CORNING SCRN-530 Small Cell Radio Node Installation Guide
- June 6, 2024
- Corning
Table of Contents
- FCC Statements
- Safety Precautions
- System Overview
- Product Overview
- SCRN-530 Views
- System Specifications
- Compliance
- Mounting the SCRN-530
- Cabling Guidelines
- Completing the Installation
- SCRN-530 LED Management
- Disabling the LED Display
- Re-Enabling the LED Display
- SFP+ LED Indications
- Corning Documentation Set
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Small Cell Radio Node – SCRN-530 Hardware
Installation Guide
DOC-SCRN-530-HIG
Issue 1
Related Literature
Search www.Corning.com/opcomm. Click Required
Resources.
Table 1 Revision History
Issue | Date | Summary of Changes |
---|---|---|
1 | 21-Jul-21 | The first issue for SCRN-530 Small Cell Radio Node. |
FCC Statements
Caution: Any changes or modifications to this device not explicitly
approved by the manufacturer could void your authority to operate this
equipment.
RF Exposure Warning Statement: This equipment complies with FCC
radiation exposure limits set forth for an uncontrolled environment. This
equipment should be installed and operated with a minimum 40 cm between the
radiator and your body. This transmitter must not be collocated or operating
in conjunction with any other antenna or transmitter unless authorized to do
so by the FCC. This device can be expected to comply with part 15 of the FCC
Rules provided it is assembled in exact accordance with the instructions
provided with this kit. Operation is subject to the following conditions: (1)
This device may not cause harmful interference, and (2) this device must
accept any interference received including interference that may cause
undesired operation.
NOTE: This equipment has been tested and found to comply with the limits
for a Class A digital device, pursuant to part 15 of the FCC Rules. These
limits are designed to provide reasonable protection against harmful
interference when the equipment is operated in a commercial environment. This
equipment generates, uses, and can radiate radio frequency energy and, if not
installed and used in accordance with the instruction manual, may cause
harmful interference to radio communications. Operation of this equipment in a
residential area is likely to cause harmful interference in which case the
user will be required to correct the interference at his own expense.
Safety Precautions
Corning strongly recommends reviewing and adhering to the following cautions
and notices before installing and operating the SCRN-530.
WARNING: This warning symbolizes danger that may cause severe injury or
death. Before installing or servicing equipment ensure that you are aware of
all hazards involved with electrical circuitry and become familiar with
applicable safety standards and national and local electrical codes and any
other relevant standards.
WARNING: For Professionals & Trained Installers:
- The device is designed for wall mount or ceiling mount applications only in an enterprise environment.
Installers are required to maintain RF safety distances of 40 cm during the course of the installation process.
Wall installation should be avoided if a minimum safety distance of 40 cm cannot be maintained.
WARNING: All electrical equipment must be properly grounded. Refer to
national and local electrical codes and any other relevant standards for
electrical grounding information.
Other Cautions
CAUTION: ESD can damage the SCRN-530 and internal components. Ensure that
the SCRN-530 and associated antenna equipment is installed and serviced
according to national and local ESD standards.
CAUTION: Do not open the SCRN-530 casing. E-RAN wireless system equipment
must only be serviced by Corning-accredited personnel. Opening the SCRN-530
casing voids the warranty.
System Overview
The Corning SCRN-530 small cell radio node is a high-performance integrated 5G
new radio (NR) mmWave small cell that is part of the Corning enterprise radio
access network (E-RAN). The scalable SCRN-530 radio node and the enterprise
radio access network (E-RAN) simplifies the complexity of radio management and
mobility, and provide operators with a single touchpoint to aggregate and
manage a large network of 5G small cells. This guide provides the system
specifications of the SCRN-530. It includes detailed hardware installation
instructions, the boot sequence, and expected LED behavior both during the
boot-up and under normal operating conditions.
NOTE: The SCRN-530 small cell radio node is referred to as “radio node”
in the rest of this document.
NOTE: The 5G New Radio (NR) is a new radio access technology developed by
3GPP for fifth-generation (5G) mobile networks. The primary audience for this
guide includes network planners, system administrators, and installation
personnel. It assumes you have knowledge about networking principles,
networking configuration, site preparation, powering, and experience in
hardware installation and maintenance.
