APsystems YC1000-3 3-Phase Microinverter up to 4 Panels User Manual
- June 5, 2024
- APsystems
Table of Contents
YC1000-3 3-Phase Microinverter up to 4 Panels
Installation / User Manual
APsystems YC1000-3 3-Phase Microinverter
(For Europe)
ALTENERGY POWER SYSTEM Inc. emea.APsystems.com
APsystems Europe Rue des Monts dor ZAC de Folliouses Sud-Les Echets 01700
Miribel, France TEL: +33-481 65 60 40 EMAIL:info.emea@APsystems.com
Please scan the QR code to get mobile app and more support to help the
installation.
© All Rights Reserved
Table of Contents
Important Safety Instructions………………………………………………………………………………………2
Radio interference statement…………………………………………………………………………………………………….. 2 Safety
Instructions……………………………………………………………………………………………………………………….. 3 Symbols replace
words on the equipment, on a display……………………………………………………….. 4
APsystems YC1000-3 System Introduction……………………………………………………………….5 APsystems
Three-phase Microinverter YC1000-3…………………………………………………… 7 APsystems
Microinverter System Installation………………………………………………………….. 8
Additional Installation components from APsystems……………………………………………………………. 8
Required Parts and Tools from you……………………………………………………………………………………………8
Installation Procedures………………………………………………………………………………………………………………… 9
Step 1 – Lay the AC bus according to the arrangement of APsystems
Microinverter… 9 Step 2 – Attaching the APsystems Microinverters to the
Racking………………………………… 9 Step 3 – Connecting the APsystems Microinverter AC
Cables to the AC bus cable… 10 Step 4 – Connecting APsystems Microinverters to
the PV Module………………………………11 Step 5 – Install a Bus Cable End Cap at the end of
AC bus cable……………………………….. 11 Step 6 – Installing the AC Branch Circuit
Junction Box………………………………………………….12 Step 7 – Completing the APsystems
Installation Map…………………………………………………….12 Step 8 – Place a Warning
Notice………………………………………………………………………………………..13
APsystems microinverter system operating instructions…………………………………….. 14
Troubleshooting……………………………………………………………………………………………………………15
Status Indications and Error Reporting……………………………………………………………………………………15
Troubleshooting a non-operating APsystems Microinverter……………………………………………….. 16
Replace a microinverter………………………………………………………………………………………………17 Technical
Data……………………………………………………………………………………………………………… 18
YC1000-3 3-Phase Microinverter Datasheet………………………………………………………………………….. 19
Sample Wiring Diagram – Three Phase…………………………………………………………………………………….20
YC1000-3 Accessory…………………………………………………………………………………………………… 21
Wiring Diagram…………………………………………………………………………………………………………………………… 21 Accessories
Summary…………………………………………………………………………………………………………………22
APsystems YC1000-3 Installation/User Manual
1
Important Safety Instructions
This manual contains important instructions to follow during installation and
maintenance of the APsystems Photovoltaic Grid-connected Inverter
(Microinverter). To reduce the risk of electrical shock and ensure the safe
installation and operation of the APsystems Microinverter, the following
symbols appear throughout this document to indicate dangerous conditions and
important safety instructions. SAVE THESE INSTRUCTIONS! This manual contains
important instructions for models YC1000-3 that must be followed during
Installation and maintenance of the Photovoltaic Grid-connected Inverter.
Specifications subject to change without notice – please ensure you are using
the most recent update found at www.APsystems.com
This indicates a situation where failure to follow instructions may cause a
serious hardware failure or personnel danger if not applied appropriately. Use
extreme caution when performing this task.
This indicates information that is important for optimized Microinverter
operation. Follow these instructions closely.
Pollution degree 1 no pollution or only dry, non-conductive pollution occurs.
The pollution has no influence.
Radio interference statement
CE EMC ComplianceThe equipment can comply with CE EMC, which are designed to
protect against harmful interference in a residential installation. The
equipment could radiate radio frequency energy and this might cause harmful
interference to radio communications if not following the instructions when
installing and using the equipment. But there is no guarantee that
interference will not occur in a particular installation. If this equipment
causes harmful interference to radio or television reception, the following
measures might resolve the issues: A) Relocate the receiving antenna and keep
it well away from the equipment. B) Consult the dealer or an experienced
radio/TV technical for help.Changes or modifications not expressly approved by
the party responsible for compliance may void the user’s authority to operate
the equipment.
