PA250 Powertech Articulated Arm Gate Opener Instruction Manual
- June 1, 2024
- POWERTECH
Table of Contents
PA250 Powertech Articulated Arm Gate Opener
GENERAL SAFETY WARNINGS AND PRECAUTIONS
WARNING!
- Please read this instruction manual carefully before the installation of the gate-automated system,
- This manual is exclusively for qualified installation personnel, Powertech Automation Inc, is not responsible for improper installation and failure to comply with local electrical and building regulations,
- Keep all the components of the kit content and this manual for further consultation,
- In this manual, please pay extra attention to the contents marked by the symbol: A
- Be aware of the hazards that may exist in the procedures of installation and operation of the gate-automated system,
- Besides, the installation must be carried out in conformity with local standards and regulations,
- If the system is correctly installed and used following all the standards and regulations, it will ensure a high degree of safety,
- Make sure that the gates work properly before installing the gate-automated system and confirm the gates are appropriate for the application, Do not let children operate or play with the gate-automated system,
- Do not cross the path of the gate-automated system when operating,
- Please keep all the control devices and any other pulse generator away from children to avoid the gate-automated system being activated accidentally,
- Do not make any modifications to any components except that it is mentioned in this manual,
- Do not try to manually open or close the gates before you release the gear motor,
- If there is a failure that cannot be solved and is not mentioned in this manual, please contact qualified installation personnel,
- Do not use the gate-automated system before all the procedures and instructions have been carried out and thoroughly read,
- Test the gate-automated system weekly and have qualified installation personnel to check and maintain the system at least every 6 months, Install warning signs (if necessary) on both sides of the gate to warn the people in the area of potential hazards.
PRODUCT DESCRIPTION AND INTENDED USE
KIT CONTENT
- Motor 1 (Master) including PC190U control box and WBl WiFi module 1
- Motor 2 (Slave) 1
- Straight and curved arms 2
- Li-Shape fixing plate 2
- Screws for Li-Shape fixing plate 4
- Nut for screws number 5 and 8 x8
- Front end bracket 2
- Screws for front-end bracket 4
- Gaskets 4
- Screws for straight and curved arms 2
- Nut for screws number 10 2.
- Nut for screws number 10 2.
- Screws for mechanical stoppers 4
- Mechanical stoppers 8
- Cable gland 4
- Flashing light 2
- Photocells 1
- Remote 1
PRODUCT USAGE LIMITS
USAGE LIMITS
- Max gate weight: 250kg
- Max gate length: 2.5Meters
DIMENSIONS
INSTALLATION
PRE-INSTALLATION CHECKS
Installation must be carried out by expert qualified personnel and in full
compliance with current regulations.
Before commencing the installation of the motor, make sure to:
- Check that all the materials are in good working order and suited to the intended applications.
- Gate status verification:
- Make sure the structure of the gate is sturdy, the hinges work,
- Ensure that the gate has been properly installed and that it swings freely in both directions,
- Make sure that there are no frictions between moving and non-moving parts,
- Make sure that the weight and dimensions of the gate leaf fall within the operating limits
- Max leaf weight: 250kg
- Max leaf length: 2.5 meters
INSTALLATION OF THE MOTORS
DIMENSION CHART
Refer to the dimension chart to choose the correct dimensions of the motors
and installation position,
- A: Distance between the hinge and the pillar bracket
- B: Distance between the hinge and the side of the motor,
- C: Distance between the hinge and the front fixing bracket
INSTALLATION OF THE GEAR MOTOR
- Refer to the dimension chart to determine the correct dimensions and position to be installed, (figure 1)
- Check if the mounting surface is smooth, vertical and rigid. Mark it and drill the 4 holes. (figure 2)
- Fix the U-shape fixing plate with the corresponding screw and nuts. (figure 3)
- Install the motor on the U-shaped fixing plate with corresponding screws and nuts. (figure 4)
- After positioning the curved arm on the bottom of the motor, release the motor and position the minor arm on the end of the curved arm and mounting bracket with corresponding screws and nuts. (figure 5)
MECHANICAL STOPPERS ADJUSTMENT
Open limit adjustment
Unlock the gear motor, and manually move the gate to the fully open position.
Place and fix the corresponding mechanical stopper.
Close limit adjustment
Unlock the gear motor, and manually move the gate to the fully closed
position. Place and fix the corresponding mechanical stopper.
MANUAL RELEASE OF THE MOTOR
To unlock the device
- Insert the key
- 2. Turn it anti-clockwise by 180°
- Turn it anti-clockwise by 180°
- The gate leaf can now be moved manually to the desired position.
To lock the device
- Insert the key
- Turn it clockwise by 180°
- Remove the key
COMMISSIONING
PC19OU CONTROL BOARD
MOTOR is the MASTER Motor that will open first and close last
WARNING!
BY DEFAULT, THE SAFETY DEVICES PH1-PH2 ARE DISABLED. (PARAMETER FD AND FE)
When powering on for the first time, the LED display will show N-L = System
learning not completed DURING STANDARD OPERATION, the photocells are wired and
aligned, and the 3 LED indicators are OFF. Control: By passing your hand in
front of the photocell beam, LED l will switch ON.
