HARVIA WL300 Smoke Pipe Cover Instruction Manual

June 10, 2024
HARVIA

WL300 Smoke Pipe Cover
Instruction Manual
Instructions for Installation of Smoke Pipe Cover

WL300 Smoke Pipe Cover

HARVIA WL300 Smoke Pipe Coverhttps://mediabank.harvia.com/catalog/Harvia/r/1074

INSTRUCTIONS FOR INSTALLATION

Before installation

  • Make sure that the minimum safety distance requirements for stove, smoke pipe cover and chimney are fulfilled.
  • If it is planned that the insulated part of the chimney will begin right on top of the smoke pipe cover, you should fill the smoke pipe cover with stones before installing the insulated part of the chimney.

Steps

  1. If you install the smoke pipe cover around an angled smoke pipe, cut a lead-through for the smoke pipe.
  2. Install the stove and pile stones in the stove according to instructions provided with the stove.
  3. Form an even layer of stones around the stove’s upper connection opening. The smoke pipe cover will stand on the stones.
  4. Pile ca 40 kg of large stones into the smoke pipe cover. Pile the stones as densely as possible. Make sure that the smoke pipe is not visible behind the stones after the stones are in place.

HARVIA WL300 Smoke Pipe Cover - fig

Steps Arbeitsschritte

HARVIA WL300 Smoke Pipe Cover - fig 2

Minimum safety distances from walls and benches made of combustible materials
(provided that the stones have been piled carefully – stones must cover the stove body and smoke pipe completely!)

HARVIA WL300 Smoke Pipe Cover - fig 3

GLOBAL:
P.O.Box 12 | Teollisuustie 1-7
40951 Murage | FINLAND
+358 207 464 000
harvia@harvia.fi | www.harvia.com

CENTRAL EUROPE:
semeiotic GmbH | Division of Harvie Group
Gardenburger Strafe 31, A-4840 Vöcklabruck T +43 (0)
7672/22 900-50 | F -80
info@sentiotec.com 
www.sentiotec.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals