PZ CV-W061 Crew Cab Running Boards Instruction Manual
- June 1, 2024
- PZ
Table of Contents
PZ CV-W061 Crew Cab Running Boards
Tools Required
- 13mm Socket
- Ratchet
- Torque Wrench
Notes
- Read this instruction carefully before starting installation.
- Proper tools will improve the quality of installation and reduce the time required.
- If missing parts or any damage is found, please take a picture, and contact us.
Step 1
- Locate (3) mounting positions on each side.
- There are 4 mounting positions on each side, we will use the 1st, 2nd, 4th.
- Clean the sealant and dirt around mounting positions.
- Remove rubber plugs and clean factory threaded inserts.
Step 2
- Attach the bracket to the rocker panel and secure it with (2) M8 hex bolts, and (2) M8 flat washers.
- Repeat to install other brackets, do not fully tighten.
Step 3
- Remove (6) M8 hex bolts and (6) M8 flat washers behind the step bar.
- Slide mounting tracks to proper positions.
- With assistance, lift and attach the step bar to brackets. Secure the step bar on brackets with (6) M8 hex bolts and (6) M8 flat washers.
- Repeat to install the other side step bar, do not fully tighten.
Step 4
- Tighten M8 hex bolts on a vehicle with 15 ft. Ibs. torque.
- Adjust the step bar to level and tighten M8 hex bolts with 15 ft. Ibs. torque.
- After the step bar is installed, periodic checks to ensure all mounting hardware remains secure and tight.
Part List
Read User Manual Online (PDF format)
Loading......