APsystems YC1000-3 Installation/User Manual
2
Important Safety Instructions
Safety Instructions
Do NOT disconnect the PV module from the APsystems Microinverter without first
disconnecting the AC power.
Only qualified professionals should install and/or replace APsystems
Microinverters. Perform all electrical installations in accordance with local
electrical codes. Before installing or using the APsystems Microinverter,
please read all instructions and
cautionary markings in the technical documents and on the APsystems
Microinverter system and the solar-array. Be aware that the body of the
APsystems Microinverter is the heat sink and can reach a temperature of 80°C.
To reduce risk of burns, do not touch the body of the Microinverter. Do NOT
attempt to repair the APsystems Microinverter. If it fails, contact APsystems
Customer Support (61 (0)2 8034 6587) to obtain an RMA number and start the
replacement process. Damaging or opening the APsystems Microinverter will void
the warranty. Do NOT expose the connection to directed, pressurized liquid
(water jets, etc.). Do NOT expose the connection to continuous immersion. Do
NOT expose the AC connector to continuous tension (e.g., tension due to
pulling or bending the cable near the connection). Use only the connectors and
cables provided. Do NOT allow contamination or debris in the connectors. Use
the cable and connectors only when all parts are present and intact. Use the
terminator to seal the conductor end of the Engage Cable; no other method is
allowed.
APsystems YC1000-3 Installation/User Manual
3
Important Safety Instructions
Symbols replace words on the equipment, on a display
Dangerous electrical voltage This device is directly connected to public grid,
thus all work to the inverter shall only be carried out by qualified
personnel. NOTICE, danger! This device directly connected with electricity
generators and public grid. Danger of hot surface The components inside the
inverter will release a log of heat during operation, DO NOT touch aluminum
housing during operating. An error has occurred Please go to Chapter 10
“Trouble Shooting” to remedy the error. This device SHALL NOT be disposed of
in residential waste Please go to Chapter 9 “Recycling and Disposal” for
proper treatments.
CE mark is attached to the solar inverter to verify that the unit follows the
provisions of the European Low Voltage and EMC Directives.
Etiquette Onduleur.
Qualified personnel
Person adequately advised or supervised by an electrically skilled person to enable him or her to perceive risks and to avoid hazards which electricity can create. For the purpose of the safety information of this manual, a “qualified person” is someone who is familiar with requirements for safety, refrigeration system and EMC and is authorized to energize, ground, and tag equipment, systems, and circuits in accordance with established safety procedures. The inverter and endues system may only be commissioned and operated by qualified personnel.
APsystems YC1000-3 Installation/User Manual
4
APsystems YC1000-3 System Introduction
The APsystems Microinverter is used in utility-interactive grid-tied
applications, comprised of three key elements:
APsystems Microinverter APsystems Energy Communication Unit (ECU) APsystems
Energy Monitor and Analysis (EMA) web-based monitoring and analysis
system
PV Modul e
PV Modul e
Microinverter
Zigbee
ECU
Junction box
AC Distribution Box
Compliant with local PV and electrical Legulation
Figure 1
Switch off electromechanical relay embedded complying with VDE126-1-1 and G83.
APsystems YC1000-3 Installation/User Manual
5
APsystems YC1000-3 System Introduction
This integrated system improves safety; maximizes solar energy harvest;
increases system reliability, and simplifies solar system design,
installation, maintenance, and management.
APsystems Microinverters maximize PV energy production
The APsystems microinverter ensures top performance from the array by
maximizing the performance of the module within the array when PV modules in
the array are affected by shading.
More reliable than centralized or string inverters
The distributed microinverter system ensures that no single point of system
failure exists across the PV system. APsystems microinverters are designed to
operate at full power at ambient temperatures of up to +65°C (+149° F). The
inverter housing is designed for outdoor installation and complies with the
IP67 environmental enclosure rating.
Simple to install
You can install individual PV modules in any combination of module quantity,
orientation, different type and power rate (check on-line module compatibility
or contact APsystems).
