FSR CB-MNT1 CB Mounting Kit With 4 x 100 Inch Cables Instruction Manual

June 1, 2024
FSR

FSR CB-MNT1 CB Mounting Kit With 4 x 100 Inch Cables

FSR CB-MNT1 CB Mounting Kit With 4 x 100 Inch Cables

Mounting

  1. Install CB-22+ to a structural ceiling able to support 5x the noted gross weight. Use appropriate mounting methods based on local  building codes. Install safety cable as required by local building codes. Route conduits to box as required.
    INTENDED FOR USE WITH COMMON “T” GRID DROP CEILING AND IS NOT COMPATIBLE WITH ALL DROP CEILINGS.
    Mounting

AC Wiring

  1. To install AC main power into unit, remove AC access plate by removing 4x #8-32 screws, as shown. Wiring must be performed by a qualified electrician only. Wiring must be done in accordance with all NEC and other applicable codes. Re-install AC access plate after AC wiring is complete.

Door Removal

  1. Turn latch to open door (unlock if needed). (a) Push door up towards ceiling and (b) push towards shelf – reverse procedure to install. Disconnect safety cable to  completely remove door. Installation of 18-3/4″ x 22-1/2″ drop ceiling material into door can be done as required, while door is off or during re-assembly. Bend capture  tabs over ceiling panel to hold in place.
    Door Removal

Shelf Options and Operation

  1. To access shelf and equipment, retract hinges located under the shelf on the side you wish to rotate down. Support the shelf until the cables engage it.
    To fully remove the shelf, remove the two #6-32 screws on the sides that retain the cable clip. Slide the clips out of the shelf. The shelf should hang on the two remaining spring hinges. Carefully retract the final two spring hinges while fully supporting shelf as it rotates out of the Ceiling Box.
    Shelf Options and Operation
    For shelf installation, the arrows on the shelf must point away from the receptacles at the back of the box and towards the door latch at the front. Fully retract 2 hinges on the rear of the shelf and lift shelf into Ceiling Box. Align both pins with the Ceiling Box embosses located on either side of chassis. Insert point side of the cable clips into the side of the shelf, rotate until the end of the clip passes through the shelf, then slide clip back. Install the two #6-32 screws through the shelf side into the clips. Fully retract the remaining 2 hinges on the front of the shelf and rotate shelf into Ceiling Box engaging the hinge pins in the front embosses.
    The shelf may be flipped over and mounted to the top of the Ceiling Box using the same spring hinge operation. In this position the cables will not function as rotational supports.
    Clip Removal (cable not shown – reverse steps to install)
    Shelf Options and Operation
    Shelf Removal (reverse steps to install)
    Shelf Options and Operation
    4a. Remove shelf to mount electronics. Use existing  holes/slot pattern adding additional holes if required  to adequately secure equipment. Reinstall shelf and  make electrical connections as required.
    4b. To install 2RU rack-sized equipment, install 2RU Mounting Brackets as shown. Install rack unit and reinstall shelf into Ceiling Box. Make electrical connections as required.
    MAXIMUM DISTRIBUTED LOAD – 40LBS

Logo

Documents / Resources

| FSR CB-MNT1 CB Mounting Kit With 4 x 100 Inch Cables [pdf] Instruction Manual
CB-MNT1 CB Mounting Kit With 4 x 100 Inch Cables, CB-MNT1, CB Mounting Kit With 4 x 100 Inch Cables, Mounting Kit With 4 x 100 Inch Cables, 100 Inch Cables, Cables
---|---

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals