FORSTER TECHNIK TAP5-EZ2-32 Automatic Lamb Feeder System User Guide

June 6, 2024
FORSTER TECHNIK

FORSTER TECHNIK TAP5-EZ2-32 Automatic Lamb Feeder System

Installation checklist

This document provides a brief overview of what to consider when installing a lamb feeder.

  1. Establish ground connection

  2. Connect power

  3. Connect water

  4. Open hose fittings

  5. Feeding station – suction hose

    Mount the suction hose holder for cleaning – higher than the mixer position and near the suction points.

  6. Fix protection grid and fill the powder hopper

  7. **Fill boiler

**

  1. New setup

    All values set back to factory settings. Boiler is filled.

  2. Adjust target temperature

    Hint: button

  • press to stop Automatic mode
    ** press to start Automatic mode

    1. Adjust portion size – Water

      10. Adjust portion size – Milk powder (MP)

    2. Cleaning – Mixer

    3. Cleaning – Suction hose

This checklist refers to the basic equipment of the Lamb Feeder. Not all available functions can be shown.
For detailed information and valid warnings as well as safety instructions, please refer to the instructions manual. (Status 21/07)

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

FORSTER TECHNIK User Manuals

Related Manuals