Smart system performance monitoring and analysis
The APsystems Energy Communication Unit (ECU) is installed by simply plugging
it into any wall outlet and providing it with an Ethernet or Wi-Fi connection
to a broadband router. After installing and setting the ECU (see ECU manual),
the full network of APsystems Microinverters automatically reports to the
APsystems Energy Monitor and analysis (EMA) web server. The EMA software
displays performance trends, informs you of abnormal events, and controls
system shutdown when it is needed. Reference the ECU Manual for installation
and operation instructions.
APsystems YC1000-3 Installation/User Manual
6
APsystems Three-phase Microinverter YC1000-3
The APsystems YC1000-3 Microinverters connect with the Three-phase grid, and operate with most 60, 72, 84 and 96 cell PV modules. For more information, please see the Technical Data page (p.18) of this manual.
Model Number
YC1000-3
AC grid 230/400V – 50Hz
PV Module
60,72,84, 96 Cell
Max. # Per branch
12 per 20A×3 Breaker for 2.5mm2 AC BUS
Module Connector
MC-4 Compatible or Customize
APsystems YC1000-3 Installation/User Manual
7
APsystems Microinverter System Installation
A PV system using APsystems Microinverters is simple to install. Each
Microinverter easily mounts on the PV racking, directly beneath the PV
module(s). Low voltage DC wires connect from the PV module directly to the
Microinverter, eliminating the risk of high DC voltage. Installation MUST
comply with local regulations and technical rules.
1 Perform all electrical installations in accordance with local electrical
codes. 2 Be aware that only qualified professionals should install and/or
replace
APsystems Microinverters. 3 Before installing or using an APsystems
Microinverter, please read all instructions
and warnings in the technical documents and on the APsystems Microinverter
system itself as well as on the PV array. 4 Be aware that installation of this
equipment includes the risk of electric shock. 5 Do not touch any live parts
in the system, including the PV array, when the system has been connected to
the electrical grid. 6 Electrical Installation & Maintenance shall be
conducted by licensed electrician and shall comply with national wiring rules.
Strongly recommend to install Surge protection Devices in the dedicated meter
box.
Additional Installation components from APsystems
Bus Cable End Cap (sold separately) Bus Cable T-CONN Cap(sold separately)
Required Parts and Tools from you
In addition to your PV array and its associated hardware, you will need the
following items: An AC connection junction box Mounting hardware suitable for
module racking Sockets and wrenches for mounting hardware A Phillips
screwdriver A torque wrench
APsystems YC1000-3 Installation/User Manual
8
Installation Procedures
APsystems Microinverters are designed to only operate when they can sense
power coming from the grid. Even if they are plugged into the solar array,
they will not turn themselves on until they can read power from the grid.
Do NOT connect APsystems Microinverters to the utility grid or energize the AC
circuit until you have completed all of the installation procedures as
described in the following sections.
Step 1 – Lay the AC bus according to the arrangement of APsystems
Microinverter
Step 2 – Attaching the APsystems Microinverters to the Racking
M8
(not supplied by APsystems)
Figure 2
a. Mark the location of the Microinverter on the rack, with respect to the PV
module junction box or any other obstructions.
b. Mount one Microinverter at each of these locations using hardware
recommended by your module racking vendor.
Prior to installing any of the microinverters, verify that the utility voltage
at the point of common connection matches the voltage rating on microinverter
label.
Do not place the inverters (including DC and AC connectors)Where exposed to
the sun, rain or snow, even gap between modules. Allow a minimum of
3/4”(1.5cm.) between the roof and the bottom of the Microinverter to allow
proper air flow.
APsystems YC1000-3 Installation/User Manual
9
Installation Procedures
Step 3 – Connecting the APsystems Microinverter AC Cables to the AC bus cable
Click Figure 3
Cover all unused T connectors with Bus Cable T-CONN Cap to protect the T
connectors.
AC connector interface as follows, from left to right PE, N, L3, L2, L1.
Figure 4
PE N L3 L2 L1
Figure 5
APsystems YC1000-3 Installation/User Manual
10
Installation Procedures
Step 4 – Connecting APsystems Microinverters to the PV Module
Place the PV modules into position on the racking and connect the DC input
cables to the microinverters based on optimum layout configuration (up to four
PV modules per microinverter).
