maximum length of 24′.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length3 Step 3. Spray both sides of the H-Rail Track with silicone.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length5 Step 4. Install all attachment hardware.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length6 NOTE: The wall mount and cover are not installed at this time.
Step 5. Assemble the Drive Belt Clip to the Drive Belt and leave the cap off.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length7 Step 6. Assemble the Master Carrier Body to the Drive Belt Clip.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length8 Step 7. Pull the Master Carrier Body through the H-Rail Track.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length9 Step 8. Remove the Master Carrier Body and Drive Belt Clip.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length12 Step 9. Install the Drive Belt through the Drive Pulley, then install the Drive Belt to the Drive Belt Clip.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length14

Step 10. Attach half of the Master Carrier Body to the Drive Belt & Drive Belt ClipR-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length16 Step 11. Pull the Master Carrier Body through the R-TEC Track and assemble the Drive Pulley onto the H-Rail Track.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length11 Step 12. Align the Master Carrier Body half to the end of the Track. Cut Drive Belt to a length: 5″ from the end of the Track.

R-TEC AUTOMATION AriA 1 3 H-Rail Traverse - Length13 Step 13. Remove the Drive Pulley from the H-Rail Track.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length16 Step 14. Measure 5″ from the end of the Track. Make sure you hold this dimension as you proceed to the next step.

R-TEC AUTOMATION AriA 1 3 H-Rail Traverse - Length19 Step 15. Mark the Drive Belt tooth at the edge of the Track.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length20

Step 16. Install Drive Belt Clips on both sides of the marked Drive Belt tooth.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length22

Step 17. Calculate the number of Carriers per length of Track.
PINCH PLEAT

of PP Carriers per panel = (System Length / 2) / Spacing

Example: (72″ / 2) / 2″ = 18 Carriers per panelR-TEC AUTOMATION AriA 1 3
H-Rail Traverse - Length23 NOTE: Always round up to an even number
RIPPLEFOLD

of Ripplefold Carriers = ((System Length / 2) / Spacing) + 2

Fullness Spacing
60% 2 5/8″
80% 2 3/8″
100% 2 1/8″
120% 1 7/8″

Example: (72″ / 2) / 2 1/8″ = 16.94 Carriers 20 Carriers per Side (18 Carriers for Panel + 2 for Hardware)R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length24

Step 18. Install the Master Carrier Body and required number of Carriers into the H-Rail Track.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length21

RIPPLEFOLD:
Remove 1 Ripplefold Carrier from the end that’s closest to the Drive Pulley. Leave the cord as shown with the attachment tab
exposed.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
Length25 Install the attachment tab into the Master Carrier Body.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
fig1Install the Master Carrier Body and required number of Carriers into the H-Rail Track.R-TEC AUTOMATION AriA 1 3 H-Rail
Traverse - fig2

Install the Drive Pulley into the H-Rail Track and install the Pendant into the attachment tab.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
fig3

Step 19. Install the Pendant into the End Stop.

R-TEC AUTOMATION AriA 1 3 H-Rail Traverse - fig4

Step 20. Install the End Stop.![R-TEC AUTOMATION AriA 1 3 H-Rail Traverse

NOTE: Carriers can be added or removed with the Drive Pulley installed by removing the End Stop.
Step 21. Run Drive Belt through the Drive Pulley.R-TEC AUTOMATION AriA
1 3 H-Rail Traverse - fig6

Step 22. Install the Drive Belt Clip.R-TEC AUTOMATION AriA 1 3 H-Rail
Traverse - fig7

Step 23. Attach half of the Master Carrier Body to the Drive Belt Clip.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse - fig8

Step 24. Bring both Master Carrier Body halves together and insert the Master Carrier center metal clip.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
fig10

NOTE: The Master Carrier should move freely back and forth.R-TEC
AUTOMATION AriA 1 3 H-Rail Traverse - fig12

Step 25. Remove the Master Carrier center metal clip.R-TEC AUTOMATION
AriA 1 3 H-Rail Traverse - fig13

Step 26. Remove 1 Ripplefold Carrier from the end that’s closest to the Return Pulley. Leave the cord as shown with the attachment tab exposed.R-TEC
AUTOMATION AriA 1 3 H-Rail Traverse - fig16

Step 27: Install the attachment tab into the Master Carrier Body.R-TEC
AUTOMATION AriA 1 3 H-Rail Traverse - fig17

Step 28. Install the Master Carrier and Carriers into the Track.

R-TEC AUTOMATION AriA 1 3 H-Rail Traverse - fig18

Step 29. Bring both Master Carrier Body halves together and insert the Master Carrier center metal clip.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
fig21

Step 30. Install the Carriers, Return Pulley, End Stop, and Pendant into the Return Pulley.
PINCH PLEAT:R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
fig22 RIPPLEFOLD:R-TEC AUTOMATION AriA 1 3
H-Rail Traverse - fig23

Step 31. Install the Pendants and End Caps or Finials onto the Drive and Return Pulleys.
PINCH PLEAT:R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
fig25

RIPPLEFOLD:R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
fig26

Step 32. Install the Master Carrier Arms onto the Master Carrier Bodies.R-TEC AUTOMATION AriA 1 3 H-Rail Traverse -
fig28

How to get started using your AriA® 1 3/8″ R-TEC Automation® H-Rail Traverse System:

  • Please read all the instructions provided with your Slim Drapery Motor.
  • Your motor will be shipped in “sleep mode” and must be woken up before using.
  • You will need remote control or a smartphone to set up and control your Slim Drapery Motor.
  • Only use power options for your motor that are available through Rowley Company.

DOWNLOAD INSTRUCTIONS:https://qrs.ly/h5c6jr0

www.AriAMetalHardware.com
updated 04/30/2021

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

R TEC AUTOMATION User Manuals

Related Manuals