DRAZICE OKC 200 NTR/HP High Speed Water Heater Instruction Manual

June 3, 2024
Drazice

DRAZICE OKC 200 NTR/HP High Speed Water Heater

PRODUCT TECHNICAL SPECIFICATION

FUNCTION DESCRIPTION
The OKC 200 (250, 300, 400, 500, 750, 1000) NTR/HP stationary tank is designed for the preparation of hot sanitary water in combination with heat pump. Reheat can be carried out by the electric heater TJ 6/4″.

DESIGN AND BASIC DIMENSIONS OF THE TANK

PRODUCT DESCRIPTION
The tank receptacle is welded of steel plate and, as a unit, protected with enamel that resists to hot water. For additional corrosion protection, two magnesium anodes are mounted in the upper part of the receptacle and in the side flange to adjust the electric potential inside the receptacle, thus reducing the effects of corrosion. Inside the vessel, there is a welded heat exchanger made of steel pipe with enameled outer coating, and connections of hot and cold water, circulation, and a thermostat tank.

There is a cleaning and revision aperture on the side of the tank, ending with a flange of 110 mm clearance; the spacing of eight M8 screws is 150 mm. The heater is equipped with a G 1 1/2″ aperture for screwing an additional heater in. This variant is used – if the tank is connected in a system with heat pump – to finish heating water in the upper part of the tank to the desired temperature. Insulation of the receptacle is 50 or 60 mm Freon-free polyurethane foam; the shell of the tank is plastic.

TECHNICAL DATA

TYPE

|  | OKC 200 NTR/HP| OKC 250 NTR/HP| OKC 300 NTR/HP| OKC 400 NTR/HP| OKC 500 NTR/HP| OKC 750 NTR/HP| OKC 1000 NTR/HP
---|---|---|---|---|---|---|---|---
CAPACITY| l| 208| 234| 286| 352| 469| 710| 930
HEIGHT| mm| 1355| 1537| 1558| 1644| 1914| 2039| 2053
DIAMETER| mm| 584| 584| 670| 700| 700| 950| 1050
MAX. WEIGHT WITHOUT WATER|

kg

|

102

|

119

|

133

|

190

|

223

|

259

|

324

MAX. OPERATING PRESSURE IN THE TANK|

bar

|  |  |  |

10

|  |  |
MAX. OPERATING OVERPRESSURE IN THE EXCHANGER|

bar

|  |  |  |

10

|  |  |
MAX. HEATING WATER TEMPERATURE|

°C

|  |  |  |

110

|  |  |
MAX. HOT WATER TEMPERATURE|

°C

|  |  |  |

80

|  |  |
EXCHANGER HEAT SURFACE|

m2

|

2.1

|

2.5

|

3.2

|

5.2

|

6.4

|

7.0

|

9.0

EXCHANGER VOLUM| l| 13.7| 17| 21| 32| 39| 47| 63
ENERGY EFFICIENCY CLASS|  |  |  |  |

C

|  |  |
STATIC LOSS| W| 82| 87| 72| 90| 105| 130| 142

  1. 3/4″ outer
  2. 1″outer
  3. 3/4″ inner
  4. 1/2″ inner
  OKC 200 NTR/HP
A 1355
B 660
C 685
D 584
E 80
F 1280
G 860
J 259
L 209
M 1150
P 355
R 920
S 650

DRAZICE-OKC-200-NTR-HP-High-Speed-Water-Heater-fig-2

  1. 3/4″ outer
  2. 1″outer
  3. 3/4″ inner
  4. 1/2″ inner
  5. 6/4″ inner
  OKC 250 NTR/HP
A 1537
B 660
C 685
D 584
E 80
F 1460
G 1060
I 928
J 259
L 209
M 1330
P 355
R 1100
S 890
  1. 1″outer
  2. 3/4″ inner
  3. 1/2″ inner
  4. 6/4″ inner
  OKC 300 NTR/HP
A 1558
B 750
C 775
D 670
E 77
F 1579
G 760
I 895
J 325
L 219
M 1309
P 438
R 1148
S 937
  1. 1″outer
  2. 3/4″ inner
  3. 5/4″ inner
  4. 1/2″ inner
  5. 6/4″ inner
  OKC 400 NTR/HP OKC 500 NTR/HP
A 1644 1914
B 812 812
C 852 852
D 700 700
E 55 55
F 1521 1790
G 843 1023
I 1138 1310
J 288 288
L 228 228
M 1081 1253
P 592 592
R 1237 1409
S 956 1128
  1. 5/4″outer
  2. 6/4″ inner
  3. 3/4″ inner
  4. 5/4″ inner
  OKC 750 NTR/HP OKC 1000 NTR/HP
A 2039 2053
B 1017 1117
D 910 1010
D3 225 225
E 105 105
F 1891 1905
G 1123 1173
I 1491 1547
J 383 391
K 727 780
L 294 301
M 1433 1483

PRESSURE LOSSESDRAZICE-OKC-200-NTR-HP-High-Speed-Water-Heater-
fig-6

OPERATION AND FITTING INSTRUCTIONS

PUTTING THE TANK INTO OPERATION
To connect the tank to water supply system, hot water heating system or power supply and, after testing the safety valve (accordingly with the manual attached to the valve), the tank can be put in operation. Before opening the power supply, the tank must be filled with water. The process of first heating must be executed by licensed professional who has to check it. Both the hot water outlet pipe and safety armature parts may be hot.

