GOODWE Lynx Home F Series (HV) User Manual
- June 5, 2024
- GOODWE
Table of Contents
- Lynx Home F Series (HV)
- Disclaimer
- Limitation of Liability
- Updates
- Safety Precaution
- DANGER
- WARNING
- CAUTION
- Transportation:
- EU Declaration of Conformity
- 02 Product Introduction
- 2.2 Symbol Description
- 03 Parts Introduction
- 3.1 Battery System Introduction
- 3.2 Battery Introduction
- 3.3 Base Introduction
- 3.4 Power Control Unit Introduction
- 3.5 Dimensions
- 04 Storage and Package
- 4.2 Packing List
- 5.1 Installation Environment
- 5.2 Space Requirements
- 5.3 Battery System Installation
- Notice
- Notice
- Notice
- 5.4.2 Connecting the Power Cable
- Notice
- Notice
- Notice
- 5.4.3 Connecting the COM Cable
- Notice
- 5.4.4 Install the terminal resistor
- 5.5 Install the protection cover
- 6.1 Check Items Before Switching Power ON
- Check Item
- 6.2 Battery Module Power On
- 6.3 Battery Parameters
- Notice
- 6.4 Indicator Status
- 6.4.1 Normal
- Notice
- 6.4.2 Alarming
- 6.4.3 Faulty
- 6.5 Battery Module Power Off
- 07 Battery Parameters
- 08 Maintenance User Manual V1.0-2022-02-18
- 08 Maintenance
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Lynx Home F Series (HV)
User Manual
Lynx Home F Series (HV)
V 1.2 2022-02-18
Disclaimer
- All the information in this document is the property of the manufacturer. No part of this document could be reproduced in any way for business use. Internal use is allowed.
- The manufacturer makes no representations or warranties express or implied, with respect to this document or any of the equipment and/or software it may describe, including(with no limitation) any implied warranties of utility, merchantability, or fitness for any particular purpose. All such representations or warranties are expressly disclaimed. Neither the manufacturer nor its distributors or dealers shall be liable for any indirect, incidental, or consequential damages under any circumstances.
- The exclusion of implied warranties may not apply in all cases under some statutes, and thus the above exclusion may not apply.
- Specifications are subject to change without notice. Every effort has been made to make this document complete, accurate, and up-to-date. However, the manufacturer may need to make some improvements under certain circumstances without advance notice. The manufacturer shall not be responsible for any loss caused by this document including, but not limited to omission errors, typographical errors, arithmetical errors, or listing errors in this documents.
Limitation of Liability
The manufacturer shall not be liable for any consequences like battery damage or property loss under the following circumstances: · Modify, alter, or replace parts of the battery system without official authorization from the manufacturer.
-
Anyone except technicians from the manufacturer changes or erases the serial number.
-
Establish a battery system that does not meet the criteria, safety regulations, and other
related requirements. -
Non-observance to the User Manual.
-
Improper use or misuse of the battery.
-
Inadequate ventilation.
-
The maintenance routine does not follow accepted standards.
-
Force majeure like earthquakes, storms, thunders, over voltage, or fire hazards, etc.
-
Any external factors.
Updates
The latest document contains all the updates made in earlier issues.
V1.0 2021-09-15
- First release.
V1.1 2021-12-20
- Updated 5.3 Battery System Installation.
V1.2 2022-02-18
- Updated 2.2 Symbol Description.
- Updated 4.2 Packing List.
- Updated 5.4 Electrical Connection.
- Updated 6.4 Indicator Status.
- Updated 07 Battery Parameters.
Safety Precaution
DANGER
- Please keep Power Off before any operations to avoid danger. Strictly follow all safety precautions outlined in this manual and safety labels on the equipment.
- All installation operations should be performed by trained and knowledgeable technical personnel who are familiar with local standards and electric systems. Learn about the product before installation.
- Do not use the battery or the power control unit if it is defective, broken, or damaged. · Do not disassemble, modify, or replace any part of the battery or the power control unit
without official authorization from the manufacturer. · Damaged battery may leak electrolyte. Do not contact with the liquid leakage or volatile
matter. Please contact After-sales Service for help immediately.
WARNING
Anyone contact the leaked substance accidentally has to do as following:
-
Breath in the leaked substance: Evacuate from the polluted area, and seek immediate
medical assistance. -
Eye contact: Rinse your eyes for at least 15 minutes with clean water and seek immediate medical assistance.
-
Skin contact: Thoroughly wash the touch area with soap and clean water, and seek immediate medical assistance.
-
Ingestion: Induce vomiting, and seek immediate medical assistance.
-
Do not move the battery system if it is connected with external battery expansion modules.
Please contact After-sales Service to replace batteries or add batteries.
CAUTION
Transportation:
-
Protect the battery system from damage during transportation and storage.
-
Take the weight of the battery and the power control unit into account and carefully lift the battery and the power control unit.
-
Wear gloves when handling the battery.
-
Do not hit, pull, drag, or step on the battery system or put unrelated items into any part of the battery system.
-
The transportation must be carried out by trained professionals. All operations during the
process have to be recorded. -
Keep the equipment stable to avoid dumping, which can result in equipment damage and
personal injuries. -
In the event of a fire, please make sure that the carbon dioxide extinguisher or Novac1230 or FM-200 is nearby.
-
The fire cannot be put out by water or ABC dry powder extinguisher. Firefighters are required to wear full protective clothing and self-contained breathing apparatus.
-
The battery may explode when the ambient temperature exceeds 150.
-
Please use appropriate tools and take protective measures when installing and maintaining heavy equipment. Improper operations will cause personal injuries.
-
Use professional insulating tools when operating the equipment under high voltage.
-
Place the cables at lease 30mm away from the heating components or heat sources,
otherwise the insulation layer of the cables may be aging or broken due to high temperature. -
Tie the cables of the same type together, and place cables of different types at leas 30mm apart. Do not place the cables entangled or crossed.
EU Declaration of Conformity
User Manual V1.0-2022-02-18
The Battery System sold in the European market meets the following directives and requirements:
- Electromagnetic compatibility Directive 2014/30/EU (EMC)
- Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
- Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
- Waste Electrical and Electronic Equipment 2012/19/EU
- Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH) You can download the EU Declaration of Conformity on https://en.goodwe.com.
02 Product Introduction
2.1 Product Description
- This user manual describes the Lynx Home F Series (HV) Battery System (Battery System for short) in terms of the introduction, application, installation, commission, maintenance, and technical parameters, etc.
- The Battery System consists of the LX F3.3-H Battery Module (Battery Module for short) and LX F-H Power Control Unit (PCU).
- The battery system can be compatible with the following inverter series:
Details of different Battery Systems:
Battery System
|
Number of Battery Module
|
Number of PCU
|
Number of Base
---|---|---|---
LX F6.6-H
|
2
|
1
|
1
LX F9.8-H
|
3
|
1
|
1
LX F13.1-H
|
4
|
1
|
1
LX F16.4-H
|
5
|
1
|
1
2.2 Symbol Description
S ymbol
|
Description
|
Symbol
|
Description
---|---|---|---
|
Potential risks exist. Wear proper PPE before any operations.
|
|
Install the equipment away from fire sources.
|
High voltage hazard. Power off the equipment first before any operations.
|
|
Keep the equipment away from children.
|
Operate the equipment properly to avoid explosion danger.
|
|
No extinguishing with water.
|
The equipment contains corrosive electrolytes. In case of a leak in the equipment, avoid contact the leaked liquid or gas.
|
|
Do not dispose of the equipment with household garbage at its end of life.
|
Read through the user manual before any operations.
|
|
Put the battery in the right place and recycle it in compliance with local environmental regulations.
|
Pay attention to safety protection during installation
|
|
CE Mark
|
RCM Mark
|
|
Grounding. To indicate PE cable connection position.
