Carrier 24TPB7 Series Performance 2 Stage Air Conditioner Instruction Manual
- June 1, 2024
- Carrier
Table of Contents
- Carrier 24TPB7 Series Performance 2 Stage Air Conditioner
- Product Usage Instructions
- Installation Instructions
- Installation
- InteliSense™ Technology
- Airflow Selections (ECM Furnaces)
- Start-Up
- Compressor Operation
- Check Charge
- TROUBLESHOOTING
- MAJOR COMPONENTS
- CARE AND MAINTENANCE
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Carrier 24TPB7 Series Performance 2 Stage Air Conditioner
Specifications
- Model: 24TPB7
- Maximum Liquid-line Size: 3/8-in. OD for all residential applications including long line
Product Usage Instructions
Installation Recommendations
- Locate the unit away from areas where operational noise may disturb occupants.
- Ensure proper sizing of vapor and liquid tubes based on unit capacity.
- Run refrigerant tubes in a direct path to minimize turns and bends.
- Allow some slack between the structure and the unit to absorb vibrations.
- Seal openings when passing refrigerant tubes through walls using RTV or silicon-based caulk.
- Avoid contact between tubing and water pipes, ductwork, joists, studs, floors, or walls.
- Avoid suspending refrigerant tubing with rigid wires or straps that directly touch the tubing.
- Ensure proper insulation of tubing, using hanger straps if necessary.
- Isolate hanger straps from insulation using metal sleeves if required.
Safety Considerations
Follow all safety codes and precautions mentioned in the manual.
Always wear safety gear like glasses, protective clothing, and gloves. Have a
fire extinguisher nearby during installation. Ensure the main electrical
disconnect switch is OFF before servicing the system to prevent electrical
shock hazards.
Charging Information
The outdoor unit comes pre-charged with system refrigerant for operation.
Check refrigerant charge using information on the control box cover or in the
Check Charge section of the manual. Use 15 ft. (4.6 m) of field-supplied or
factory accessory tubing for connecting to AHRI rated indoor units.
Filter Drier Installation
Always install the factory-supplied liquid-line filter drier. Refer to the
Product Data Digest for the appropriate part number if replacement is needed.
Obtain replacement filter driers from authorized distributors.
FAQ
-
Q: What should I do if I hear abnormal noise during operation?
A: Check the installation of the unit, ensuring proper placement away from potential noise sources like windows or decks. Make sure all refrigerant tubes are correctly sized and installed without unnecessary bends or turns. -
Q: How do I check the refrigerant charge?
A: Refer to the charging information located on the control box cover or in the manual’s Check Charge section for guidance on checking and adjusting the refrigerant charge.
24TPB7
Performance™ Series 2-Stage Air Conditioner with Puron® Refrigerant
and InteliSense™ Technology
2 to 5 Nominal Tons
Installation Instructions
NOTE: Read the entire instruction manual before starting the installation.
SAFETY CONSIDERATIONS
Improper installation, adjustment, alteration, service, maintenance, or use
can cause explosion, fire, electrical shock, or other conditions which may
cause death, personal injury, or property damage. Consult a qualified
installer, service agency, or your distributor or branch for information or
assistance. The qualified installer or agency must use factory-authorized kits
or accessories when modifying this product. Refer to the individual
instructions packaged with the kits or accessories when installing.
Follow all safety codes. Wear safety glasses, protective clothing, and work
gloves. Use quenching cloth for brazing operations. Have fire extinguisher
available. Read these instructions thoroughly and follow all warnings or
cautions included in literature and attached to the unit. Consult local
building codes and current editions of the National Electrical Code (NEC) NFPA
70. In Canada, refer to current editions of the Canadian Electrical Code CSA
22.1.
Recognize safety information. This is the safety-alert symbol When you see
this symbol on the unit and in instructions or manuals, be alert to the
potential for personal injury. Understand these signal words; DANGER, WARNING,
and CAUTION. These words are used with the safety-alert symbol. DANGER
identifies the most serious hazards which will result in severe personal
injury or death. WARNING signifies hazards which could result in personal
injury or death. CAUTION is used to identify unsafe practices which would
result in minor personal injury or product and property damage. NOTE is used
to highlight suggestions which will result in enhanced installation,
reliability, or operation.