Procedure:

  • Check the plumbing and electrical installation, including the connection to the hot-water heating system. Check the proper placement of operating and safety thermostat sensors. The sensors must be inserted all the way in; first the operating and then the safety thermostat.
  • open the hot water valve on the combination faucet;
  • open the cold water inlet valve to the tank
  • once water starts draining through the hot water valve, filling of the tank is completed, and the valve must be closed
  • should a leak (of the flanged lid) occur, we recommend tightening the screws of the flanged lid.
  • when sanitary water is heated with electric energy from hot water heating system, turn off the electricity and open the valves on the heating water inlet and outlet, possibly de-aerate the exchanger. Once the operation restarts, keep flushing the tank until the cloud disappears
  • Make sure to fill in properly the warranty certificate.

CONNECTING A TANK TO HOT WATER SYSTEMDRAZICE-OKC-200-NTR-HP-High-Speed-
Water-Heater-fig-7

  • U Shut-off valve
  • P1 Safety valve with backflow flap
  • P2 Safety valve for heating circuit
  • V – Drain valve
  • M Manometer
  • T Three-way valve
  • O Air outlet valve
  • ZK Test tap for monitoring the tightness check valve

A heater with a volume exceeding 200 liters at the outlet hot water piping provides combined temperature and pressure safety fittings according to ČSN EN 1490, or the temperature safety fittings fitted with water temperature sensor placed in the heater or other safety valves DN 20, and the opening overpressure compliant with the maximum operating overpressure of the heater vessel. The safety valve does not replace the safety valve on the cold water inlet. No closing, return armature, and filter may be mounted between the heater and the safety valve.

At fixtures with discharge valve for the potential drain of water from the tank have to be mounted on the cold water inlet of the tank.
The cold water inlet of each individually closable heater must be fitted with a seal, test tap or plug to check the non-return valve, as well as a non- return valve and safety valve. Heaters with a volume of more than 200 liters must also be fitted with a pressure gauge. Each independently closing tank must be further provided on the hot water inlet with a test valve, backflow valve, safety valve and manometer.

PLUMBING FIXTURE

Power water connects to pipes with 3/4″ thread in the bottom part of the tank. Blue – cold water inlet; red – hot water outlet. For potential disconnection of the tank, the sanitary water inlets and outlets must be provided with screw coupling Js 3/4″. The safety valve is mounted on the cold water inlet identified with a blue ring.
Every hot sanitary water pressure tank shall be equipped with a membrane spring loaded with a safety valve. Nominal clearance of safety valves is defined by the standard. Tanks are not equipped with a safety valve. The safety valve shall be easily accessible and fitted as close as possible to the tank. The inlet pipes must have at least the same clearance as the safety valve. The safety valve is placed high enough to secure the dripping water drain by gravity. We recommend mounting the safety valve onto a branch pipe. Easier exchange without the necessity of draining water from the tank. Safety valves with fixed pressure settings from the manufacturer are used for the assembly. The starting pressure of the safety valve must be identical to the maximum allowed pressure of the tank, and at least 20 % higher than the maximum pressure in the water main (Table 7). If the water main pressure exceeds such value, a reduction valve must be added to the system. No closing armature may be mounted between the tank and the safety valve. During the assembly, follow the guide provided by the safety equipment manufacturer.

It is necessary to check the safety valve each time before putting it into operation. It is checked by the manual moving of the membrane from the seat, turning the make-and-break device button always in the direction of the arrow. After being turned, the button must click back into a notch. Proper function of the make-and-break device results in water draining through the safety valve outlet pipe. In regular operation, such a check needs to be carried out at least once a month, and after each shutdown of the tank longer than 5 days. Water may be dripping off the drain pipe of the safety valve; the pipe must be open into the air, pointed down; environment temperatures must not drop below zero. When draining the tank, use the recommended drain valve. First of all, close water inlet in the tank.

Find the necessary pressure values in below Table 7. A backflow valve must be fitted on the inlet pipe to ensure the right operation of safety valve that prevents spontaneous heater draining of the tank and hot water penetration back into the water main. We recommend that the hot water distribution from the tank is as short as possible in order to reduce heat losses. At least one demountable joint must be mounted between the tank and every supply pipe. Adequate piping and fittings with sufficiently dimensioned maximum temperature and pressure values must be used.