Product Overview
The SCRN-530 is a 5G mmWave Time Division Duplexing (TDD) radio node that
supports 2 x 2 MIMO small cell operation on NR band n260, enabling high user
capacity and high data rates for the coverage footprint. The radio node
connects to a Corning centralized unit (CU). It uses certificate-based
authentication with the Corning CU. Radio Nodes are managed by the Corning
centralized units installed in the enterprise or in a centralized location
such as a data center.
The SCRN-530 includes built-in self-organizing networks (SON) features for
ease of deployment. Its fronthaul network can be deployed using approved 10 Gb
fiber optic cables. The SCRN-530 receives 48 VDC power from a Corning PSU6 DC
Power Supply Unit or equivalent. There is no management or console port on the
SCRN-530, and the radio node is physically locked to prevent theft. The
SCRN-530 is passively convection cooled, and its antennas are built-in. Each
SCRN-530 comes with a ceiling-mount bracket attached for installing directly
to a flat surface, as well as a second multiangle (0, 15, 30, and 45 degrees)
wall-mount bracket lose in the box. The SCRN-530 uses on-chip Trusted Platform
Module (TPM) functions to implement secure boot and to establish certificate-
based IPsec tunnels to the centralized unit. It includes a PTP client to
achieve frequency and phase synchronization with other mmWave radio nodes and
base stations. The E-RAN element management system includes configuration,
fault and performance monitoring, and security functions.
Figure 1 shows the architecture of the 4G and 5G E-RAN networks.
Enterprise Figure 1 4G and 5G E-RAN Architecture
3. Radio Node Model
Table 1 includes the SCRN-530 model configuration.
Radio Node Model | Description | Antenna Type |
---|---|---|
SCRN-530-39 | 39 GHz band n260 mmWave RN with 8 x 8 | |
dual-polarization antenna array | Internal |
SCRN-530 Views
Figure 2 and Figure 3 display views of the SCRN-530.
Figure 2 SCRN-530 Cover
Figure 3 SCRN-530 With Ceiling-Mount Bracket
5. Connectors, SFP+ and Micro-USB Ports, and Status LED
The SCRN-530 has connectors and a small form-factor pluggable SFP+ port, as
shown in Figure 4.
Figure 4 SCRN-530 Connectors and Status LED
5.1 Phoenix Power Cable Port
The SCRN-530 has a 48 VDC power connector for delivering power from a Corning
PSU6 DC Power Supply Unit or equivalent to the radio node. Plug the Phoenix
power connector from the power source cable into the power connector.
5.2 SFP+ Transceiver Port
The SFP+ Transceiver Port accommodates a compact enhanced small form-factor
pluggable (SFP+) network interface module. The hot-pluggable SFP+ supplied
with this SCRN-530 must be installed in the Transceiver Port. The LC
connector, terminated end, of the fiber pair of an ActiFi cable (or other
approved fiber cable) is then connected to the SFP+ LC Ports to provide
fronthaul transport network access to the radio node. Refer to Section 16.
SFP+ LED Indications for more information.
5.3 Micro-USB Port
The Micro-USB port is completely disabled and is not available for general
use.
5.4 Status LED
The STA (status) RGB tri-color LED indicates the state of the SCRN-530, with
the boot, normal, disabled, fault, and SCRN-530 indications. When the radio
node initially boots, the LED cycles through a number of colors and flashing
behaviors until the radio node is fully operational. Section 12. SCRN-530 LED
Boot Sequence describes the STA LED indications.
System Specifications
The SCRN-530 has the chassis measurements, power requirements, and
environmental requirements, and complies with the standards listed in Table 2.
Refer to the feature guide for your centralized unit software release for
release-specific features and specifications.
