National Public Seating WS001 Modern 6 Person Hexagonal Workstation Instruction Manual
- June 1, 2024
- National Public Seating
Table of Contents
National Public Seating WS001 Modern 6 Person Hexagonal Workstation
HEXAGON WORKSTATION
COMPONENTS
INCLUDED HARDWARE
TOOLS FOR ASSEMBLY
INSTALLATION INSTRUCTION
Please Note: This installation requires two people.
- Place the Top/Apr A on a clean, flat surface with the tabletop facing down. Install the Attachment Plates 1 by aligning them with the holes on the Apron, then proceed to install three Bolts 2 per Plate using the Allen Key 3.
- With assistance, place the Top/Apron A onto the Base Cabinet B , ensuring Attachment Plates 1 are positioned inside the base. Secure the Apron to the Base using three Bolts 2 per plate.
Note: Access the attachment plates through the doors of the cabinet.
Double-check all bolts are tightened securely before use. Check all bolts periodically. Failure to completely tighten the bolts may result in tipping and possible injury!
Optional Kick Plate Installation:
Place the Kick Plate around the base of the unit. Use included Brackets (x4)
and Screws (x16) to secure it. Drill needed.
Congratulations, your Hexagon Workstation is now assembled and ready to use.
For Power and Sink Installation see follow pages.
HEXAGON WORKSTATION SINK INSTALLATION
COMPONENTS
INCLUDED HARDWARE
TOOLS FOR ASSEMBLY
INSTALLATION INSTRUCTION
-
Apply Silicone Adhesive 6 around the perimeter of the sink cutout on the top surface C1. Gently place the Sink A into the cutout and press into place. Use a cloth to wipe away any excess caulk. Allow the adhesive to set for 24 hours to cure completely.
-
Connect Sink Outlet 1. Secure it with Lock Nut 3 from under the Sink A.
Note: Access the Sink Outlet through the doors of the cabinet. -
Install the Gas/Water Fixtures 2 by placing them into the pre-drilled holes on the top surface. Secure them using the Washers 4 and Lock Nut 5.
Congratulations, your Hexagon Workstation with Epoxy Sink is now assembled and ready to use.
HEXAGON WORKSTATION POWER INSTALLATION
COMPONENTS
TOOLS FOR ASSEMBLY
Ensure that all power cords from the outlets are placed on the inner side of the apron assembly when attaching it to the base cabinet.
INSTALLATION INSTRUCTION
- Mount the Central Power Strip B in the desired location inside the Base Cabinet A. Connect the three Power Cords of the Outlets to the Central Power Strip Surge Protector.
- Use a Hole Saw 1 to create a hole in the desired location, allowing the Surge Protector Cord B to be plugged into a wall or floor outlet.
Congratulations, your Hexagon Workstation with Power is now assembled and ready to use.
Dear Customer, Thank you for your purchase. Although extreme care goes into
the manufacturing & packaging of this product, mistakes are possible. If you
encounter any missing parts or difficulty in assembly, please contact our
customer service Toll-Free at
1-800-261-4112 or
info@nationalpublicseating.com for a
courteous & immediate resolution to your problem.
www.nationalpublicseating.com
1-800-261-4112
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>