TTk FG-NET-LL Oil Leak Detection User Guide

June 4, 2024
TTk

TTk FG-NET-LL Oil Leak Detection

TIP: The complete installation notice for this product can be downloaded on TTK’s website by scanning the QR code.
For more information, go to www.ttkuk.com; www.ttkusa.com; www.ttkasia.com.
Astuce: Le manuel d’installation complète de ce produit peut être téléchargé sur le site Web de TTK en scannant le code QR. Pour plus d’informations, www.ttk.fr; www.ttkcanada.com

Mounting the FG-NET-LL Digital Panel

  • Wall-mounted version: affix to the wall (a stencil is provided for drilling the 4 fixing holes).
  • Rack-mounted version: a 4U space is required within a 19” electrical equipment box.
  • We recommend fixing at a height between 5 ft (1.50m) and 6 ft (1.80m), to provide a comfortable height for viewing the touch-screen display.
  • Open the cover of the wall-mounted panel to reach the motherboard as shown in the picture:

Electric Connection 100-240VAC

Power supply 100 – 240 VAC, 50/60 Hz, 1.3A, 50W.
If possible, use a UPS power source. 3 x 16 AWG (1.5 mm²) multi-core electric cable. IMPORTANT : To connect grounding of box to earth: use standardized singlecore 14 AWG (2.5 mm²) earth wire. TTKFG-NET-LL-Oil-Leak-
Detection-3

Connecting the Detection Circuits

Connect the three wires of TTK BUS 8771 standard cable in each circuit, respecting the color code below:
A : Terminal not used, B : White wire, C : Black wire, D : Red wire
Plug each jumper cable into the cable clamp provided. Fix the shielding tightly to the cable clamp to ensure proper grounding.
CAUTION: A poor earth connection removes prevents the shielding from acting as an “electromagnetic screen”. Without the correct earthing, the system may develop faults and false readings. The correct earthing must be maintained. If any circuits are left unused, a shunt (value between 47K and 100K Ohm) must be placed between B and D on the corresponding connector for that circuit, if one is not already there. For more details, refer to the wiring diagram attached to the inside of the FG-NET-LL panel.

Powering up the FG-NET-LL

Close cover before powering up:
During powering up, the panel displays the homepage after start-up is complete. To set up the panel, go to the “Setup” menu.TTKFG-NET-LL-Oil-Leak-
Detection-4

Once in the account, user can change the password.

System Settings

Menu “Setup” on homepage > tab “system”:

  • Change the application language
  • Adjust the date and time
  • Create the user accounts and modify the administrator password. TTKFG-NET-LL-Oil-Leak-Detection-6

Settings the Cable and Relays

Menu “Cables” on Homepage > “Edit” button on each sense cable allows cables and relays to be configured.
Cable settings include:

  • Associate or not a cable with the previous one
  • Set alarm delay time

Relay settings include:

  • Relay type setting: leak or cablebreak
  • Board setting: FG-NET-LL or BBOX/FG-BBOX-LL
  • Relay setting: choose the relay number. TTKFG-NET-LL-Oil-Leak-Detection-8

Verifying the architecture settings

The “cables” menu on the homepage allows the architecture of the installation
to be displayed together with the floor plan associated with each “zone” (optional function). TTKFG-NET-LL-Oil-Leak-
Detection-10

Leak Tests and Simulations

The leak tests and simulations are important for:

  • Verifying the operation of the system
  • Checking the designation of the cables

Verifying consistency between the «as-installed» drawings and the actual floor plan of the installation.
Pour some light Naphta on one cable to simulate a leak alarm. Then remove and allow drying for a few hours (Ref «FG-OD cleaning procedures»). TTKFG-NET-
LL-Oil-Leak-Detection-11

Buy: www.ValinOnline.com|Phone 844-385-3099|Email: [email protected]

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals