Wellis WZ00081 Napoli Shower Panel Instruction Manual

June 6, 2024
Wellis


Napoli shower panel
INSTRUCTION MANUAL

Function

1. Water fall

2. Shower Head
3. Body jets
4. Diverter
5. Mixer
6. Spout
7. Hand shower

Parts List

Please unpack and inspect all packages and components carefully, and make sure they are complete. Examine for shipping damage. If some parts are damaged or missing, notify your dealer immediately.

For installation, You may Require the Following Tools

Note!
Before assembly, flush the water supply pipes thoroughly to remove debris(allow the water to run with the main stopcock open for about 3 mins), otherwise, dirt particles might affect the function of the shower panel!

Wall-mounting

NOTE!
Before drilling any holes for fixing your shower panel ensure that there are no hidden cables or pipework within the wall.

| |
---|---|---
Drill the holes in the wall| Insert the wall plugs inside the holes| Tighten the screws to the wall with wall mounting brackets

  Hang the shower panel on the mounting bracket

Wall-mounting

Choose a suitable place to install the shower panel, adjust the shower panel’s vertical position based on the user’s height and your sanitary room. Usually, install the panels at a distance of 210cm from the top to the ground, but you can assemble according to your preference.

Note! The height can be altered to suit individual requirements. The dimensions are for reference only.

H: Coldwater – ½” connection
M: Hot water – ½” connection
Construction and installation of a floor drain are obligatory!
The dimensions given are indicative only and may vary due to the manufacturing technology of the product. By +-1 centimeters.
The operation of our shower panels and faucets is designed for the ideal water pressure between 3.5-4.5 bar.


Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Wellis User Manuals

Related Manuals