Tanks must be provided with a discharge valve mounted on the cold sanitary water inlet to the tank for potential disassembly or repair. When assembling the security equipment, follow the standard.

SAFETY VALVE START-UP PRESSURE [bar]

| ACCEPTABLE OPERATING OVER-PRESSURE OF WATER

TANK [bar]

|

MAXIMUM  PRESSURE IN COLD WATER PIPES [bar]

---|---|---
6| 6| up to 4,8

CONNECTION OF TANK TO HOT WATER DISTRIBUTION SYSTEM

The tank is placed on the floor next to the heating source or in its proximity. The heating circuit shall be connected to marked tank exchanger inputs and outputs, and bleeder valve installed at the highest point. It is necessary to install a filter into the circuit in order to protect pumps, three-way valve, backflow flaps and the exchanger from sedimentation. It is recommended to flush the heating circuit before the assembly. All wiring connections must be properly insulated from heat. If the system works with priority heating of HUW using a three-way valve, always follow the installation instructions of the three-way valve’s manufacturer.
Example of group connection of tanks by Tichellman method for equal HSW withdrawal of from all tanks DRAZICE-OKC-200-NTR-HP-High-Speed-Water-Heater-
fig-8

  • OV – Heating water
  • SV – Cold water
  • C – Circulation
  • TUV – Hot sanitary water
  • 1 – Back pressure valve
  • 2 – Pump

CLEANING OF TANK AND EXCHANGE OF ANODE ROD
Repetitive water heating causes limestone sediment on both the enameled tank walls and chiefly the flange lid. The sedimentation depends on the hardness of water heated, its temperature, and amount of hot water consumed.
We recommend checking and cleaning the vessel from scale and eventual replacement anode rod after two years of operation

The anode life is theoretically calculated for two years of operation; however, it changes with water hardness and chemical composition in the place of use. Based on such an inspection, the next term of anode rod exchange may be determined. Have a company in charge of service affairs deal with the cleaning and exchanging of the anode. When draining water from the tank, the combination faucet valve for hot water must be open, preventing the occurrence of under-pressure in the tank receptacle which would stop water from draining.

To prevent the occurrence of bacteria (e.g. Legionella pneumophila) within stack heating it is recommended, if absolutely necessary, to increase the temperature of hot sanitary water (HSW) periodically for a transitional period of time to at least 70 °C. It is also possible to make use of another way of disinfecting HSW.

PROCEDURE OF EXCHANGING ANODE ROD IN THE UPPER PART OF THE TANK

  1. Turn off the control voltage to the tank

  2. Drain water from 1/5 tank.
    PROCEDURE:

    • Close the water inlet in the tank
    • Open the hot water valve on the combination faucet.
    • Open the drain tap of the tank
  3. Anode is screwed in under the plastic cover in the upper lid of the tank

  4. Unscrew the anode using an adequate wrench

  5. Pull the anode out and follow reversed steps to install a new one

  6. During the fitting, make sure the grounding cable (300 l) is connected properly; this is the condition of the anode’s proper functioning

  7. Fill the tank with water

PROCEDURE OF EXCHANGING ANODE ROD IN SIDE FLANGE

  1. Turn off control voltage to the tank

  2. Drain water from the tank.
    PROCEDURE:

    • Close water inlet in the tank
    • Open the hot water valve on the combination faucet.
    • Open the drain tap of the tank
  3. One anode is screwed in under the plastic cover in the upper lid of the tank, and the other one is screwed in on the side flange

  4. Unscrew the anode using an adequate wrench

  5. Pull the anode out and follow reversed steps to install a new one

  6. Fill the tank with water

SPARE PARTS

  • magnesium anode
  • contact thermometer
    When ordering spare parts always state the name of the part, the type and type number from the tank’s plate.

IMPORTANT NOTICES

IMPORTANT NOTICES
Without a proof issued by a professional company about performed electrical and plumbing fixtures, the warranty shall be void.
The protective magnesium anode must be checked regularly and replaced, if necessary.
No closing armature may be mounted between the tank and the safety valve.
All outlets of hot water must be equipped with combination faucets.
Prior to first filling the tank with water we recommend that the receptacle’s flange connection nuts are tightened.

INSTALLATION REGULATIONS
Both the electric and water installation must follow and meet the requirements and regulations relevant in the country of use!

DISPOSAL OF PACKAGING MATERIAL AND NON- FUNCTIONING PRODUCT
A service fee for providing return and recovery of packaging material has been paid for the packaging in which the product was delivered. The service fee was paid pursuant to Act No 477/2001 Coll., as amended, at EKO-KOM a.s. The client number of the company is F06020274. Take the water tank packages to a waste disposal place determined by the municipality. When the operation terminates, disassemble, and transport the discarded and unserviceable heater to a waste recycling center (collecting yard), or contact the manufacturer.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Drazice User Manuals

Related Manuals