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Before installing, modifying, or servicing system, main electrical disconnect
switch must be in the OFF position. There may be more than 1 disconnect
switch. Lock out and tag switch with a suitable warning label.
WARNING
EXPLOSION HAZARD
Failure to follow this warning could result in death, serious personal injury,
death, and/or property damage.
Never use air or any gas containing oxygen for leak testing or operating
refrigerant compressors. Never allow compressor suction pressure to operate in
a vacuum with service valves closed. See Service Manual for pump-down
instructions.
Installation Recommendations
NOTE: In some cases noise in the living area has been traced to gas
pulsations from improper installation of equipment.
- Locate unit away from windows, patios, decks, etc. where unit operation sound may disturb customer.
- Ensure that vapor and liquid tube diameters are appropriate for unit capacity.
- Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends.
- Leave some slack between structure and unit to absorb vibration.
- When passing refrigerant tubes through the wall, seal opening with RTV or other pliable silicon-based caulk. (See Fig. 1.)
- Avoid direct tubing contact with water pipes, duct work, floor joists, wall studs, floors, and walls.
- Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap which comes in direct contact with tubing.(See Fig. 1.)
- Ensure that tubing insulation is pliable and completely surrounds vapor tube.
- When necessary, use hanger straps which are 1 in. (25.4 mm) wide and conform to shape of tubing insulation. (See Fig. 1.)
- Isolate hanger straps from insulation by using metal sleeves bent to conform to shape of insulation.
The outdoor unit contains system refrigerant charge for operation with AHRI rated indoor unit when connected by 15 ft. (4.6 m) of field-supplied or factory accessory tubing. For proper unit operation, check refrigerant charge using charging information located on control box cover and/or in the Check Charge section of this instruction.
IMPORTANT: Maximum liquid-line size is 3/8-in. OD for all residential
applications including long line.
IMPORTANT: Always install the factory-supplied liquid-line filter drier.
If replacing the filter drier, refer to Product Data Digest for appropriate
part number. Obtain replacement filter driers from your distributor or branch.
Table 1 – Accessory Usage
Accessory
| Required for Low Ambient Cooling Applications (Below 55°F / 12.8°C)| **Required for Long Line Applications *| Required for Sea Coast Applications**
(within 2 miles/3.2 km)
---|---|---|---
Compressor Start Assist Capacitor and Relay| Yes| Yes| No
Crankcase Heater| Yes (standard on some units)| Yes (standard on some units)|
No
Evaporator Freeze Thermostat| Yes| No| No
Hard Shutoff TXV
| Yes
(standard w/factory approved indoor unit)
| Yes
(standard w/factory approved indoor unit)
| Yes
(standard w/factory approved indoor unit)
High Pressure Switch| Recommended| Recommended| No
Loss of Charge Switch| Recommended| Recommended| No
Liquid Line Solenoid Valve| No| See Residential Piping and Long Line
Guideline| No
Low-Ambient Pressure Switch| Yes| No| No
Support Feet| Recommended| No| Recommended
Winter Start Control| Yes| No| No
*. For tubing line sets between 80 and 200 ft. (24.38 and 60.96 m) and/or 35 ft. (10.7 m) vertical differential, refer to Residential Piping and Long Line Guideline.
Installation
CAUTION
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate
protective clothing and gloves when handling parts.
IMPORTANT: All split system and packaged air conditioners must be
installed pursuant to applicable regional efficiency standards issued by the
Department of Energy.
Check Equipment and Job Site
UNPACK UNIT
Move to final location. Remove carton taking care not to damage unit.
Inspect Equipment
File claim with shipping company prior to installation if shipment is damaged
or incomplete. Locate unit rating plate on unit corner panel. It contains
information needed to properly install unit. Check rating plate to be sure
unit matches job specifications.
Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie down
bolts should be used and fastened through knockouts provided in unit base pan.
Refer to unit mounting pattern in Fig. 2 to determine base pan size and
knockout hole location.
For hurricane tie downs, contact local distributor for details and PE
(Professional Engineer) certification, if required by local authorities.
On rooftop applications, mount on level platform or frame. Place unit above a
load-bearing wall and isolate unit and tubing set from structure. Arrange
supporting members to adequately support unit and minimize transmission of
vibration to building. Consult local codes governing rooftop applications.
Roof mounted units exposed to winds may require wind baffles. Consult the
Application Guideline and Service Manual – Residential Split System Air
Conditioners and Heat Pumps for wind baffle construction.
NOTE: Unit must be level to within ±2° (±3/8 in./ft,±9.5 mm/m.) per
compressor manufacturer specifications.
Clearance Requirements
When installing, allow sufficient space for airflow clearance, wiring,
refrigerant piping, and service. Allow 24 in. (610 mm) clearance to service
end of unit and 48 in. (1219 mm) above unit. For proper airflow, a 6-in. (152
mm) clearance on 1 side of unit and 12-in. (305 mm) on all remaining sides
must be maintained. Maintain a distance of 18 in. (457 mm) between units.
Position so water, snow, or ice from roof or eaves cannot fall directly on
unit.
On rooftop applications, locate unit at least 6 in. (152 mm) above roof
surface.
Make Piping Connections
WARNING
PERSONAL INJURY AND ENVIRONMENTAL HAZARD Failure to follow this warning could
result in personal injury or death. Relieve pressure and recover all
refrigerant before system repair or final unit disposal. Use all service ports
and open all flow-control devices, including solenoid valves.
Federal regulations require that you do not vent refrigerant to the
atmosphere. Recover during system repair or final unit disposal.
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation.
If ANY refrigerant tubing is buried, provide a 6-in (152 mm) vertical rise at
service valve. Refrigerant tubing lengths up to 36-in (914 mm) may be buried
without further special consideration. Do not bury lines more than 36-in. (914
mm).
Outdoor units may be connected to indoor section using accessory tubing
package or field-supplied refrigerant grade tubing of correct size and
condition. Rated tubing diameters shown in Table 2 are recommended up to 80
ft. (24 m). See Product Data for acceptable alternate vapor diameters and
associated capacity losses. For tubing requirements beyond 80 ft. (24 m),
substantial capacity and performance losses can occur. Following the
recommendations in the Long Line Guideline will reduce these losses. Refer to
Table 2 for field tubing diameters. Refer to Table 1 for accessory
requirements.
There are no buried-line applications greater than 36-in. (914 mm) allowed.
If refrigerant tubes or indoor coil are exposed to atmosphere, they must be
evacuated to 500 microns to eliminate contamination and moisture in the
system.
Outdoor Unit Connected to Factory Approved Indoor Unit
Outdoor unit contains approximate system refrigerant charge for operation with
approved AHRI rated indoor unit when connected by 15 ft (4.6 m) of
field–supplied or factory–accessory tubing, and factory supplied filter drier.
Check refrigerant charge for maximum efficiency.
Refrigerant Tubing Connection Outdoor
Connect vapor and liquid tubes to fittings on vapor and liquid service valves
(see Table 2.) Use refrigerant grade tubing
Sweat Connection
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation.
Service valves must be wrapped in a heat-sinking material such as a wet cloth
while brazing.
CAUTION
BURN HAZARD
Failure to follow this Caution may result in personal injury. Components will
be HOT after brazing. Wear appropriate personal protective equipment and allow
to cool before handling parts and equipment
Use refrigeration grade tubing. Service valves are closed from factory and ready for brazing. After wrapping service valve with a wet cloth, braze sweat connections using industry accepted methods and materials. Consult local code requirements. Refrigerant tubing and indoor coil are now ready for leak testing. This check should include all field and factory joints
Table 2 – Refrigerant Connections and Recommended Liquid and Vapor Tube Diameters
UNIT SIZE (SERIES) | LIQUID | **RATED VAPOR*** |
---|---|---|
Connection & Max. Tube Diameter | Connection Diameter | **Tube |
Diameter
24| 3/8| 3/4| 3/4
36| 3/8| 7/8| 7/8
48| 3/8| 7/8| 1-1/8
60**| 3/8| 7/8| 1-1/8
- Units are rated with 25 ft. (7.6 m) of lineset. See Product Data sheet for performance data when using different size and length lineset.
Notes
- Do not apply capillary tube or fixed orifice indoor coils to these units.
- For Tubing Set lengths between 80 and 200 ft. (24.38 and 60.96 m) horizontal or 35 ft. (10.7 m) vertical differential 250 ft. (76.2 m) Total Equivalent Length), refer to the Residential Piping and Long Line Guideline -Air Conditioners and Heat Pumps using R-410A refrigerant.
Install Liquid-Line Filter Drier Indoor
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation.
- Installation of filter drier in liquid line is required.
- Filter drier must be wrapped in a heat-sinking material such as a wet cloth while brazing.
Refer to Fig. 3 and install filter drier as follows:
- Braze 5-in. liquid tube to the indoor coil.
- Wrap filter drier with damp cloth.
- Braze filter drier to above 5-in. (127 mm) liquid tube. Flow arrow must point towards indoor coil.
- Connect and braze liquid refrigerant tube to the filter drier.
Evacuate Refrigerant Tubing and Indoor Coil
CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation.
Never use the system compressor as a vacuum pump.
Refrigerant tubes and indoor coil should be evacuated using the recommended deep vacuum method of 500 microns. The alternate triple evacuation method may be used (see triple evacuation procedure in service manual). Always break a vacuum with dry nitrogen.
Deep Vacuum Method
The deep vacuum method requires a vacuum pump capable of pulling a vacuum of
500 microns and a vacuum gage capable of accurately measuring this vacuum
depth. The deep vacuum method is the most positive way of assuring a system is
free of air and liquid water. A tight dry system will hold a vacuum of 1000
microns after approximately 7 minutes. See Fig. 4.
Final Tubing Check
IMPORTANT: Check to be certain factory tubing on both indoor and outdoor unit has not shifted during shipment. Ensure tubes are not rubbing against each other or any sheet metal or wires. Pay close attention to feeder tubes, making sure wire ties on feeder tubes are secure and tight.
Make Electrical Connections
Be sure field wiring complies with local and national fire, safety, and
electrical codes, and voltage to system is within limits shown on unit rating
plate. Contact local power company for correction of improper voltage. See
unit rating plate for recommended circuit protection device.
NOTE: Operation of unit on improper line voltage constitutes abuse and
could affect unit reliability. See unit rating plate. Do not install unit in
system where voltage may fluctuate above or below permissible limits.
NOTE: Use copper wire only between disconnect switch and unit.
NOTE: Install branch circuit disconnect of adequate size per NEC to
handle unit starting current. Locate disconnect within sight from and readily
accessible from unit, per Section 440-14 of NEC.
Route Ground and Power Wires
Remove access panel to gain access to unit wiring. Extend wires from
disconnect through power wiring hole provided and into unit control box.
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death. The
unit cabinet must have an uninterrupted or unbroken ground to minimize
personal injury if an electrical fault should occur. The ground may consist of
electrical wire or metal conduit when installed in accordance with existing
electrical codes.
Connect Ground and Power Wires
Connect ground wire to ground connection in control box for safety. Connect
power wiring to contactor as shown in Fig. 5.
Connect Control Wiring
-
Route 24-v control wires through control wiring grommet and connect leads to control wiring (See Fig. 6). Refer to Installation Instructions packaged with thermostat.
-
All low voltage wiring, including those from the 2-stage AC, should be connected in the low voltage side of the panel.
Use No. 18 AWG color-coded, insulated (35°C minimum) wire. If thermostat is located more than 100 ft. (30.48 m) from unit, as measured along the control voltage wires, use No. 16 AWG color-coded wire to avoid excessive voltage drop. -
All wiring must be NEC Class 2 and must be separated from incoming power leads.
-
Use furnace transformer, fan coil transformer, or accessory transformer for control power, 24v/40va minimum.
NOTE : Use of available 24v accessories may exceed the minimum 40va power requirement. Determine total transformer loading and increase the transformer capacity or split the load with an accessory transformer as required.
InteliSense™ Technology
This unit is InteliSense capable when used with an Ecobee for Carrier smart
thermostat with InteliSense technology.
InteliSense technology allows for the collection of performance data to be
sent to the cloud. Utilizing Carrier’s digital tools, dealers can gather
system settings and equipment data, with homeowner opt-in, to provide quicker
and more efficient service. The unit comes with the following sensors
installed on the control board:
- Liquid Service Valve Pressure (LSVP)
- Liquid Service Valve Temperature (LSVT)
- Outside Air Temperature (OAT)
- Vapor Service Valve Pressure (VSVP)
- Vapor Service Valve Temperature (VSVT)
The amber LED is illuminated solid when there is power to the product. The
green LED is illuminated solid when there is communication between the control
board and the InteliSense-enabled thermostat.
For more information, refer to the thermostat advanced installation and
configuration instructions found at:
Carrier.HVACPartners.com/InteliSense
Or, by scanning this QR Code:
NOTE: A new thermostat will show up in connected portal 24 hours after
field installation so field guages are needed for install.
NOTE: The outdoor temperature sensor does not show up on this new
thermostat display so it should not be used for troubleshooting or charging.
NOTE: AC units with InteliSense technology do not come with factory
installed pressure switches.
Final Wiring Check
IMPORTANT: Check factory wiring and field wire connections to ensure
terminations are secured properly. Check wire routing to ensure wires are not
in contact with tubing, sheet metal, etc.
Compressor Crankcase Heater
When equipped with a crankcase heater, furnish power to heater a minimum of 24
hours before starting unit. To furnish power to heater only, set thermostat to
OFF and close electrical disconnect to outdoor unit.
A crankcase heater is required if refrigerant tubing is longer than 80
ft.(24.38 m). Refer to the Application Guideline and Service Manual Long Line
Section-Residential Split-System Air Conditioners and Heat Pumps.
Airflow Selections (ECM Furnaces)
The ECM Furnaces provide blower operation to match the capacities of the compressor during high and low stage cooling operation. Tap selections on the furnace control board enable the installing technician to select the proper airflows for each stage of cooling. Below is a brief summary of the furnace airflow configurations
- The Y2 call for high stage cooling energizes the “Cool” tap on the control board. The gray wire from cool tap is connected to tap 5 on the motor. Refer to the furnace Product Data to find the corresponding airflow. If the airflow setting for high cooling needs to be switched from tap 5 to a different tap, jumper a connection from the cool tap to the desired tap so that the Y2 signal is communicated via the cool tap to the desired speed tap.
- The Y1 call for low stage cooling energizes the “Fan” tap on the control board. The red wire from the fan tap is connected to tap 1 on the motor. Refer to the furnace Product Data to find the corresponding airflow. If the airflow setting for low cooling needs to be switched from tap 1 to a different tap, jumper a connection from the Fan tap to the desired tap so that the Y1 signal is communicated via the Fan tap to the desired speed tap. The Y1 setting will also govern the continuous fan airflow for the furnace.
Refer to the literature for the furnace for further details.
Airflow Selection for Variable Speed Furnaces
The variable speed furnaces provide blower operation to match the capacities
of the compressor during high and low stage cooling operation. The furnace
control board allows the installing technician to select the proper airflows
for each stage of cooling. Below is a summary of required adjustments. See
furnace installation instructions for more details:
- Turn SW1–5 ON for 400 CFM/ton airflow or OFF for 350 CFM/ton airflow. Factory default is OFF.
- The A/C DIP switch setting determines airflow during high stage cooling operation. Select the A/C DIP switch setting corresponding to the available airflow shown in the furnace Installation Instructions that most closely matches the required airflow shown in the air conditioning Product Data for HIGH speed.
- The CF DIP switch setting determines airflow during low stage cooling operation. Select the CF DIP switch setting corresponding to the available airflow shown in the furnace installation instructions that most closely matches the required airflow shown in the air conditioning Product Data for LOW speed. If a higher or lower continuous fan speed is desired, the continuous fan speed can be changed using the fan switch on the thermostat. Refer to the furnace Installation Instructions for details of how to use this feature.
Airflow Selection for FT4B Fan Coils
The FT4B provides high- and low-stage blower operation to match the capacities
of the compressor at high- and low-stage.
To select recommended airflow, refer to the FT4B Installation Instructions.
The FT4B utilizes a control board that allows the installing technician to
select proper airflows. This fan coil has an adjustable blower-off delay
factory set at 90 sec. for high- and low-stage blower operation.
Install Electrical Accessories
Refer to the individual instructions packaged with kits or accessories when
installing.
Start-Up
CAUTION
UNIT OPERATION AND SAFETY HAZARD
Failure to follow this caution may result in personal injury, equipment damage
or improper operation.?
- Do not overcharge system with refrigerant.
- Do not operate unit in a vacuum or at negative pressure.
- Compressor dome temperatures may be hot.
CAUTION
PERSONAL INJURY HAZARD
Failure to follow this caution may result in personal injury.
Wear safety glasses, protective clothing, and gloves when handling refrigerant
and observe the following:
?Front seating service valves are equipped with Schrader valves.
Follow these steps to properly start up the system
- After system is evacuated, fully back seat (open) liquid and vapor service valves.
- Unit is shipped with valve stem(s) front seated (closed) and caps installed. Replace stem caps after system is opened to refrigerant flow (back seated). Replace caps finger-tight and tighten with wrench an additional 1/12 turn.
- Close electrical disconnects to energize system.
- Set room thermostat at desired temperature. Ensure that set point is below indoor ambient temperature and is set low enough to energize high stage. In order to start the system in high stage, refer to the literature for the installed thermostat and adjust the set point so that the differential between the room temperature and the set temperature energizes Y2.
- Set room thermostat to COOL and fan control to ON or AUTO mode, as desired.
- Operate unit for 15 minutes. Verify system refrigerant charge by measuring the sub-cooling and comparing with the published sub-cool on the rating plate.
System Function And Sequence Of Operation
This model utilizes a 2-stage cooling indoor thermostat. With a call for first
stage cooling, the outdoor fan and low-stage compressor are energized. If low-
stage cannot satisfy cooling demand, high-stage is energized by the second
stage of indoor thermostat. After second stage is satisfied, the unit returns
to low-stage operation until first stage is satisfied or until second stage is
required again.
When both first stage and second stage cooling are satisfied, the compressor
will shut off. Therefore, with first stage of cooling Y1 is powered on; and
with second stage of cooling Y1 and Y2 are powered on. When a 2-stage unit is
operating at low-stage, system vapor (suction) pressure will be higher than a
standard single-stage system or high-stage operation.
Compressor Operation
The basic scroll design has been modified with the addition of an internal
unloading mechanism that opens a by-pass port in the first compression pocket,
effectively reducing the displacement of the scroll. The opening and closing
of the by-pass port is controlled by an internal electrically operated
solenoid. The modulated scroll uses a single step of unloading to go from full
capacity to approximately 67% capacity. A single speed, high efficiency motor
continues to run while the scroll modulates between the two capacity steps.
Modulation is achieved by venting a portion of the gas in the first suction
pocket back to the low side of the compressor, thereby reducing the effective
displacement of the compressor. Full capacity is achieved by blocking these
vents, thus increasing the displacement to 100%.
A DC solenoid in the compressor controlled by a rectified 24 volt AC signal in
the external solenoid plug moves the slider ring that covers and uncovers
these vents. The vent covers are arranged in such a manner that the compressor
operates at approximately 67% capacity when the solenoid is not energized and
100% capacity when the solenoid is energized. The loading and unloading of the
two step scroll is done “on the fly” without shutting off the motor between
steps.
NOTE: 67% compressor capacity translates to approximately 75%cooling capacity at the indoor coil.
Check Charge
NOTE: CHARGE IN HIGH STAGE ONLY
- Factory charge amount and desired subcooling are shown on unit rating plate. Charging method is shown on information plate inside unit. To properly check or adjust charge, conditions must be favorable for subcooling charging. Favorable conditions exist when the outdoor temperature is between 70°F and 100°F (21°C and 38°C), and the indoor temperature is between 70°F and 80°F (21°C and 27°C). Follow the procedure below:
- Unit is factory charged for 15ft (5 m) of lineset. Adjust charge by adding or removing 0.6 oz/ft of 3/8 liquid line above or below 15ft (5 m) respectively.
- For standard refrigerant line lengths (80 ft/24.38 m or less), allow system to operate in high-stage cooling mode at least 15 minutes. If conditions are favorable, check system charge by subcooling method. If any adjustment is necessary, adjust charge slowly and allow system to operate for 15 minutes to stabilize before declaring a properly charged system.
- If the indoor temperature is above 80°F (27°C), and the outdoor temperature is in the favorable range, adjust system charge by weight based on line length and allow the indoor temperature to drop to 80°F (27°C) before attempting to check system charge by subcooling method as described above.
- If the indoor temperature is below 70°F (21°C), or the outdoor temperature is not in the favorable range, adjust charge for line set length above or below 15ft (5 m) only. Charge level should then be appropriate for the system to achieve rated capacity. The charge level could then be checked at another time when the both indoor and outdoor temperatures are in a more favorable range.
NOTE: If line length is beyond 80 ft (24.38 m) or greater than 20 ft
(6.10 m) vertical separation, See Long Line Guideline for special charging
requirements.
Final Checks
IMPORTANT: Before leaving job, be sure to do the following:
- Ensure that all wiring is routed away from tubing and sheet metal edges to prevent rub-through or wire pinching.
- Ensure that all wiring and tubing is secure in unit before adding panels and covers. Securely fasten all panels and covers.
- Tighten service valve stem caps to 1/12-turn past finger tight.
- Leave Owner’s Manual with owner. Explain system operation and periodic maintenance requirements outlined in manual.
- Fill out Dealer Installation Checklist and place in customer file.
TROUBLESHOOTING
If the compressor fails to operate with a cooling call, Table 3 can be used to verify if there is any damage to the compressor windings causing system malfunction.
Table 3 – Winding Resistance
Winding
| Winding resistance at 70°F +/- 20°F
(21.11°C +/- 11.11°C)
---|---
Unit Size
24| 36| 48| 60
Start (S-C)| 1.652| 1.587| 1.299| 1.203
Run (R-C)| 1.065| 0.751| 0.477| 0.383
Troubleshooting for proper switching between low- and high-stages
Check the suction pressures at the service valves. Suction pressure should be
reduced by 3-10% when switching from low to high stage.
NOTE: The liquid pressures are very similar between low- and high-stage
operation, so liquid pressure should not be used for troubleshooting.
Compressor current should increase 20 to 45% when switching from low to high
stage. The compressor solenoid when energized in high stage, should measure
24vac at the leads inside control box.
When the compressor is operating in low stage, the 24v DC compressor solenoid
coil is de-energized. When the compressor is operating in high stage, the 24v
DC solenoid coil is energized.
The solenoid plug harness that is connected to the compressor has an internal
rectifier that converts the 24v AC signal to 24v DC.
DO NOT INSTALL A PLUG WITHOUT AN INTERNAL RECTIFIER.
Unloader Test Procedure:
The unloader is the compressor internal mechanism, controlled by the DC
solenoid, that modulates between high- and low-stage. If it is suspected that
the unloader is not working, the following methods may be used to verify
operation:
- Operate the system and measure compressor amperage. Cycle the unloader on and off at 30 second plus intervals at the thermostat (from low- to high-stage and back to low-stage). Wait 10 seconds after staging to high before taking a reading. The compressor amperage should go up or down at least 20 percent.
- If step one does not give the expected results, remove the solenoid plug from the compressor and, with the unit running and the Thermostat calling for high-stage, test the voltage output at the plug with a DC voltmeter. The reading should be 24 volts DC.
- If the correct DC voltage is at the control circuit molded plug, measure the compressor unloader coil resistance. The resistance should be approximately 1640 milliohms. If the coil resistance is infinite or is grounded, the compressor must be replaced.
MAJOR COMPONENTS
2-Stage Compressor
The 2-stage compressor contains motor windings that provide 2-pole (3500 RPM)
operation.
Compressor Internal Relief
The compressor is protected by an internal pressure relief (IPR) which
relieves discharge gas into compressor shell when differential between suction
and discharge pressures exceed 550 – 625 psi. The compressor is also protected
by an internal overload attached to motor windings.
Compressor Control Contactor
The contactor has a 24 volt coil and is controlled by Y1 input from the
thermostat
CARE AND MAINTENANCE
For continuing high performance and to minimize possible equipment failure, periodic maintenance must be performed on this equipment. Frequency of maintenance may vary depending upon geographic areas, such as coastal applications. See Owner’s Manual for information.
Use of the AHRI Certified TM Mark indicates a manufacturer’s participation in the program For verification of certification for individual products, go to www.ahridirectory.org.
Training
My Learning Center is your central location for professional residential HVAC
training resources that help strengthen careers and businesses. We believe in
providing high quality learning experiences both online and in the classroom.
Access My Learning Center with your HVAC Partners credentials at
www.mlctraining.com. Please contact us a
mylearning@carrier.com with questions.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>