03 Parts Introduction
3.1 Battery System Introduction
Notice
· Ensure that the PCU is installed above the Battery Module. Do not install
any Battery Modules above the PCU.
· This manual will show you the installation and cable connection of 5 Battery
Modules.
No. 1, 2, 3, 4, 5, 6 7
Parts PCU Battery Module Base
3.2 Battery Introduction
No. Parts
1 Ventilation Valve
2 Rectangular Connector
3.3 Base Introduction
No. Parts
1 Rectangular Connector
2 Grounding Point
3.4 Power Control Unit Introduction
No.
|
Parts
---|---
1
|
Positive Pole of Power
2
|
Negative Pole of Power
3
|
Ventilation Valve
4
|
COM Cable Port
5
|
Grounding Point
6
|
Circuit Breaker
7
|
SOC Indicator
8
|
Button Indicator
9
|
Rectangular Connector
3.5 Dimensions
04 Storage and Package
4.1 Storage Environment
If the equipment is not to be installed or used immediately, please ensure that the storage environment meets the following requirements:
-
Pack the equipment using a packing box and put some desiccant in the box before sealing.
-
Put the equipment back in the packing box if it is not to be installed in 3 days after unpacking.
-
Storage SOC: 25%~50%SOC. Circle the charge-discharge every 3 months.
-
Recommended storage temperature: -20~45(less than one month) or 0~35(less than
one year). -
Recommended storage humidity: 0%~90%RH(no condensation). Do not install the battery if there is any moisture or condensation.
-
Place the equipment in a cool place where away from direct sunlight.
-
Keep the equipment away from flammable, explosive, and corrosive matters.
-
Keep the equipment away from the rain.
4.2 Packing List
- The Battery System consists of the Battery Module, the CPU, and the base.
- Check outer packing for damage and model before unpacking the Battery System. If you find any damage or the model is not what you requested, do not unpack the product and contact the After-sales Service as soon as possible.
- Check whether the deliverables are intact and complete first after unpacking the Battery System. If anything wrong, contact the After-sales Service as soon as possible.
5.1 Installation Environment
- Install the Battery System on a ground with sufficient bearing capacity and flatness. Increase the bearing capacity and flatness of the ground by laying the foundation, adding bearing plates, and so on.
- The optimal working temperature for the Battery System is 20~40.
- Avoid exposing the equipment to direct sunlight or rain.
- Install the equipment away from heat/cold source.
- Do not install the equipment in a place where the temperature changes extremely.
- Install the equipment away from strong interferences to ensure its regular work.
- Keep children away from the equipment.
- Do not install the equipment in places prone to accumulate water.
- Do not put flammable or explosive matters near the equipment.
5.2 Space Requirements
User Manual V1.0-2022-02-18
5.3 Battery System Installation
Notice
-
Make sure that the ground is flat and no inclination.
-
Put the base cling to the floor vertically.
-
Put all the base cling to the wall, and the arrow points outward.
-
Put all the batteries cling to the wall, and the arrows point outwards.
-
Align the holes of the upper and the lower Battery Modules when placing the upper
Battery Module. -
Put the bracket cling to the wall.
-
Watch out for Battery Modules dropping. · Do not install the two locking brackets on one side.
Step1: Take the Battery Module, the Base and the PCU out.
Step2: Install the locking bracket to the base.
Step3: Place the base cling to the wall and mark the drilling positions. Then
move the base.
Step4: Drill a hole in the floor, Diameter 10mm and depth 80mm.
Step5: Screw the expansion bolts to fix the Base. Tightening torque: 10N·m.
Step6: Place the Battery Module on the base.
Step7: Repeat step 1 and 2 to install the second to fifth battery modules from
bottom to top.
Step8: Install the locking bracket.
Step9: Put the PCU above the installed Battery Module securely. Mark the
drilling hole using a marker, then remove the PCU.
Step10: Drill a hole in the wall, Diameter 10mm and depth 80mm.
