Wellis WZ00081 Napoli Shower Panel Instruction Manual
- June 6, 2024
- Wellis
Table of Contents
Napoli shower panel
INSTRUCTION MANUAL
Function
1. Water fall
2. Shower Head
3. Body jets
4. Diverter
5. Mixer
6. Spout
7. Hand shower
Parts List
Please unpack and inspect all packages and components carefully, and make sure they are complete. Examine for shipping damage. If some parts are damaged or missing, notify your dealer immediately.
For installation, You may Require the Following Tools
Note!
Before assembly, flush the water supply pipes thoroughly to remove
debris(allow the water to run with the main stopcock open for about 3 mins),
otherwise, dirt particles might affect the function of the shower panel!
Wall-mounting
NOTE!
Before drilling any holes for fixing your shower panel ensure that there are
no hidden cables or pipework within the wall.
| |
---|---|---
Drill the holes in the wall| Insert the wall plugs inside the holes|
Tighten the screws to the wall with wall mounting brackets
Hang the shower panel on the mounting bracket
Wall-mounting
Choose a suitable place to install the shower panel, adjust the shower panel’s vertical position based on the user’s height and your sanitary room. Usually, install the panels at a distance of 210cm from the top to the ground, but you can assemble according to your preference.
Note! The height can be altered to suit individual requirements. The dimensions are for reference only.
H: Coldwater – ½” connection
M: Hot water – ½” connection
Construction and installation of a floor drain are obligatory!
The dimensions given are indicative only and may vary due to the manufacturing
technology of the product. By +-1 centimeters.
The operation of our shower panels and faucets is designed for the ideal water
pressure between 3.5-4.5 bar.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>