CH4 CH3 CH2 CH1
Figure 6
The status LED for on each microinverter will blink green three (3) times to indicate normal operation once DC power is applied.It is important to understand that this “start up” sequence occurs once the first module is connected to the microinvert and is successfully generating DC power. The “start up” sequence does NOT reoccur as additional modules are connected to the same microinverter.
Step 5 – Install a Bus Cable End Cap at the end of AC bus cable
aWire stripping
cInsert five wires into the core wires hole of the body.
bSet the parts on the cable.
dInsert seal and Clamp Finger into the body ,then tighten the nut, torque 2.5±0.5NM.
Figure 7
APsystems YC1000-3 Installation/User Manual
11
Installation Procedures
Step 6 – Installing the AC Branch Circuit Junction Box
Figure 8
a. Install an appropriate junction box at a suitable location on the PV
racking system (typically at the end of a branch of modules).
b. Connect the open wire end of the AC bus cable into the junction box using
an appropriate gland or strain relief fitting.
c. Wire the conductors of the AC bus: L1- BROWN; L2 – BLACK; L3 – GRAY; N –
LIGHT BLUE; PE YELLOW GREEN.
d. Connect the AC branch circuit junction box to the point of utility
Interconnection.
The neutral line from the inverter is NOT allowed to be floating, MUST be
connected to grid.
Wiring colour code can be different according local regulation, check all the
wires of the installation before connecting to the AC bus to be sure they
match.Wrong cabling can damage irreparably the microinverters, such an issue
is not covered by the warranty.
Double check to make sure all of the AC and DC wiring has been correctly
installed. Ensure that none of the AC and/or DC wires are pinched or damaged.
Make sure that all of the junction boxes are properly closed.
Step 7 – Completing the APsystems Installation Map
Fill in the APsystems Warranty Cards, which provide system information and the
installation map. Feel free to provide your own layout if a larger or more
intricate installation map is required. The layout map provided is designed to
accommodate labels in vertical or horizontal orientation to meet all the field
PV connections.
a. Each APsystems microinverter has removable serial number labels. Peel
labels off, and affix one to the respective location on the APsystems
installation map, and affix another to the PV module frame which is easy to
see.The warranty cards can be obtained from the appendix of this manual or
APsystems website: www.APsystems.com
YC1000-3 Installation/User Manual
12
Installation Procedures
b. Fill out the warranty cards and email to APsystems at
support@APsystems.com. c. Register the system using your Installer Account on
the APsystems EMA. You can
then use the EMA website to view detailed performance of the PV system.
Figure 9
1. Step 17 can change sequence for convenience of installation. 2.
Installation map is located in Appendix last page of this manual.
Step 8 – Place a Warning Notice
A warning notice shall be placed in such a position that any person gaining
access to live parts will be warned in advance of the need to isolate those
live parts from all points of supply. Special attention should be paid that
the power supply, measuring circuits (sense lines) and other parts may not be
isolated from the network when the switch of the interface protection is open.
As a minimum, warning labels shall be placed:
On the switchboard (DNO panel and consumer unit) that has the micro-generator
connected to it;
On all switchboards in between the consumer unit and the micro-generator
itself; On, or in the micro-generator itself; At all points of isolation for
the micro-generator.
Figure 10
APsystems YC1000-3 Installation/User Manual
13
APsystems microinverter system operating instructions
To operate the APsystems microinverter PV system:
1. Turn ON the AC circuit breaker on each microinverter AC branch circuit. 2.
Turn ON the main utility-grid AC circuit breaker. Your system will start
producing power
after a five-minute safety delay period. 3. The APsystems Microinverters will
start to send performance data over wireless to the
ECU. The time required for all the microinverters in the system to report to
the ECU will vary with the number of microinverters in the system. You can
verify proper operation of the APsystems Microinverters via the ECU. See the
ECU Installation and Operation Manual for more information.
APsystems YC1000-3 Installation/User Manual
14
Troubleshooting
Qualified personnel can use the following troubleshooting steps if the PV
system does not operate correctly:
Status Indications and Error Reporting
Start up LED
Three (3) short green blinks, when DC power is first applied to the
microinverter, indicates a successful microinverter start up. It is important
to understand that this “start up” sequence occurs once the first module is
connected to the microinvert and is successfully generating DC power.
The”start up” sequence does NOT reoccur as additional modules are connected to
the same microinverter.
