PZ C-3030 Running Boards Installation Guide
- June 1, 2024
- PZ
Table of Contents
PZ C-3030 Running Boards
Tools Required
- 13mm Socket
- Ratchet
- Torque Wrench
Notes
- Read this instruction carefully before starting installation.
- Proper tools will improve the quality of installation and reduce the time required.
- If missing parts or any damage found, please take a picture, and contact us.
Step 1
- Locate three mounting positions on each side.
- Carefully clean the factory paint on the studs before installation. Do not use power tools.
Step 2
- Attach the bracket to the rocker panel, feed factory studs through the holes on the bracket.
- Secure with (3) M8 flat washers, (3) M8 lock washers, (3) M8 hex nuts.
- Repeat to install all brackets. Do not fully tighten.
Step 3
- Remove (6) M8 hex bolts and (6) M8 flat washers from the back of the step bar.
- Slide mounting tracks to proper positions.
- With assistance, lift and attach the step bar to brackets. Secure the step bar on brackets with (6) M8 hex bolts and (6) M8 flat washers.
- Repeat to install the other side step bar. Do not fully tighten.
Step 4
- Tighten M8 hex nuts on vehicle with 15 ft. Ibs. torque.
- Adjust the step bar to level and tighten M8 hex bolts with 15 ft. Ibs. torque.
- After the step bar installed, periodic check to ensure all mounting hardware remains secure and tight.
Part List
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>