Step11: Screw the expansion bolts to fix the PCU. Tightening torque: 10N·m.
Notice
-
Shelter the equipment using paperboards when drilling to avoid dust.
-
Put the locking bracket cling to the wall. And the bracket bottom cling to the Battery
Module. -
Watch out for Battery Modules dropping.
5.4 Electrical Connection
5.4.1 Connecting the PE Cable
Notice
- Connect the PE cable first before installing the equipment. Disconnect the PE cable before dismantling the equipment.
- The PE cable should be prepared by customers. The cross-sectional area of the PE cable conductor: 5mm2. The cable should meet standards for outdoor use.
- The drawing force of the cable after crimping should be at least 400N. · Connect the PE cable to the PCU or to the base in the same way.
5.4.2 Connecting the Power Cable
Notice
- Power off the Battery System before connecting the power cable to avoid high voltage danger.
- The DC input cable should be prepared by customers. Connect the red power connector to the red wire harness. And the black power connector to the black wire harness. The cable should meet standards for outdoor use.
- The recommended tool is a manual hydraulic press plier. Crimping height: 7mm, Mould:16mm2 (AWG 6).
- Screw the nut and make sure there is no space.
- Use any one of the two power ports. The reserved one should be protected using a cover.
Notice
- Use a power cable to connect the EHB series inverters and the Battery System. The cross sectional area of the power cable conductor: 16mm2(AWG 6). The strip length of the conductor: 18±1mm. The drawing force of the cable after crimping should be at least 1200N.
- Make sure that the striped conductor is fine and has no burrs.
- The copper tube should be prepared by customers. Copper tube length: 17mm. Copper tube inner diameter: 5.80mm.
Step1: Strip the conductor and put it into the copper tube.
Step2: Crimp the power cable. Step3: Tighten the nut.
Step4: Connect the power cable.
Connecting the Battery Power Cable (Compatible with ET,BT,EH,BH Series Inverters)
Notice
- Use a power cable to connect the ET, BT, EH, and BH series inverters and the Battery System. Replace the white seal ring inside the power connector with a black seal ring before crimping the power cable. Inner diameter 4.59mm. The cross-sectional area of the power cable conductor: 6mm2(AWG 10). The strip length of the conductor: 33±1mm. The drawing force of the cable after crimping should be at least 500N.
- Make sure that the striped conductor is fine and has no burrs.
- The copper tube should be prepared by customers. Copper tube length: 17mm. Copper tube inner diameter: 5.80mm.
Step1: Strip the conductor and fold it in half. Put the folded conductor into
the copper tube.
Step2: Replace the white seal ring inside the power connector with a black
seal ring.
Step3: Crimp the power cable.
Step4: Tighten the nut.
Step5: Connect the power cable.
5.4.3 Connecting the COM Cable
Notice
-
The two communication ports are the same.
-
Connect the cable to any one of the two communication ports. And connect the terminal
resistor to the other port. -
For the EHB series and GE series inverters, the manufacturer does not supply the battery
communication cable. -
Please refer to the following pin definitions if you need to make a new battery
communication cable.
Step1: Disassemble the waterproof module.
Step2: Thread the cable to the waterproof module.
Step3: Connect the communication cable to the Battery Module. Tighten the nut.
5.4.4 Install the terminal resistor
Notice
If the terminal resistor is not installed, the Interlock Failure will occur,
and the system cannot work correctly.
Step1: Disassemble the waterproof module.
Step2: Install the terminal resistor.
Step3: Tighten the nut.
User Manual V1.0-2022-02-18
5.5 Install the protection cover
6.1 Check Items Before Switching Power ON
Check the following items before power on to avoid the System be damaged.
Check Item
1 The inverter is firmly installed in a clean place where is well-ventilated and easy to operate.
2 The PE cable, power cable, communication cable, and terminal resistance are connected correctly and securely.
3 Cable ties are routed properly and evenly, and no burrs.
4 Unused ports and terminals are sealed.
6.2 Battery Module Power On
6.3 Battery Parameters
Select battery model via PV Master after successfully connecting the Battery Module and the inverter.