Operation LED
Flashing Slow Green (10 sec. gap) – Producing power and communicating with ECU
Flashing Fast Green (2 sec. gap) – Producing power and not communicating with
ECU over 60 minutes Flashing Red – Not producing power Steady Red – Electrode
assembly ground fault protection
Other Faults
All other faults are reported to the ECU. Refer to the ECU Installation and
Operation Manual for a list of additional faults and troubleshooting
procedures.
Only qualified personnel should directly handle the APsystems microinverter.
1 Never disconnect the DC wire connectors under load. Ensure that no current
is flowing in the DC wires prior to disconnecting. An opaque covering may be
used to cover the module prior to disconnecting the module.
2 Always disconnect AC power before disconnecting the PV module wires from the
APsystems microinverter.
3 The APsystems microinverter is powered by PV module DC power. Make sure you
disconnect and reconnect the DC connections to watch for the three short LED
flashes indicating start up.
APsystems YC1000-3 Installation/User Manual
15
Troubleshooting
Troubleshooting a non-operating APsystems Microinverter
To troubleshoot a non-operating APsystems Microinverter, Follow the steps
below in order:
1. Verify the utility voltage and frequency are within ranges shown in the
Technical Data section of this manual.
2. Check the connection to the utility grid. Verify utility power is present
at the inverter in question by removing AC, then DC power. Never disconnect
the DC wires while the microinverter is producing power. Re-connect the DC
module connectors and watch for three short LED flashes.
3. Check the AC branch circuit interconnection between all the
microinverters. Verify each inverter is energized by the utility grid as
described in the previous step.
4. Make sure that any AC breaker are functioning properly and are closed. 5.
Check the DC connections between the microinverter and the PV module. 6.
Verify the PV module DC voltage is within the allowable range shown in the
Technical
Data of this manual. 7. If the problem persists, please call APsystems
Technical Support.
Do not attempt to repair the APsystems microinverter. If troubleshooting
methods fail, please call APsystems Customer Support.
APsystems YC1000-3 Installation/User Manual
16
Replace a microinverter
Qualified personnel can use the following troubleshooting steps if the PV
system does not operate correctly:
Follow the procedure to replace a failed APsystems Microinverter.
A. Remove the APsystems microinverter from the PV Module, in the following
order: 1. Disconnect the AC by turning off the branch circuit breaker. 2.
Cover the module with an opaque cover. 3. Disconnect the first AC connector in
the branch circuit. 4. Disconnect the PV module DC wire connectors from the
microinverter. 5. Remove the Microinverter from the PV array racking.
B. Remove the opaque cover, install a replacement Microinverter to the rack.
Remember to observe the flashing LED light as soon as the new Microinverter is
plugged into the DC cables.
C. Connect the AC cable of the replacement Microinverter. D. Close the branch
circuit breaker, and verify operation of the replacement Microinverter.
APsystems YC1000-3 Installation/User Manual
17
Technical Data
1 Be sure to verify the voltage and current specifications of your PV module
match with those of the Microinverter. Please refer to the datasheet or
usermanual which can be download from APsystems website www.APsystems.com.
2 You must match the DC operating voltage range of the PV module with the
allowable input voltage range of the APsystems Microinverter.
3 The maximum open circuit voltage of the PV module must not exceed the
specified maximum input voltage of the APsystems microinverter.
APsystems YC1000-3 Installation/User Manual
18
YC1000-3 3-Phase Microinverter Datasheet
Region Input Data (DC)
Recommended PV Module Power (STC)Range MPPT Voltage Range Operation Voltage
Range Maximum Input Voltage Startup Voltage Maximum Input Current
Output Data (AC)
3-Phase Grid Type Rated Output Power Maximum Output Power Maximum Output
Current Nominal Output Voltage/Range Adjustable Output Voltage Range Nominal
Output Frequency/Range Adjustable Output Frequency Range Power Factor Total
Harmonic Distortion Maximum Units per Branch
Efficiency
Peak Efficiency CEC Weighted Efficiency Nominal MPPT Efficiency Night Power
Consumption
Mechanical Data
Operating Ambient Temperature Range Storage Temperature Range Dimensions (W x
H x D) AC BUS Maximum Current Weight Enclosure Rating Cooling Maximum Altitude
rating Warranty
Features
Communication
Safety and EMC Compliance
Grid Connection Compliance Transformer Design
Netherlands,France,Portugal,Switzerland
Up to 350 Wp ( 4 Module configuration) Up to 450 Wp ( 3 Module configuration)
16V-55V 16V-55V
60V 22V 14.8A x 4
230V/400V 900W 1130W 1.64A×3
230V×3/184V-253V 149V-278V
50Hz/48Hz-51Hz 45.1Hz-54.9 Hz >0.99 <3%
10units per 20AX3 AC breaker/12units per 25AX3 AC breaker
95.5% 95% 99.9% 300mW
-40 oC to +65 oC -40 oC to +85 oC 259mm x 242mm x 36mm
20A(2.5mm²) 3.5kg IP67
Natural Convection – No Fans All Data At This Technical Specifications Has
Been Tested Under <2000m
10 Years Standard ; 20 Years Optional
Wireless EN 62109-1; EN 62109-2; EN61000-6-1;EN61000-6-2; EN61000-6-3;
EN61000-6-4; EN50549-1,VDE0126-1-1/A1 VFR2019,UTE C15-712-1,ERDF-NOI-RES_13E
High Frequency Transformers, Galvanically Isolated
- Programmable through ECU in field to meet customer need. Depending on the local regulations.
Specifications subject to change without notice – please ensure you are
using the most recent update found at latam.APsystems.com
© All Rights Reserved
2020/11/02 APsystems YC1000-3 Installation/User Manual
Rev1.8 19
Wiring Diagram
Sample Wiring Diagram – Three Phase
SOLAR PANEL
YC1000-3
BRANCH END CAP INSTALLED ON THE END OF AC BUS CABLE
ECU
ENERGY COMMUNICATION UNIT
METER
TO METER OR AC DISTRIBUTION PANEL
AC BUS CABLE
BROWN – L1 BLACK – L2 GRAY – L3 LIGHT BLUE – N YELLOW GREEN – PE
AC ISOLATOR
NEUTRAL
20 AMP CIRCUIT BREAKER PER
BRANCH CIRCUIT
GROUND
DISTRIBUTION PANEL 230V/400V THREE PHASE
Figure 11
APsystems YC1000-3 Installation/User Manual
20
YC1000-3 Accessory
Wiring Diagram
6AC Connector (Male)
7AC Connector (Female)
2Bus Cable End Cap
3Bus Cable T-CONN Cap
5DC Female Connector Cap 4DC Male Connector Cap
Grid 1Bus Cable
8DC Extension Cable
APsystems YC1000-3 Installation/User Manual
21
Accessories Summary
Category
Part NO.
Name
Pic
1
Bus Cable Mandatory
2322304852 2322404852
5C Bus Cable(2.5mm²,2m, BN-BK-GY-BU-YG) 5C Bus Cable(2.5mm²,4m, BN-BK-GY-BU- YG)
2
Bus Cable End Cap Mandatory
3
Bus Cable T-CONN Cap Optional
4
DC Male Connector Cap Optional
5
DC Female Connector CapOptional
6
AC Connector (Male) Optional
7
AC Connector (Female) Optional
2062050005 2061252032 2060401006 2060402006 2300711032 2300812032
5-wire Bus Cable End Cap 5-wire Bus Cable T-CONN Cap DC Male Connector CapMC4 DC Female Connector CapMC4 25A AC Male Connector (EN,5-wire) 25A AC Female Connector (EN,5-wire)
8
DC Extension Cable Optional
2310310274 2310360214
1m DC Extension CableMC4 2m DC Extension CableMC4
APsystems YC1000-3 Installation/User Manual
22
APsystems Microinverter & Energy Communication Unit Installation Card
The APsystems Installation Map is a diagram of the physical location of each
microinverter in your PV installation. Each APsystems microinverter has a
removable serial number label located on the mounting plate. Peel the label
and affix it to the respective location on the APsystems installation map.
Installation Map Template
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 A
B
C
APsystems YC1000-3 Installation/User Manual
23
References
- Home - APsystems EMEA
- APsystems Latin America | El líder global en la tecnología multi-plataforma MLPE
- APsystems | The global leader in multi-platform MLPE technology
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>