CMP SPA Ozone + UV Sanitation Spa Solar Eclipse User Manual

June 6, 2024
CMP

CMP - logoDEL AOP® SPA
OZONE + UV SANITATION
INSTALLATION INSTRUCTIONS & PRODUCT MANUAL
SES-UP-TXX

CMP SPA Ozone UV Sanitation Spa Solar Eclipse

THE COMPLETE MODERN SPA®
C-M-P.COM/SPA-SANITIZERS
IMPORTANT SAFETY INFORMATION: READ AND FOLLOW ALL INSTRUCTIONS
Save these instructions. Leave manual with the homeowner after installation. Improper installation, adjustment, alteration, service, or lack of maintenance can cause injury or property damage. Read the installation, operating, & maintenance instructions thoroughly before installing or servicing this equipment.

IMPORTANT SAFETY INSTRUCTIONS

READ AND FOLLOW ALL INSTRUCTIONS
Read this manual completely before attempting installation. All permanent electrical connections should be made by a qualified electrician. Follow all applicable electrical codes. When installing the DEL AOP® Spa, basic precautions should always be followed:
DANGER
Be sure the electrical power is shut OFF at the main circuit breaker before installing the DEL AOP® Spa.
NOTICE
If the DEL AOP® Spa electrical connection is to be attached to the spa controls, be sure the spa controls are protected by a Ground Fault Circuit Interrupter (G.F.C.I.). If the DEL AOP® Spa is connected to an independent electrical supply, then a G.F.C.I. must be installed between the DEL AOP® Spa and the electrical supply.
WARNING
To reduce the risk of electrical shock, if the power cord is damaged, replace the entire unit immediately.
NOTICE
The DEL AOP® Spa must be mounted under the spa skirt, sheltered from environmental elements (rain, sun, sprinklers).
NOTICE
Plastic ozone supply tubing is available with the DEL AOP® Spa.
Never replace this tubing with metal tubing.
CAUTION
Do not operate the DEL AOP® Spa unless sufficient airflow is being drawn through the unit.
WARNING
Short-term inhalation of high concentrations of ozone and long-term inhalations of low concentrations of ozone can cause harmful physiological effects. Do not inhale the ozone gas produced by this device.
WARNING
Exposure to UV light from this device is harmful to the skin and eyes. Do not attempt to remove or service the UV lamp while it is lit.

SECTION 1 Installation Instructions

  1. Overview
    Achieve The Complete Modern Spa® by choosing sanitizing components that work together, creating the best possible installation.
    The DEL AOP Spa is a UV/Ozone sanitation unit designed for use in portable spas and to be controlled by the spa’s equipment pack. Please contact customer support if the DEL AOP Spa is used in an application other than a portable spa.
    CMP SPA Ozone UV Sanitation Spa Solar Eclipse - Complete
Modern Figure 1: DEL AOP® Spa System Overview

  2. Mounting
    a. Use the two mounting holes located internally on the back panel of the DEL AOP Spa (Figure 1).
    b. Mount the DEL AOP Spa to the spa frame with #8 hardware. The preferred mounting orientation is shown in Figure 2. Connect the water inlet at the bottom. Contact customer support for other installation options.
    CMP SPA Ozone UV Sanitation Spa Solar Eclipse - Spa Plumbing
Diagram Figure 2: DEL AOP® Spa Plumbing Diagram

  3. Plumbing
    The ozone injector is to be installed upstream of the DEL AOP Spa so the ozone can pass through the UV reactor. This interaction leads to an advanced oxidation process which will improve sanitation. However, the DEL AOP Spa will function properly if the ozone injector is installed downstream.
    a. Connect ozone compatible tubing (1/4” internal diameter) to the open hose barb on the DEL AOP Spa
    b. Run tubing to the ozone injector or appropriate vacuum source.
    i. If the DEL AOP Spa is mounted above the waterline, the tubing may be run directly to the vacuum source.
    ii. If the DEL AOP Spa is mounted below the waterline, run tubing to a point above the water line and back down to the vacuum source.
    c. Install the check valve in the tubing above the waterline. Ensure flow direction is from the DEL AOP Spa to the vacuum source.
    d. Secure all tubing connections with hose clamps.

  4. Electrical
    a. Verify that there is no power to the spa and connect the DEL AOP Spa cord to the mating connector(s) on the spa controller.
    b. Where possible, route the DEL AOP Spa power cord away from other electrical lines. Avoid routing the power cord parallel to any low-voltage signal wires.
    c. Use a minimum of 8 AWG solid copper conductors to connect the bonding lug provided on the enclosure base to the spa equipment ground.

