R-TEC AUTOMATION FINESTRA TRAVERSE SPLICE Installation Guide
- June 7, 2024
- R TEC AUTOMATION
Table of Contents
FINESTRA® WOOD R-TEC AUTOMATION®
TRAVERSE SPLICE ASSEMBLY INSTRUCTIONS
Please read all instructions before starting
INTRODUCTION:
Finestra® Wood R-TEC Automation® Traverse Systems are used to electronically
control the drapery using a Slim Drapery Motor and Remote Control. By using a
Remote Control or the R-TEC Automation® App via a smartphone or tablet, the
operator can open and close the drapery smoothly and precisely.
The maximum fascia and track width for this system is 36′ spliced. The max.
drapery weight is 110 lbs. There must be two additional brackets – one for
each side of the splice when used.
SPLICE ASSEMBLY:
Step 1. Carefully unbox your system, leaving all the packaging materials
in place. If a second person is available to help, it will make the re-
assemble process faster and easier.
NOTE: The system was packaged with foam, shrink wrap, and other packing
materials to ensure the belt, carriers, and other components stay in place
during shipment.
Step 2. Remove the packaging material from the Pulley that is not
attached to the Track. Ensure the Drive Belt stays in Track when removing the
packing material. If required, position the Drive Belt back in the Track.
Step 3. Remove the packaging
material from the Master Carrier Body half or Track Splice section. This order
will change based off your Track size. Ensure the Drive Belt stays in the
Track when removing the packing material. If required, position the Drive Belt
back in the Track.
Step 4. Remove the remaining
packaging material from the Track Splice sections and Carriers. Ensure the
Carriers stay in Track when removing the packing material. If required
position the Carriers back in the Track.
Ensure the Drive Belt stays in Track when removing the packing material. If
required, position the Drive Belt back in the Track.
Step 5. Bring the Track section
together by pushing the two sections together, while making sure that the
Carriers, Master Carrier Body, and Drive Belt stay in the Track.
NOTE: When pushing the Track
sections together, the Drive Belt slack needs to be removed by pulling the
Drive Belt section at the loose Pulley away the system.
Step 6. Install the last Track section by pushing the last two sections
together, while making sure that the Carriers, Master Carrier Body and Drive
Belt stay in the Track.
Tighten the 4 fasteners.
Step 7. Install the Return Pulley
by pushing the Master Carrier Body half into the Track. Place the Return
Pulley on the Track.
Bring both Master Carrier Body halves together and insert Master Carrier
center metal clip.
Step 8. Add the Master Carrier Arm
to Master Carrier Body.
Step 9. Your system is ready to be installed using these installation instructions:
NOTE: Carriers can be added or removed with the Drive Pulley installed.
DOWNLOAD INSTRUCTIONS:
www.FinestraWoodHardware.com | updated 05/13/2021
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>