meRcia 02TUL411411DP-V5-PEFC Poppy Playhouse Tulip Playhouse Instruction Manual
- June 5, 2024
- Mercia
Table of Contents
meRcia 02TUL411411DP-V5-PEFC Poppy Playhouse Tulip Playhouse
General Instructions
WARNING: Only for domestic use Not suitable for children under 36 months due to small parts and danger of falling from heights. To be used under direct supervision of an adult
BEFORE YOU START PLEASE THE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed in the parts list provided.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
- Ensure you have enough time to build the product to ensure the building is water tight.
TIMBER
As with all-natural materials, timber can be affected by various weather
conditions. For the duration of heavy or extended periods of rain, swelling of
the wood panels may occur. Warping of the wood may also occur during excessive
dry spells due natural processes. Unfortunately, these processes cannot be
avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of hot weather and sheltered as
much as possible during rain or snow.
Our buildings are pre-treated with a water-based treatment**; this only helps
to prevent discoloration whilst in stock. To validate your guarantee and
ensure longevity of the product, it is ESSENTIAL the building is treated with
a suitable preservative in accordance with the manufacturers recommendations.
Care must be taken to ensure the product is placed on a suitable base.
We recommended using a suitable protection for your playhouse. As the product
is destined for use by children, a water based treatment that is EN71 tested
for children is ESSENTIAL.
We also recommend treating the building prior to construction.
POSITIONING YOUR PLAYHOUSE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
We recommend a minimum space of 2m around a playhouse, away from any structure
or obstructions such as fences, garages, houses, overhanging branches, washing
lines or electrical wires.
It is recommended that the position of the Playhouse, Slide and Swing is not
in direct sunlight.
Activity toys such as swings and slides for towers shall not be installed over
concrete, asphalt or any hard surface.
BUILDING A BASE
Ensure the base is level and is built on firm ground, to prevent distortion,
checking with a spirit level. Refer to diagrams for the base dimensions. The
base should be slightly smaller than the external measurement of the building,
i.e. The cladding should overlap the base, creating a run off for water. It is
also recommended that the floor be at least 25mm above the surrounding ground
level to avoid
flooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
- Wooden base.
WARNING
- ONLY SUITABLE FOR DOMESTIC USE.
- TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.
- THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY. ANY MODIFICATIONS SHOULD BE DETERMINED BY THE MANUFACTURER AND CARRIED OUT ACCORDING TO THE INSTRUCTIONS.
- DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.
- MAX AGE OF 14 YEARS.
- THIS TOY IS FOR OUTDOOR USE ONLY.
- USE A WATER BASED TREATMENT THAT IS EN71 TESTED
CAUTION
- Wood is a natural product and can change post-manufacture. So despite every effort being made to ensure the material used are cut and machined to a clean and smooth finish, care must be taken when handling the product and preparing for use by your child.
- Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a smoother finish. Alternatively, call the customer service department who will be happy to arrange replacement panels/parts.
- All buildings should be erected by atleast two adults.
- DO NOT ALLOW CHILDREN TO ASSIST.
- To prevent damage during assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.
- Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
- For ease of assembly, you will need a tape measure to check dimensions of components.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.
Protim Aquatan T
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building
as been treated by the correct application of Aquatan solution and then
allowed to dry.
Aquatan is a decorative finish to colour the wood, which is applied
industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos
mixture of sodium dioctyl sulfosuccinate and alcohols: 2, 4,
6-trichlorophenol.
Overall Dimensions: Width = 1544mm Depth = 1844mm Height = 1534mm
Base Dimensions: Width = 1512mm Depth = 1490mm
Poppy Playhouse Door and Window Pack
Tulip Playhouse Door and Window Pack
Pre Assembly
Before assembling remove the transportation blocks from the bottom of each
panel.
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.
Step 1 Parts needed 19 & 20
To fix the Windows (No. 20) into the panels that accomodate a window. First
fix the Window Block to the Window as shown with 1x30mm screw.
Place the Window into the window hole and fix by screwing though the Window
Block (No. 19) with 2x30mm screws as shown. Screw into the Window first.
18x30mm screws.
Step 2 Parts needed 6 & 7 & 8
Lay the Floor Joists (No. 7) under the floor OSB with an even space between
each one. Position joists flush on one side of the Floor OSB (No. 6) and mark
centers of joists onto either end . Fix using 4 x 30mm screws per joist.
Place the Veranda Boards (No. 8) along the joists and against the floor sheet.
Spread them evenly making sure the end board is flush with the framing. Fix
using 2 x 30mm screw for each board along the dotted lines shown on the
illustration.
50x30mm screws
Step 3 Parts needed 2 & 4
Fix the corners with 50mm screws as shown in diagram. Do not secure the
building to the floor until the roof is fitted.