  5. Operation
    If installed correctly, the DEL AOP Spa will turn on and off as required by the spa controller. After installation, turn the spa on and verify that the POWER ON and UV LAMP ON indicator lights are illuminated.
    Repair any leaks in the water or ozone lines and verify that small bubbles can be seen in the return flow. Finally, turn the Spa off and make sure that the POWER and UV indicator lights are not illuminated.
    CMP SPA Ozone UV Sanitation Spa Solar Eclipse - POWER and UV indicator
lights Figure 3: DEL AOP® Spa Exploded View

SECTION 2 Maintenance Instructions

  1. Maintenance
    WARNING Before performing any maintenance on the DEL AOP Spa, make sure the spa is shut down.
    6A. UV Lamp Removal (see Figure 3)
    If the power indicator is on, but the UV lamp indicator is off, the UV lamp needs to be replaced. For maximum UV sanitation effect, replace the UV lamp every 18 months, even if the lamp continues to shine a light.
    i. Make sure the unit is disconnected from power and the lamp has cooled before starting maintenance.
    ii. Open the DEL AOP Spa by removing the two front screws and loosening the two Enclosure Screws on the Upper enclosure assembly. Pull the cover from the enclosure base.
    iii. Disconnect the lamp connector attached to the lamp wires.
    iv. Gently pull on the lamp wires until the top of the UV lamp is out of the lamp retainer. Grasp the white ceramic end of the UV lamp and pull until it is fully removed. Gently twisting the lamp may facilitate removal. If the UV lamp will be reused, AVOID TOUCHING THE UV LAMP GLASS WITH YOUR BARE
    HANDS. Handle the lamp carefully and set it aside. If discarding, dispose of it properly (see the following note).
    NOTICE
    UV Lamp CONTAINS MERCURY. Manage in accordance with disposal laws. See www.lamprecycle.org.
    6B. Installing the UV Lamp
    i. Make sure to handle the new lamp by the ceramic endcaps. B careful not to touch the UV lamp. If necessary, wipe off the UV lamp with alcohol and a lint- free cloth before installing.
    ii. Slowly place the UV lamp into the lamp retainer until the top of the UV lamp is pushed past the tabs on the lamp retainer.
    iii. Connect the lamp connector to its corresponding part in the ballast assembly.
    6C. UV Reactor Service and Maintenance
    The UV lamp is housed in a quartz tube. If the quartz tube becomes dirty, its ability to transmit rays from the UV lamp will be diminished and decrease system performance. The quartz tube should be removed from the UV reactor at least once a year or during a routine spa water change for inspection and cleaning. More frequent cleaning may be necessary depending on water conditions.
    6D. Quartz Tube Removal and Cleaning
    CAUTION
    Wear proper eye and skin protection for servicing glass components.
    NOTICE
    Damage caused by broken quartz tubes is not covered under the DEL AOP Spa Limited Warranty.
    CAUTION If broken glass is trapped in the spa system, do not operate the spa. Contact a service professional to have the glass removed.
    i. Make sure the spa is shut down and the system has cooled before performing maintenance on the quartz tube. If you have installed isolation valves, close them before servicing.
    If you do not have isolation valves, the spa must be drained below where the DEL AOP Spa is mounted.
    ii. Remove the enclosure cover and UV lamp as described in Section 4C and set aside.
    iii. Remove the two retainer screws and retainer washers from the top of the lamp retainer and pull the lamp retainer out of the UV chamber cap.
    NOTICE
    Any water remaining in the system above the level of the DEL AOP Spa will flow out of the UV housing once the lamp retainer is removed.
    iv. Grasp the inside of the quartz tube and pull it out of the housing. Make sure the sealing ring does not get lost during quartz tube removal.
    v. Inspect the quartz tube for cracks and replace if cracks are found. Inspect the sealing ring for nicks or hardness and replace it if necessary.
    vi. Clean the quartz tube exterior with a mild solution of muriatic acid and water in a ratio of four parts water to one part acid
    (4:1). DO NOT USE ABRASIVE CLEANERS.
    CAUTION Follow the directions for safe use and handling of muriatic acid on the acid bottle label. When mixing, always add acid to the container first, then add water.
    vii. After cleaning the quartz tube, wash it off with water and wipe dry with a soft towel.
    viii. Make sure the inside of the quartz tube is dry before installing the UV lamp.

SUPPORT
SAVE THESE INSTRUCTIONS
Record Information on this System Below & Keep for Your Records
Installer ____
System Purchased From _
Installation Date ___

Serial Number ___
Model Number __
CMP Customer Service & Tech Support
Toll Free: 1-800-733-9060
FAX: 770-632-7115
[email protected]
Warranty Questions
[email protected]

NOTES

CMP, LLC
36 HERRING ROAD, NEWNAN, GA 30265
WWW.C-M-P.COM/DEL
0521ab

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

CMP User Manuals

Related Manuals