MOTOR WIRING
MOTOR WITHOUT LIMIT SWITCH
MANDATORY: Make sure stoppers are placed on the ground or the motors
-
(Refer to parameter table – PARAMETER (DEFAULT SETTING)
-
MOTOR 1 INSTALLED ON THE LEFT PILLAR
-
MOTOR 1 INSTALLEO ON THE RIGHT PILLAR
-
WIRING OF MOTOR 1 TO MOTOR 2
-
MOTOR WITH LIMIT SWITCH
(Refertoparametertable-PARAMETER ) -
MOTOR 1 INSTALLED ON THE LEFT PILLAR
-
MOTOR 1 INSTALLED ON THE RIGHT PILLAR
WIRING OF ACCESSORIES
SAFETY DEVICE 1 WIRING
SAFETY DEVICE 2 WIRING
AUXILIARY DEVICE WIRING
- Okey: Complete open
- Skey: Partial open
12V AVAILABLE TO POWER ACCESSORIES
BATTERY WIRING (OPTIONAL)
REMOTE LEARNING
MANDATORY:
Before processing system learning, you must first memorize the remotes.
SAFETY DEVICE LOGIC
MOTOR REACTION FOLLOWING A FAULT ON CONTACT PHl / PH2 – PARAMETER SETTINGS
SELECTION – FA
IMPORTANT: PHI and PH2 are disabled by default.
PROGRAMMING
INDICATIONS ON THE LEO DISPLAY
During the programming and operation, the LED display is ON and provides
indications.
- N-L = System learning not completed
- LEA= In the process of system learning
- S-G = Completed system learning for single-gate
- D-G = Completed system learning for dual gate
- OPN = Motors in the opening phase
- CLS = Motors in the closing phase
- STP = Fault (display for second)
- CLN = Return to the default setting
- Fl= Motor wiring fault
PARAMETER SETTINGS
WARNING!
Depending on the placement of the control unit the programming buttons may be
located on the right or left side, the RF button at the top or bottom.
PARAMETER
PARAMETER TABLE (PARTIE 1)
Temporary suspension of automatic closing function (Party mode)
It is possible to deactivate/reactivate the automatic closing function by
pressing simultaneously buttons A + B of the remote.
- Automatic closing activated=> Automatic closing deactivated= 4 Buzzer sounds
- Automatic closing deactivated=> Automatic closing activated= 2 Buzzer sounds
PARAMETER TABLE (PARTIE 2)
SYSTEM LEARNING
PRE-CHECK UP BEFORE LEARNING PROCEDURE
- The motors, photocells and other safety devices are installed and wired,
- The stoppers or limit switchs are installed and adjusted,
- The remotes are memorized,
- Unlock the motors, Manually move the gate to 75% of the travel and lock the motors,
SYSTEM LEARNING PROCEDURE MANDATORY
-
Press and hold SET for 3 seconds,
-
The LED display , Releases the button to launch the system learning procedure.
The first movement of the motors must be in the closing direction. If this is not the case, power off and invert the wiring of the 2 motors M+/M- -
The motor(s) perform(s) closing/opening movements then stop,
-
The display of (2 motors) or SG (1 motor) confirms that the learning procedure has been completed successfully.
During the learning phase, the LED display the motor power consumption (in Ampere). If this value fluctuates a lot during the gagateovement make sure to verify if there are any hard spots.
DUAL GATE MOVEMENT DURING SYSTEM LEARNING PROCEDURE:
- Motor 2 close
- Motor 1 close
- Motor 1 open
- Motor 2 open
- Motor 2 close
- Motor 1 close
RESET TO DEFAULT SETTINGS
- Press and hold /SET/
- Laffichagede signifies reunited operation, confirming that the system has successfully returned to default settings, Release the buttons=> The LED display (System learning not completed)
SMARTPHONE CONTROL WITH EYE OPEN MOBILE APPLICATION
WB1 Wi-Fi MODULE
- LED INDICATORS
- R BUTTON (RESET)
- P BUTTON (PAIR)
- TERMINALS
LED INDICATORS DESCRIPTION
- BLUE: The blue LED blinks before pairing and stays ON when successfully connected to the WiFi,
- GREEN: The green LED blinks once when the WBl module receives a signal from the application, If the WiFi is disconnected or the WiFi signal is weak, the green LED blinks constantly,
- RED: Indicates that the system is disconnected or the WiFi password is incorrect
The range between the WBl module and the router is 30 meters (in open space),
QUICK SET-UP GUIDE
- Select which smartphone will be the« owner» smartphone
- The owner can give authorization to the other shared smartphones,
- Activate and connect the smartphone to the WiFi that will be connected to the WBl WiFi module,
- EYED PEN is only compatible with a 2.4Ghz WiFi network
- Download the EYED PEN application on your smartphone.
- Sign up and create a login and password, Confirm and exit the EYEOPEN application, Open your mailbox and activate the link received in the email.
- Open and login into the application.
- Tap the(+) icon to add the device and follow the instructions, Key in confirm the WiFi password and select the device.
- Set up the 6-digit PIN Code twice and confirm.
- By default, choose 123456 (Twice), You can later modify This PIN code once you are more comfortable with the application.
- You have now access to the operation interface of the device, You can control, modify settings, add accessories or share the access.
- a. Operation button
- b. Setting page
- c. Device information
- d. Version information
- e. Related settings
- f. Accessories connection
- g. Device sharing
TECHNICAL SPECIFICATIONS
MAINTENANCE AND TROUBLESHOOTING
MAINTENANCE
Conduct the following operations at least every 6 months. For intensive use
scenarios, shorten this delay.
Disconnect the power supply
- Clean and lubricate the screws, hinges with grease.
- Make sure the fastening is properly tightened.
- Make sure the wire connection is in good functioning condition.
Connect the power supply
- Double-check the parameter settings.
- Check the manual release.
- Check the photocells and other safety devices.
TROUBLESHOOTING
Documents / Resources
|
POWERTECH PA250 Powertech Articulated Arm Gate
Opener
[pdf] Instruction Manual
PA250 Powertech Articulated Arm Gate Opener, PA250, Powertech Articulated Arm
Gate Opener, Articulated Arm Gate Opener, Arm Gate Opener, Gate Opener
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>