Position the Plain Gable (No. 4) and Left Window Side (No. 2) so there is
equal spacing between the floor and cladding on all 4 sides. 3x50mm screws
Step 4 Parts needed 1 & 3
Attach the remaining Right Window Side (No. 3) and Door Gable (No. 1) using the same method as shown previously. Fix with 3x50mm screws at each corner. 9x50mm screws
Step 5 Parts needed 9 & 16
Place the Ridge Bar (No. 9) in between the door and plain gable. Ensure the
top corners of the support bar are flush with each top point (see
illustration).
Secure in place using a L bracket (No. 16) on each end and 4x30mm screws per
brace. 8x30mm screws
Step 6 Parts needed 5 & 12
Fix two eaves frames (No. 12) to each roof OSB sheet using 3x30mm screws per
eave.
Fix the Roof sheets (No. 5) to the roof ensuring they come together at the top
using 40mm screws directly through the roof sheet at the top. Make sure to
attach the roofs to the ridge bar. 6x30mm screws 24x40mm screws
Step 7 Parts needed 13
Fit the Fascia Block (No. 13) to the front of the building using 4x30mm screws, make sure it is flush with the outside edge of each roof sheet.
Step 8 Parts needed 5 & 6
Once the roof (No.5) is fixed attach the building to the floor (No.6) with 50 mm screws making sure to screw into the Floor bearers. 20x50mm screws
Step 9
Cut the Felt into 3 sheets and lay onto roof as shown in diagram ensuring
there is a 50mm overhang around the sides.
Fix using felt tacks at 100mm intervals. 60x Felt Tacks
Step 10 Parts needed -10
At the back of the building, fix the two Cover Trims (No. 10) to either end of
the side panels.
Use 3x30mm screws per trim. 6x30mm screws
Step 11 Parts needed 11 & 18
Fix Fascias (No. 11) and Finials (No. 18) using 40mm screws.
Pre drill holes to avoid splitting. Ensure to the trap the felt between the
fascia and building. 12x40mm screws
Step 12 Parts needed 22
Place a Window Cross (No. 22) against the inside of each window. Position the
frame centrally to the window and fix using 4x20mm screws per frame.
12x20mm screws.
Poppy Playhouse Door Instructions
Step 13 Parts needed 21 & 23
Remove the top rail of the door (No. 21) by unscrewing the two screws, one on
each side of the door. Keeping the screws to one side.
With the top rail of the door removed peel off the film from both sides of the
styrene. Slide the door cross (No. 23) into the door channel along side the
styrene. Place the door top rail back ontop of the door, fix back in place
using the screws removed.
Step 14 Parts needed 17 & 21
Position the door centrally to the door (No. 21) aperture ensuring any gap is equal on both sides. Once you are happy the door is in the correct position place a Hinge (No. 17) at the top and bottom of the door, ensuring the screws will go into the framing (in cases where you have been supplied three hinges use the third in the middle of the door) and using 30mm black screws fix the hinge to the door and the door gable.14x30mm Black screws
Step 15 Parts needed 14 & 15
Place the Wooden Door Handle (No. 14) on the outside of door and use a 60mm
screw from the inside to secure. Pre-drill hole first to avoid splitting.
On the inside of the door opening fix the Ply Door Stop (No. 15) to the bottom
left corner using 3x20mm screws. 3x20mm screws.
Step 13 Parts needed 17 & 21
Position the door centrally to the Door (No. 21) aperture ensuring any gap is equal on both sides.Once you are happy the door is in the correct position place a Hinge (No. 17) at the top and bottom of the door, ensuring the screws will go into the framing (in cases where you have been supplied three hinges use the third in the middle of the door) and using 30mm black screws fix the hinge to the door and the door gable.14x30mm Black screws
Step 14 Parts needed 14 & 15 & 23 & 24
Place the Wooden Door Handle (No. 14) on the outside of door and use a 60mm
screw from the inside to secure. Pre drill hole first to avoid splitting. On
the inside of the door opening fix the Ply Door Stop (No. 15) to the bottom
left corner using 3x20mm screws.
Sandwich the Door Styrene (No. 24) between the Door ‘s hole and Door Flower
(No. 23) then fix using 3 x 16mm screws. Ensure the glazing covers the cut out
and the screws do not crack hit the glazing. 3x20mm screws 3x16mm screws
It is ESSENTIAL that you apply wood tr -eat ment immediately after the
building has been assembled.
AFTER TREATMENT: score around protective cover on glazing and carefuly
peel covering back
Playhouse Maintenance:
It is recommended that the following checks and maintenance are carried out at the begin-ning of each season as well as at regular intervals during the usage season.
- Check all nuts /bolts/ screws for tightness and tighten when required.
- Check for movement/opening of wood giving rise to the protrusion of nail heads and tips.
- Check hinges.
- Replace defective parts in accordance with the manufacturer’s instructions.
- Check any crossbeams, suspensions and anchors.
- If a swing is included; check the swing seat, chains and ropes.
IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD
In all instances for assistance with your product, please contact customer care on : 01636 880514 or customerservice@merciagp.co.uk
- Mercia Garden Products Limited, Sutton On Trent,
- Newark,
- Nottinghamshire,
- NG23 6QN
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>