Table 2 SCRN-530 Specifications
Operating Band | 2 x 2 MIMO operation on 39-GHz NR band n260 (37.0 —40.0 GHz) |
---|---|
Channel Size | Component Carrier (CC) bandwidth:100 MHz |
Antenna Type | 8 x 8 dual-polarization internal antenna array |
Antenna Power | 43 dBm EIRP @ 64QAM |
Beamforming scan range: +/- 60 degrees
RF Management| Beam Management with auto-assignment of physical cell
identities (PCIs)
QoS Features| Non-GBR bearer support per UE
Dimensions| 279.4 x 279.4 x 80.3 mm (11.0 x 11.0 x 3.16 in)
Weight| 4.5 kg (9.9 lbs)
Input Power| 1 x 48 VDC Phoenix, deliverable using Corning® ActiFi®
2-fiber/2copper conductor composite cable
Power Consumption| 70 W
Ingress Protection| Ingress protection rating: IP30
Performance| 4CC; up to 64 active users
Peak Tx Rate| 1.8 Gbps DL, 60 Mbps UL (DL:UL slot ratio of 4:1) @ 64QAM with
4CC DL, 1CC UL
Licensed Tx Power| Equivalent isotropically radiated power (EIRP): 43 dBm
Fronthaul Network| Deployable over Corning® ActiFi® 2-fiber/2-copper conductor
composite cable
Ethernet Interface| SFP+ supports 10 GbE (Gigabit Ethernet)
LEDs| 1 tricolor (RGB) LED to indicate power and status, 2 SFP LEDs to
indicate Link/Activity status
Synchronization| IEEE 1588v2-based (PIP) synchronization with an external PIP
grandmaster clock
Mounting| Wall or Ceiling, brackets included Brackets support four wall-mount
tilting options: 0°,15°,30°, and 45° tilt
Cooling Method| Passive convection cooling
Table 2 SCRN-530 Specifications (continued)
Security| Secure boot and secure key storage using Trusted Platform Module
(TPM) functions
IPsec tunneling to NR CU (Centralized Unit) X.509 certificate-based
authentication
---|---
Environmental Requirements| Operating temperature range: 0 to 45°C (32° to
113°F) Non-operating temperature range: -40° to +70°C (-40° to 158°F) Relative
humidity: Operating and storage: 5% to 90% RH noncondensing
MTBF| 1,363,791 hours at +40°C (104°F)
Compliance
The SCRN-530 complies with the standards listed in Table 3.
Safety
Table 3 Radio Node Compliance
Safety:…………………….. UL-62368-1 2nd Edition FCC Compliant: Part 15 (Class A),
Part 30 FCC 47 CFR 1.1307(b) MPE: FCC 47 CFR 1.1310
Mounting the SCRN-530
The SCRN-530 can be installed on walls and below ceilings with the factory- provided brackets. When mounting a radio node on a wall, position the cooling fins vertically. The factory-provided wall-mount bracket can tilt the radio node down at the following angles: 0°, 15°, 30°, and 45°. Figure 5 shows the SCRN-530 downtilt options.
Figure 5 Mounting Bracket Downtilt Options
NOTE: Always consult and follow local codes for mounting and wiring
Corning equipment.
When possible, locate downward-radiating radio node units at least 0.5 meters
(20 inches) from external walls. This distance maximizes indoor coverage and
minimizes RF leakage outside the building. When mounting near a wall or other
obstruction, orient the mounting bracket so that the top of the radio node
faces towards the coverage area and faces away from the wall.
8.1 Installing the SCRN-530 on a Ceiling
As shown in Figure 3, the SCRN-530 comes with the ceiling-mount bracket
attached. This bracket is held to the radio node mounting side with four
shoulder screws and a captive securing screw and is non-tilting. The shoulder
screws should not need to be adjusted but if they do, loosen them slightly to
be able to slide the ceiling-mount bracket on and off of the radio node when
the captive securing screw has been loosened. Figure 6 shows the captive
securing screw and four security screw locations.
NOTE: The security screws should not need to be adjusted but if they do,
loosen them slightly to be able to slide the ceiling-mount bracket on and off.
Figure 6 Ceiling-Mount Bracket Screw Locations
Step 1 Loosen the captive securing screw on the ceiling-mount bracket.
Step 2 Slide the ceiling-mount bracket toward the captive securing screw to
remove it from the radio node base.
NOTE: The shoulder screws should not need to be adjusted but if they do,
loosen them slightly to be able to slide the ceiling-mount bracket on and off.
Step 3 Secure the ceiling tethering system. Make sure that it can support the
weight of the radio node and the ceiling-mount bracket.
NOTE: Corning recommends that you use a customer-supplied projector mount
when hanging the radio node from a dropped T-bar ceiling.
Step 4 Secure the ceiling-mount bracket to the ceiling tethering system.
Step 5 Slide the radio node back onto the bracket and gently tighten the
securing screw.
Figure 7 shows a radio node and the ceiling-mount bracket as the assembly
can be mounted to a ceiling tethering system.
Figure 7 Radio Node with Ceiling-Mount Bracket
8.2 Installing the SCRN-530 on a Wall
The SCRN-530 comes with the ceiling-mount bracket attached and has the
multiangle wall-mount bracket lost in the box.
Figure 8 shows the radio node wall-mount bracket.
Figure 8 Radio Node Wall-Mount Bracket When using the multi-angle wall-mount
bracket, it is not necessary to remove the ceiling-mount bracket from the
radio node; the wall-mount bracket attaches to the wall, and then it attaches
to the ceiling-mount bracket-and-radio node assembly.
Figure 9 shows how the radio node wall-mount bracket attaches to the
ceiling-mount bracket.
Figure 9 Wall-Mount Bracket Attached to the Ceiling-Mount Bracket
Step 1 Using a spirit level, use the wall-mount bracket as a template to mark
securing hole locations.
Step 2 If required, install sheetrock plugs.
Step 3 Attach the wall-mount bracket to the wall. Figure 8 shows the radio
node wall-mount bracket.
Step 4 Seat the ceiling-mount bracket on the wall-mount bracket:
– First, attach the ceiling mount bracket to the radio node, then slide this
subassembly into the wall bracket.
– Then, set the radio node to the required tilt, and tighten the wall-mount
bracket captive securing screw to lock the radio node tilt angle.
NOTE: Put pressure on the radio node when tightening the captive securing
screw.
Figure 10 shows how to attach the wall-mount bracket to the ceiling-mount
bracket.
Figure 10 Attaching the SCRN-530 with Ceiling-Mount Bracket to the Wall-
Mount Bracket
Step 5 Make sure that both of the captive securing screws are tightened.
Cabling Guidelines
Incorrectly cabling the SCRN-530 can result in crushed cables and loss of communications to the radio node. Follow these guidelines when cabling the SCRN-530:
- Make sure that the cabling is properly routed and dressed.
- When mounting the radio node vertically, orient the bracket so that the bracket keyholes have the wide side up as shown in Figure 3.
- Make sure that the radio node is fully secured to the mounting brackets so that it locks into place.
- A correctly-installed cable should at no time during installation impede inserting the radio node into the mounting brackets.
Completing the Installation
Step 1 Make sure that the captive securing screws are tightened. The radio
node is now anchored.
Step 2 When it receives power, the radio node boots up and attempts to connect
to the centralized unit.
11. Detaching the SCRN-530 from the Mounting Brackets
Step 1 Loosen the captive securing screw on the left side of the wall mount
bracket.
Step 2 Pull the plunger pin on the right side of the wall mount bracket and by
pulling up take out the radio node from the wall mount bracket.
Step 3 Detach the cables from the cable brackets and cable connectors. Step 4
Loosen the captive securing screw and slide out the bracket from the
radio node.
12. SCRN-530 LED Boot Sequence
The radio node state machine is sequential and progresses in the following
order:
State 0 - > State 1 -> State 2 -> State 3 -> State 4 -> State 5 -> State
6
A normal boot sequence transitions through all these states sequentially and
the LED state transitions accordingly. If the radio node fails to transition
to the next stage, the system restarts the boot sequence, starting with State
0. You can determine the progress during the booting stages by observing the
LED color transitions. When the boot sequence completes, all devices are
reachable. On failure, the LED state display the state that encountered the
failure. Table 4 shows the SCRN-530 boot sequence and corresponding LED
behavior.
Table 4 SCRN-530 LED Boot Sequence
State| LED Color| Description| Possible Failures and
Actions
---|---|---|---
0. Power On/ Reset| Flashing Green| This is the initial state of a startup.
The radio node bootup is controlled by firmware in this state.| This state
should be very short-lived and should transition to the next state
immediately.
1. Software Initialization| Flashing Green| The firmware has loaded and
transferred control to the bootloader.
Additional hardware initialization and validation are performed during this
state. This state concludes with a lamp test, cycling through all LED colors.|
This state should be very short-lived and should transition to the next state
immediately. A radio node should not stay in the state indefinitely.
Note: Flashing Green is also used to indicate a radio node that has been
administratively disabled. This can be determined from the CLI.
