IPORT 336-0089 Poe Injector Installation Guide
- June 4, 2024
- IPORT
Table of Contents
IPORT 336-0089 Poe Injector
INSTALLATION GUIDE
- Thank you for purchasing the most elegant solution for permanently mounting an iPad on a wall or other solid surface.
- When installed according to the instructions in this manual, the product will blend into your space and prove easy to use.
BOX CONTENTS
- Installation Guide
- Surface Mount Bezel (a)
- Mounting Bracket (b)
- Suction Cup (c)
- Mounting Screws (d) x 6
- Security Tool (e)
- PoE+ Network Adapter (72101) (f) Or
- PoE+ Adapter (72102) (f)
SYSTEM COMPONENTS (SOLD SE PARA TEL Y)
- PoE+ Injector (72106) (g) Cat6 Cable (up to 300ft)
HARDWARE REQUIREMENTS
- Hardware required for each application scenario is shown below.
Apple, iPad, iPad Air, iPad Pro and Lightning are trademarks of Apple Inc., registered in the U.S. and other countries.
Before Installation
- Ensure the selected wall for installation is free of plumbing or any other obstructions.
Electrical Wall Box for the PoE Splitter
The PoE+ Adapter can be used with US, UK and Euro single-gang electrical
boxes. The recommended depth for the UK electrical box is a minimum of 1.4″
(35mm) and the Euro wall box is a minimum of 1.85″ (47mm).
An open double gang electrical box may be used to allow for flexible wire
management.
For Advanced Installation
iPort offers an elegant solution to integrate the iPad onto any surface. For
advanced surface installation applications such as masonry, and concrete,
please view our application note for installation on our website,
www.iportproducts.com.
For drywall and wood installation, please proceed to the installation steps
noted below.
Preparation for Installation
- Choose your power/wiring scenario:
Accessories required for each power and wiring scenario
PoE+Adapter72102/72101
- The PoE+ Adapter is designed to provide the necessary power to the iPad’s Lightning or USB-C Connector from a PoE+ power source. For more detailed information, see enclosed Diagrams.
PoE + Injector 72106
- The PoE+ injector is designed to provide power via PoE+ (IEEE 802.3at) and is required if there is no other PoE+ Switch or power source.
- When removing the Surface Mount (a) bezel from its box, the bezel will be attached to the (b) mounting bracket. To decouple the (a) bezel from the (b) mounting bracket, place the (a) bezel face up on a flat and smooth surface. With one hand, hold the (b) mounting bracket in place. With your opposite hand, lift the right edge of the (a) bezel and then the left to decouple the magnets. This will help avoid bending of the metal, and prevent any damage to the (a) bezel or (b) mounting bracket.
- Locate the ideal mounting area. For a retrofit installation, locate an existing low-voltage electrical box. For new construction, choose a location for an electrical box. We recommend installing the (a) bezel in landscape orientation, but it can also be installed in portrait orientation.
- Note: A single gang electrical box allows Surface Mount to be used in landscape or portrait orientation. A double-gang electrical box permits landscape orientation only.
- Install the (b) mounting bracket on the wall with the (b) bracket surrounding the electrical box. Use the centre lines as a guide to install the (d) mounting screws. The IPORT specialized (d) mounting screws act as anchors and screws when mounting on a drywall or wood surface.
- Note: Use all six mounting screws for Surface Mount for iPad Pro 12.9″.
- Using a #2 Philips screwdriver and (d) mounting screws, install the first screw in the upper left-hand corner.
- Level the (b) mounting bracket over the wiring location and fasten (b) bracket with the remaining (d) screws. Lining up the (d) mounting screws with the engraved center lines provided on the (b) bracket will allow optimal adjustability. The (b) mounting bracket is now in place.
- Place the Surface Mount (a) bezel face down on a flat and smooth surface with the iPort logo on the left.
- Plug in the provided IPORT USB-C cable directly into the iPad. Position the iPad Face down into the (a) bezel with the iPad cable on the left. Carefully wrap the iPad cable under the retention loop located on the (a) bezel. To lock the iPad in place, use a flat head screwdriver to deploy the second and third toggles located on th right side of the Surface Mount (a) bezel. The first top-right toggle is a power button extension .
- Connect the USB-C to Molex cable into the (f) PoE+ Adapter shown.
- Connect the appropriate power source identified in the Power and Wiring Guide (found in (f) PoE+ Adapter box). Place the PoE splitter into the single gang box located in the wall.
- With the iPad home button facing left or right, the Surface Mount will attach to the (b) mounting bracket with internal magnets.
- To lock the Surface Mount in place, use the (e) security tool provided to engage the security locks. When the bezel is in landscape orientation, the security holes are located on the top-right and bottom-left of the bezel. Rotate the (e) security tool counter-clockwise to engage the locks, and clockwise to unlock the Surface Mount (a) bezel from the (b) mounting bracket.
Removal
The (c) suction cup (provided) is used to remove the iPad and (a) bezel from the (b) mounting bracket. Once the (a) bezel is unlocked from the (b) mounting bracket, depress the (c) suction cup on the corner of the iPad screen and carefully pull the iPad from the wall, while the other hand is supporting the opposite side of the (a) bezel.
POWER & WIRING GUIDE
- Provided are the most common methods of wiring the Surface Mount Systems for power from a PoE+ Switch or PoE+ Injector.
PoE+ Power
Equipment Rack (Home Run)
- Required Surface Mount System Components (Bezel, PoE+ Adapter, Lightning Cable)
Receptacle Power Wall Box & Grommet
- Required Surface Mount System Components: (Bezel, PoE+ Adapter, Lightning Cable)
Warranty information at iportproducts.com/warranty 336-0089 REV C www.iportproducts.com.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>