Notice
“Battery Communication Failure” will be displayed if you select the wrong battery model. Please select the right battery model accordingly.
6.4 Indicator Status
6.4.1 Normal
Notice
- The SOC indicator keeps on when charging.
- The SOC indicator blinks one time when discharging.
6.4.2 Alarming
6.4.3 Faulty
6.5 Battery Module Power Off
Follow the steps to power off the Battery System to avoid the System be damaged.
Method 1: 1. Press the button for at least 15s. 2. Make sure that both the SOC indicator and the button indicator of the control unit are off.
Method 2: 1. Turn off the air switch. 2. Make sure that both the SOC indicator and the button indicator of the control unit are off.
07 Battery Parameters
Technical Data
|
LX F6.6-H
|
LX F9.8-H
|
LX F13.1-H
|
LX F16.4-H
---|---|---|---|---
Usable Energy (kWh)*1
|
6.55
|
9.83
|
13.10
|
16.38
Battery Module
|
LX F3.3-H: 102.4V 3.27kWh
Number of Modules
|
2
|
3
|
4
|
5
Cell Type
|
LFP(LiFePO4)
Cell Configuration
|
64S1P
|
96S1P
|
128S1P
|
160S1P
Nominal Voltage (V)
|
204.8
|
307.2
|
409.6
|
512
Operating Voltage Range (V)
|
182.4~230.4
|
273.6~345.6
|
364.8~460.8
|
456~576
Nominal Dis-/Charge Current (A)*2
|
25
Nominal Discharge Power (kW)*2
|
5.12
|
7.68
|
10.24
|
12.80
08 Maintenance User Manual V1.0-2022-02-18
Communication
|
CAN
---|---
Weight (Kg)
|
115kg
|
158kg
|
201kg
|
244kg
Dimensions (WDH) (mm)
|
600380625
|
600380780
|
600380935
|
6003801090
Operating Temperature (℃)
|
Charge: 0﹤T≤50 ; Discharge: -20﹤T≤50
Storage temperature (℃)
|
20~45 (≤ One Month); 0~35 (≤ One Year)
Humidity(%)
|
≤95
Altitude (m)
|
≤2000
Enclosure Type
|
IP55(Outdoor / Indoor)
Installation Location
|
Ground-Mounted
Standard and Certification
|
Safety
|
IEC62619, CEC
EMC
|
CE, RCM
Transportation
|
UN38.3
*1: Test conditions, 100% DOD, 0.2C charge & discharge at +25±3 °C for battery system at beginning life. System Usable Energy may vary with different Inverter.
*2: Nominal Dis-/Charge Current and power derating will occur related to Temperature and SOC.
08 Maintenance
Item
|
Period
---|---
Check the wall mounting plate, fix it if it is not secured
|
Once every 6 months
Check whether the outer enclosure is broken. Repair the painting or contact After-sales Service if there is any broken.
|
Once every 6 months
Check whether there is an exposed cable. Replace the exposed cable or contact After-sales Service for help.
|
Once every 6 months
Check whether there is debris accumulation around the Battery Module to avoid affecting heat dissipation.
|
Once every 6 months
Check for water and pest to avoid prolonged intrusion.
|
Once every 6 months
WARNING
• Contact After-sales Service for help if you find any problems that may influence the Battery Module or the inverter. Disassemble without permission is strictly forbidden. • Contact After-sales for help if the conductive wire is exposed because high voltage danger exists. Do not touch or disassemble privately.
• In case of other emergencies, contact the After-sales as soon as possible. Operate following the instructions of the After-sales personnel. Or wait for the After-sales operators.
GoodWe Website
PV Master App
GoodWe Technologies Co., Ltd.
No. 90 Zijin Rd., New District, Suzhou, 215011, China www.goodwe.com
service@goodwe.com
340-00627-02
Local Contacts
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>