2. DHCP| Solid Red| The radio node starts by sending out a DHCP Request.
The radio node moves to the next state (State 3) upon receiving a DHCP
response and an IP Address.| No DHCP Response, IP Address not allocated.
Check to cable, DHCP Server configuration.
3. Join| Solid Blue| The radio node has an IP Address and sends a UDP Join
request to the Serving centralized unit.
The radio node moves to the next state (State 4) upon getting a JOIN GRANT
from the centralized unit.| No IP reachability to the centralized unit
Check IP network between radio node and centralized unit for routing issues.
Table 4 SCRN-530 LED Boot Sequence (continued)
State| LED Color| Description| Possible Failures and
Actions
---|---|---|---
4.TFTP| Flashing Blue| The radio node proceeds next to download the operating
system image from the centralized unit.
The radio node moves to the next state (State 5) after the image has been
downloaded.| Failure to download TFTP image.
Check firewall between radio node and centralized unit.
5. Operating System Booting| Solid Green for a few seconds, off for about 30
seconds, then Solid Green| The radio node loads the operating system and
starts the default platform applications.
The radio node moves to the next state (State 6) when it establishes
connectivity with the centralized unit.| Failure to start the operating
system.
This normally points to a software/build issue. Please contact Corning
support.
6. Running| Solid Green| The operating system is running. The radio node
continues the startup sequence but is now controlled by the centralized unit.|
The operating system is up and running on the radio node. Any subsequent state
transitions can now be
tracked from events and logs on the centralized unit.
SCRN-530 LED Management
The LED display is active by default but can be deactivated in light-sensitive environments as needed. Even when the display is disabled, the LED will be lighted during the following conditions:
- while the radio node is booting
- if the radio node or cell is in a fault state
- Table 5 lists the default LED behavior of the radio node.
LED | Status | Flash Rate |
---|---|---|
Green: slow flashing | The radio node or radio is administratively disabled |
Approximately 1/2 second on, 11/2 sec. off
Green: fast flashing| Syncing| Approximately 1.4 seconds on/ off cycle
Green: solid| Operational|
Red: solid| Fault|
Blue: fast flashing| Locate radio node-enabled (Note)| Approximately 1 second
on/ off cycle
Off| Powered off or LED disabled|
Note: Refer to the Corning SCOS Administrator Guide for information about the locate radio node feature.
Disabling the LED Display
Step 1 From the CLI Configuration Mode, issue the set System RadioNode LED
DefaultMode Dark command to disable the LED display:
%set System RadioNode LED DefaultMode Dark
Step 2 Issue the show System RadioNode LED command to verify the
configuration:
%show System RadioNode LED DefaultMode Dark;
Re-Enabling the LED Display
Step 1 From the CLI Configuration Mode, issue the set System RadioNode LED
DefaultMode Standard command to re-enable the LED display:
%set System RadioNode LED DefaultMode Standard
Step 2 Issue the show System RadioNode LED command to verify the
configuration:
%show System RadioNode LED DefaultMode Standard;
SFP+ LED Indications
The enhanced small form-factor pluggable has a green Link Status Indicator LED, and an unused amber LED. The Link Status Indicator LED has the following operational modes:
- Off…….No Link (disconnected)
- Solid Green ……………….10 Gbps link has been established
Corning Documentation Set
The Corning documentation can be downloaded from the customer support portal
(the “Corning One Community”) at https://onesupport.corning.com. This site
requires a login which is available to individuals who have attended Corning
Small Cell training in the past two years.
Email onesupport@corning.com to request a
login if you meet these criteria.
Corning Optical Communications LLC
- 4200 Corning Place, Charlotte, NC 28216 USA 800-743-2675
- FAX: 828-325-5060
- International: +1-828-901-5000
- www.corning.com/opcomm
Corning Optical Communications reserves the right to improve, enhance, and
modify the features and specifications of Corning Optical Communications
products without prior notification. A complete listing of the trademarks of
Corning Optical Communications is available at
www.corning.com/opcomm/trademarks.
All other trademarks are the properties of their respective owners. Corning
Optical Communications is ISO 9001 certified. © 2021 Corning Optical
Communications. All rights reserved.
References
- Corning Optical Communications | Fiber Optic Connectivity Solutions | Corning
- Legal Notices | Corning.com
- onesupport.corning.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>