Continal 39005 Quantum Wiring Centre User Guide
- June 6, 2024
- Continal
Table of Contents
- Wiring centre description
- Power supply
- Night set back
- NC / NO jumper
- Delay jumper
- Boiler control output
- Pump control output
- Actuator connection
- Serial connector – Quantum wiring extension
- Thermostat connection
- Installation
- Product compliance and safety information
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Quantum wiring centre
The Quantum wiring centre is at the heart of our Quantum range.
Easy to install, it provides quick and easy push-fit connection for all
connected devices (including actuators, up to 8 thermostats, pump heat source
and our Quantum hub). Built-in overload protection and LED status indication
ensure safe and reliable operation.
Wiring centre description
1. Cartridge fuse 5 x 20 mm 12A
2. Power supply
3. NSB function terminals
4. NC / NO jumper (actuator type)
5. Delay jumper
6. Boiler control output| 7. Pump control output
8. Actuators connection
9. Serial connector for the Quantum wiring extension
10. Reset button
11. Thermostat connection
---|---
Power supply
Note: Only replace the fuse when the wiring centre is disconnected from
the power supply.
The fuse is located under the housing cover next to the power supply
terminals, and secures the wiring centre and the devices connected to it. Use
ceramic tube fast blow 250V ROHS fuses (5×20 mm) with a nominal max current
12.5A. To replace the fuse remove the fuse holder with a flat screwdriver and
pull out the fuse.
The power supply for the wiring centre is 230VAC.
Two wire installation should be made in accordance with the applicable
regulations.
Night set back
NSB is activated in non-programmable Continal thermostats via an external signal. The signal is sent via an external timer or programmable thermostat connected to the Quantum wiring centre. Nonprogrammable thermostats receive NSB signal and reduce setpoint temperature (by switching to eco mode). All thermostats must be connected using a 4-wire cable (min. 4 x 0.75mm2, max. 4 x 1.5mm2).
• OPTION 1
| One master thermostat that is common for thermostats from Group 1, Group 2
and Group 3 (one programmable thermostat, other thermostats are non-
programmable).| • OPTION 2| Three master thermostats. One for Group 1,
one for Group 2 and one for Group 3 (three programmable thermostats, other
thermostats are nonprogrammable).
---|---|---|---
• OPTION 3
| One external clock that is common for thermostats from Group 1, Group 2
and Group 3 (one external clock + daily regulators).| • OPTION 4| Three
external clocks. One for Group 1, one for Group 2 and one for Group 3 (three
external clocks + nonprogrammable regulators).
Note: Terminals 1-4 and 5-8 are located in the Quantum wiring centre, while terminals 9-12 are located in the Quantum wiring extension module.
NC / NO jumper
Select the type of the actuator connected to the wiring centre:
NC actuator normally closed (defualt)
NO actuator normally opened
Jumper position change must be refreshed in the memory by short pressing the
Reset button.
Delay jumper
Boiler off delay time.
Note: Pump (Pump output) and boiler (Boiler output) starts 3 minutes
after receiving the heating signal from thermostats connected to wiring
centre. The pump stops 3 minutes after the last call for heat sent by the
thermostat. The heat source (boiler) will turn off after the time set on the
delay jumper.
A jumper position change must be refreshed in the memory by short pressing the
reset button.
• used to refresh the data, after switching jumpers 4 or 5.
Boiler control output
Boiler output – this is a VOLT FREE output (COM / NO) that controls the
boiler.
The output closes and the boiler turns on 3 minutes after receiving the
heating signal from any of thermostats paired with the wiring centre.
The output opens and the boiler switches off when the last thermostat stops
sending a heat demand (after the time set on the delay jumper).
Pump control output
Pump output – this is a VOLT FREE output (COM / NO) that controls the
circulation pump in the heating system.
The output closes (pump starts) 3 minutes after receiving the heating signal
from any of thermostats paired with the wiring centre.
The output opens (pump stops) 3 minutes after the last demand for heating is
sent by the thermostat.
Actuator connection
The actuator wires should be secured with the self-locking connectors in the appropriate zone. Up to 6 actuators with a load of up to 2 watts each can be connected to a single zone. Should more than 6 actuators be required in a zone use an additional relay to relieve the output.
Serial connector – Quantum wiring extension
The serial connector is used to connect the Quantum wiring centre to the Quantum wiring extension module to add functionality and support for up to12 zones.
Thermostat connection
Installation
|
---|---
Remove the top cover of the wiring centre.| Unscrew the main housing (see
picture).
|
Mount the back side of the housing to the wall. When mounting on a DIN rail,
open the hooks on the back of the housing.| Remove the appropriate piece of
insulation from the wires.
|
Thread the wires under the mounting belt in the back part of the wiring
centre. Includes accessories to support the installation process.| Thread the
wires through the slots in the top part of the wiring centre and connect it to
the terminals.
|
Adjust the wires and screw the main housing for the wiring centre to the rear
housing.| Connect the actuators wires.
Make sure that all the wires are properly connected, mount the top cover and
power up the wiring centre. The red power indicator LED will illuminate.
Product compliance and safety information
Product compliance
This product complies with the essential requirements and other relevant
provisions of the following EU Directives: EMC 2014/30/EU, Low Voltage
Directive LVD 2014/35/EU, RoHS directive 2011/65/EU.
Safety information
Use in accordance with national and EU regulations. Product for indoor use
only in dry conditions. Installation must be carried out by a qualified person
in accordance with national and EU regulations. Before attempting to setup and
install, make sure that Quantum wiring centre is not connected to any power
source. Installation must be carried out by a qualified person. Incorrect
installation may cause damage to the wiring centre. The Quantum wiring centre
should not be installed in areas where it may be exposed to water or damp
conditions.
Want more information?
022 508 38 82
www.continal.ch
Rev:07/21 © 2021 Continal Group Ltd.
All rights reserved. E & OE.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>